Cards view
List view
Showing 12 of 35 results
12Non-official technical papers
Draft policy brief on approaches for strengthening coastal and ocean adaptation: integrating technology and nature-based solutions
Symbol:
Date:
Draft conclusions
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2016/L.8
Date:
Draft conclusions
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair. Addendum. Recommendation of the Subsidiary Body for Implementation.
Symbol: FCCC/SBI/2016/L.8/Add.1
Date:
Pre-session documents
Review of the joint implementation guidelines.Recommendations by the Joint Implementation Supervisory Committee.
Symbol: FCCC/SBI/2016/INF.8
Date:
Draft conclusions
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2015/L.30
Date:
Draft conclusions
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2015/L.5
Date:
Showing 10 of 35 results
Symbol | Document name | Type | Publication date | |
---|---|---|---|---|
MPGCA COP27 OD Steel Breakthrough Implementation Lab Event
|
Publications
|
|||
MPGCA COP27 FL OD Carbon Removals
|
Publications
|
|||
MPGCA COP27 OD Net Zero Carbon Events
|
Publications
|
|||
Draft policy brief on approaches for strengthening coastal and ocean adaptation: integrating technology and nature-based solutions
|
Non-official technical papers
|
|||
Outcome: Industry Action Event
|
Reports
|
|||
Climate Action Pathway: Industry. Action Table
|
Publications
|
|||
Climate Action Pathway: Industry. Vision and Summary
|
Publications
|
|||
FCCC/SBI/2016/L.8
|
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair.
|
Draft conclusions
|
||
FCCC/SBI/2016/L.8/Add.1
|
Review of the joint implementation guidelines. Draft conclusions proposed by the Chair. Addendum. Recommendation of the Subsidiary Body for Implementation.
|
Draft conclusions
|
||
FCCC/SBI/2016/INF.8
|
Review of the joint implementation guidelines.Recommendations by the Joint Implementation Supervisory Committee.
|
Pre-session documents
|