Cards view
List view
Showing 12 of 23 results
12Intersessional documents
Strategy for workplan implementation KCI5
Symbol: KCI/2021/5/9
Date:
Intersessional documents
Key messages from the IPCC Special report on the ocean and cryosphere in a changing climate
Symbol:
Date:
Intersessional documents
Overview of new knowledge on the LTGG emerging form the IPCC 2018-19 Special Reports
Symbol:
Date:
Intersessional documents
Scenarios compatible with the LTGG considered in the IPCC 2018-19 special reports
Symbol:
Date:
Intersessional documents
Information and knowledge gaps addressed in the IPCC 2018-19 Special Reports with regard to scenarios to achieve the LTGG and the range of associated impacts
Symbol:
Date:
Intersessional documents
Challenges and opportunities for achieving the LTGG, as identified in the IPCC 2018-19 Special Reports
Symbol:
Date:
Intersessional documents
Draft Concept note for TP on capacity builiding using stakeholders
Symbol:
Date:
Intersessional documents
KCI3-inputs-European Bank for Reconstruction and Development
Symbol:
Date:
Intersessional documents
KCI3-inputs-Organization of the Petroleum Exporting Countries
Symbol:
Date:
Showing 10 of 23 results
Symbol | Document name | Type | Publication date | |
---|---|---|---|---|
KCI/2022/7/3
|
KCI7 Tentative work schedule
|
Intersessional documents
|
||
KCI/2021/5/9
|
Strategy for workplan implementation KCI5
|
Intersessional documents
|
||
Key messages from the IPCC Special report on the ocean and cryosphere in a changing climate
|
Intersessional documents
|
|||
Overview of new knowledge on the LTGG emerging form the IPCC 2018-19 Special Reports
|
Intersessional documents
|
|||
Scenarios compatible with the LTGG considered in the IPCC 2018-19 special reports
|
Intersessional documents
|
|||
Information and knowledge gaps addressed in the IPCC 2018-19 Special Reports with regard to scenarios to achieve the LTGG and the range of associated impacts
|
Intersessional documents
|
|||
Challenges and opportunities for achieving the LTGG, as identified in the IPCC 2018-19 Special Reports
|
Intersessional documents
|
|||
KCI3-inputs-WWF
|
Intersessional documents
|
|||
Draft Concept note for TP on capacity builiding using stakeholders
|
Intersessional documents
|
|||
KCI3-inputs-European Bank for Reconstruction and Development
|
Intersessional documents
|