Call for input 2026 - Recommendations from the MEP to SBM 021

Background

At its 12th (A6.4-MEP012) and 13th meeting (A6.4-MEP013), the Methodological Expert Panel (MEP) agreed to recommend the following documents for adoption by the Article 6 Supervisory Body at the SBM 021 meeting.

Draft documents open for input 

For each document, comments must be submitted using the corresponding electronic commenting template. 

Annex Commenting template
(in electronic form)

MEP012, Annex 1 - Draft Methodological tool: Analysis of lock-in risk (v.02.0) 

Template for input to MEP012, Annex 1

MEP012, Annex 2 - Draft Standard: Demonstration of additionality in mechanism methodologies (v.02.0) 

Template for input to MEP012, Annex 2

MEP012, Annex 4 - Draft Methodological tool: Fraction of non-renewable biomass (v.02.0)

Template for input to MEP012, Annex 4

MEP013, Annex 1 - Draft Mechanism methodology: N20 abatement from nitric acid production (v.02.0) 

Template for input to MEP013, Annex 1

Stakeholders are required to submit comments by the established deadline and use the designated commenting template (in electronic form) provided above to ensure their input is duly considered. The use of AI-generated content is prohibited, as such submissions often lack relevance and fail to address the specific issues presented in the published documents.

Submission Details  

The call for public input is open from 27 April to 6 May 2026. Please submit your input by 6 May 2026, 23:59 CEST

---------------------


This call is now closed. Please contact the secretariat at A6.4mechanism-meth@unfccc.int for any queries.

The received inputs are publicly available in the table below and will be considered by the Supervisory Body.

---------------------

Input received on MEP012, Annex 1 - Draft Methodological tool: Analysis of lock-in risk (v.02.0) 

Date Submission
06 May 2026 Green Farm CO2FREE

 

Input received on MEP012,  Annex 2 -  Draft Standard: Demonstration of additionality in mechanism methodologies (v.02.0) 

Date Submission
06 May 2026 PreventX AI

 

Input received on MEP012, Annex 4 - Draft Methodological tool: Fraction of non-renewable biomass (v.02.0)

Date Submission
06 May 2026 Green Farm CO2FREE
05 May 2026 Carbon Market Watch

 

MEP013, Annex 1 - Draft Mechanism methodology: N20 abatement from nitric acid production (v.02.0) 

Date Submission
06 May 2026 CCP

 

Content