Cards view
List view
Showing 9 of 9 results
9Pre-session documents
Report of the Adaptation Committee. Corrigendum
Symbol: FCCC/SB/2021/6/Corr.1
Date:
Pre-session documents
Good practices and lessons learned in adaptation planning processes addressing ecosystems, human settlements, water resources and health, and in processes and structures for linking national and local adaptation planning: a synthesis of case studies. Note by the secretariat
Symbol: FCCC/SBSTA/2015/4
Date:
Technical papers
Potential costs and benefits of adaptation options: A review of existing literature. Technical paper.
Symbol: FCCC/TP/2009/2/Rev.1
Date:
Draft conclusions
Draft decision -/CP.14. Advancing the Bali Action Plan. Proposal by the President.
Symbol: FCCC/CP/2008/L.4
Date:
Meeting documents
Ideas and proposals on the elements contained in paragraph 1 of the Bali Action Plan. Submissions from intergovernmental organizations.
Symbol: FCCC/AWGLCA/2008/MISC.6
Date:
Draft conclusions
Enabling the full, effective and sustained implementation of the Convention through long-term cooperative action now, up to and beyond 2012. Draft conclusions proposed by the Chair.
Symbol: FCCC/AWGLCA/2008/L.7
Date:
Draft conclusions
Enabling the full, effective and sustained implementation of the Convention through long-term cooperative action now, up to and beyond 2012. Draft conclusions proposed by the Chair.
Symbol: FCCC/AWGLCA/2008/L.5
Date:
Draft conclusions
Development of a work programme. Draft conclusions proposed by the Chair.
Symbol: FCCC/AWGLCA/2008/L.2
Date:
Showing 9 of 9 results
| Symbol | Document name | Type | Publication date | |
|---|---|---|---|---|
FCCC/SB/2021/6/Corr.1
|
Report of the Adaptation Committee. Corrigendum
|
Pre-session documents
|
||
FCCC/SB/2021/6
|
Report of the Adaptation Committee
|
Pre-session documents
|
||
FCCC/SBSTA/2015/4
|
Good practices and lessons learned in adaptation planning processes addressing ecosystems, human settlements, water resources and health, and in processes and structures for linking national and local adaptation planning: a synthesis of case studies. Note by the secretariat
|
Pre-session documents
|
||
FCCC/TP/2009/2/Rev.1
|
Potential costs and benefits of adaptation options: A review of existing literature. Technical paper.
|
Technical papers
|
||
FCCC/CP/2008/L.4
|
Draft decision -/CP.14. Advancing the Bali Action Plan. Proposal by the President.
|
Draft conclusions
|
||
FCCC/AWGLCA/2008/MISC.6
|
Ideas and proposals on the elements contained in paragraph 1 of the Bali Action Plan. Submissions from intergovernmental organizations.
|
Meeting documents
|
||
FCCC/AWGLCA/2008/L.7
|
Enabling the full, effective and sustained implementation of the Convention through long-term cooperative action now, up to and beyond 2012. Draft conclusions proposed by the Chair.
|
Draft conclusions
|
||
FCCC/AWGLCA/2008/L.5
|
Enabling the full, effective and sustained implementation of the Convention through long-term cooperative action now, up to and beyond 2012. Draft conclusions proposed by the Chair.
|
Draft conclusions
|
||
FCCC/AWGLCA/2008/L.2
|
Development of a work programme. Draft conclusions proposed by the Chair.
|
Draft conclusions
|