Cards view
List view
Showing 4 of 4 results
4Draft decisions
Sharm el-Sheikh Implementation Plan. Revised draft decision -/CMA.4
Symbol: FCCC/PA/CMA/2022/L.21
Date:
Draft conclusions
Cooperation with other international organizations. Draft conclusions SBSTA
Symbol: FCCC/SBSTA/2021/L.2
Date:
Draft conclusions
Analysis of mitigation potentials and identification of ranges of emission reduction objectives of Annex I Parties. Draft conclusions proposed by the Chair.
Symbol: FCCC/KP/AWG/2007/L.4
Date:
Draft conclusions
Analysis of mitigation potentials and programme of work. Draft conclusions proposed by the Chair.
Symbol: FCCC/KP/AWG/2007/L.2
Date:
Showing 4 of 4 results
| Symbol | Document name | Type | Publication date | |
|---|---|---|---|---|
FCCC/PA/CMA/2022/L.21
|
Sharm el-Sheikh Implementation Plan. Revised draft decision -/CMA.4
|
Draft decisions
|
||
FCCC/SBSTA/2021/L.2
|
Cooperation with other international organizations. Draft conclusions SBSTA
|
Draft conclusions
|
||
FCCC/KP/AWG/2007/L.4
|
Analysis of mitigation potentials and identification of ranges of emission reduction objectives of Annex I Parties. Draft conclusions proposed by the Chair.
|
Draft conclusions
|
||
FCCC/KP/AWG/2007/L.2
|
Analysis of mitigation potentials and programme of work. Draft conclusions proposed by the Chair.
|
Draft conclusions
|