Cards view
List view
Showing 12 of 28 results
12Concept note
Sports for Climate Action: Playing to Win Against Climate Change Event Concept Note
Symbol:
Date:
Pre-session documents
Structured expert dialogue on the second periodic review of the long-term global goal under the Convention (2020–2022). Synthesis report by the co-facilitators of the structured expert dialogue
Symbol: FCCC/SB/2022/3
Date:
Non-official session documents
Summary report of the PR2 SED3 by the Co-facilitators
Symbol:
Date:
Non-official technical papers
Draft policy brief on approaches for strengthening coastal and ocean adaptation: integrating technology and nature-based solutions
Symbol:
Date:
Draft decisions
The 2013–2015 review. Proposal by the President.
Symbol: FCCC/CP/2015/L.10
Date:
Draft conclusions
The 2013–2015 review. Draft conclusions proposed by the Chair.
Symbol: FCCC/SB/2015/L.1
Date:
party submissions
Submission from the Alliance of Small Island States
Symbol: FCCC/SB/2015/CRP.2
Date:
Draft conclusions
The 2013–2015 review. Draft conclusions proposed by the Chair.
Symbol: FCCC/SB/2014/L.9
Date:
Showing 10 of 28 results
Symbol | Document name | Type | Publication date | |
---|---|---|---|---|
Sports for Climate Action: Playing to Win Against Climate Change Event Concept Note
|
Concept note
|
|||
S4CA Methodology and Data Quality Assurance
|
Publications
|
|||
2022 S4CA Risks and Opportunities
|
Reports
|
|||
FCCC/SB/2022/3
|
Structured expert dialogue on the second periodic review of the long-term global goal under the Convention (2020–2022). Synthesis report by the co-facilitators of the structured expert dialogue
|
Pre-session documents
|
||
Summary report of the PR2 SED3 by the Co-facilitators
|
Non-official session documents
|
|||
Draft policy brief on approaches for strengthening coastal and ocean adaptation: integrating technology and nature-based solutions
|
Non-official technical papers
|
|||
Sports for Climate Action prospective signatory booklet
|
Guidelines
|
|||
Sports for Climate Action report template
|
Reports
|
|||
FCCC/CP/2015/L.10
|
The 2013–2015 review. Proposal by the President.
|
Draft decisions
|
||
FCCC/SB/2015/L.1
|
The 2013–2015 review. Draft conclusions proposed by the Chair.
|
Draft conclusions
|