Filters

Cards view
List view
Showing 3 of 3 results
3
Draft conclusions
Outcome of the first round of the international assessment and review process (2014–2015). Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2016/L.12
Date:
Draft conclusions
Outcome of the first round of the international assessment and review process (2014–2015). Draft conclusions proposed by the Chair. Addendum.
Symbol: FCCC/SBI/2016/L.12/Add.1
Date:
Draft conclusions
The scope of the next periodic review of the long-term global goal under the Convention and of overall progress towards achieving it. Draft conclusions proposed by the Chairs.
Symbol: FCCC/SB/2016/L.1
Date:
Showing 3 of 3 results
Symbol Document name Type Publication date
FCCC/SBI/2016/L.12
Outcome of the first round of the international assessment and review process (2014–2015). Draft conclusions proposed by the Chair.
Draft conclusions
View details
FCCC/SBI/2016/L.12/Add.1
Outcome of the first round of the international assessment and review process (2014–2015). Draft conclusions proposed by the Chair. Addendum.
Draft conclusions
View details
FCCC/SB/2016/L.1
The scope of the next periodic review of the long-term global goal under the Convention and of overall progress towards achieving it. Draft conclusions proposed by the Chairs.
Draft conclusions
View details

Filters