Cards view
List view
Showing 7 of 7 results
7Draft conclusions
Capacity-building under the Convention. Proposal by the President.
Symbol: FCCC/CP/2015/L.6
Date:
Draft conclusions
Capacity-building under the Kyoto Protocol. Proposal by the President.
Symbol: FCCC/KP/CMP/2015/L.6
Date:
Draft conclusions
Capacity-building under the Convention. Draft conclusions proposed by the Co-Chairs.
Symbol: FCCC/SBI/2015/L.33
Date:
Draft decisions
Capacity-building under the Kyoto Protocol. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2015/L.34
Date:
Draft conclusions
Work of the Consultative Group of Experts on National Communications from Parties not included in Annex I to the Convention. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2015/L.21
Date:
Workshop reports
Report on the workshop on potential ways to enhance capacity-building activities. Note by the secretariat
Symbol: FCCC/SBI/2015/INF.16
Date:
Pre-session documents
Good practices and lessons learned in adaptation planning processes addressing ecosystems, human settlements, water resources and health, and in processes and structures for linking national and local adaptation planning: a synthesis of case studies. Note by the secretariat
Symbol: FCCC/SBSTA/2015/4
Date:
Showing 7 of 7 results
Symbol | Document name | Type | Publication date | |
---|---|---|---|---|
FCCC/CP/2015/L.6
|
Capacity-building under the Convention. Proposal by the President.
|
Draft conclusions
|
||
FCCC/KP/CMP/2015/L.6
|
Capacity-building under the Kyoto Protocol. Proposal by the President.
|
Draft conclusions
|
||
FCCC/SBI/2015/L.33
|
Capacity-building under the Convention. Draft conclusions proposed by the Co-Chairs.
|
Draft conclusions
|
||
FCCC/SBI/2015/L.34
|
Capacity-building under the Kyoto Protocol. Draft conclusions proposed by the Chair.
|
Draft decisions
|
||
FCCC/SBI/2015/L.21
|
Work of the Consultative Group of Experts on National Communications from Parties not included in Annex I to the Convention. Draft conclusions proposed by the Chair.
|
Draft conclusions
|
||
FCCC/SBI/2015/INF.16
|
Report on the workshop on potential ways to enhance capacity-building activities. Note by the secretariat
|
Workshop reports
|
||
FCCC/SBSTA/2015/4
|
Good practices and lessons learned in adaptation planning processes addressing ecosystems, human settlements, water resources and health, and in processes and structures for linking national and local adaptation planning: a synthesis of case studies. Note by the secretariat
|
Pre-session documents
|