Cards view
List view
Showing 12 of 38 results
12Pre-session documents
Status and successes of, challenges in and lessons learned from projects undertaken through the regional climate technology transfer and finance centres. Note by the secretariat
Symbol: FCCC/SBI/2022/INF.13
Date:
Draft conclusions
Poznan strategic programme on technology transfer
Symbol: FCCC/SBI/2022/L.10
Date:
Draft conclusions
Development and transfer of technologies: Poznan strategic programme on technology transfer
Symbol: FCCC/SBI/2019/L.6
Date:
Draft conclusions
Poznan strategic programme on technology transfer. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2017/L.23
Date:
Showing 10 of 38 results
Symbol | Document name | Type | Publication date | |
---|---|---|---|---|
Zone Map Area B - Delegation Pavilions 1
|
Catering and venue information
|
|||
Zone Map Area B - Delegation Pavilions 2
|
Catering and venue information
|
|||
Zone Map Area B - Delegation Pavilions 3
|
Catering and venue information
|
|||
Zone Map Area C - Delegation Pavilions 4
|
Catering and venue information
|
|||
Zone Map Area C - Delegation Pavilions 5
|
Catering and venue information
|
|||
Zone Map Area B
|
Catering and venue information
|
|||
Zone Map Area D-E
|
Catering and venue information
|
|||
COP 27 detailed venue map
|
Catering and venue information
|
|||
FCCC/SBI/2022/INF.13
|
Status and successes of, challenges in and lessons learned from projects undertaken through the regional climate technology transfer and finance centres. Note by the secretariat
|
Pre-session documents
|
||
FCCC/SBI/2022/L.10
|
Poznan strategic programme on technology transfer
|
Draft conclusions
|