Transition of CDM activities

Access Transition Regulations 

NOW OPEN: The dedicated interface is now open for project participants of a CDM afforestation and reforestation (A/R) project activity or CDM A/R PoA and the CPAs therein, that are eligible to transition to Article 6.4 mechanism to submit a request for transition. The deadline for submission of a request for transition of a CDM A/R project activity or CDM A/R PoA and the CPAs therein to the Article 6.4 mechanism is 31 December 2025.

Reminder: The deadline to submit a transition request for a CDM project or PoA (excluding CDM A/R projects and PoAs) has passed. It was 31 December 2023, 24:00 (CET). See the list of requested transitions here.


What are the provisions for transitioning CDM projects and programmes of activities (PoAs)?

According to decisions made by Parties to the Paris Agreement (CMA), specifically decision 3/CMA.3 (annex, chapter XI.A), decision 7/CMA.4 (annex I), and decision -CMA.6projects and PoAs registered under the CDM can transition to the Article 6.4 mechanism if they meet all required conditions. This includes projects listed as provisional under temporary measures by the CDM Executive Board.

 

Navigating this page

Tabs at the top of the page: Use the tabs at the top of the page to access information categorized as follows:

  • Transitioning CDM Projects and PoAs: General information and a table of CDM projects and PoAs eligible for transition.
  • Process Information: Details on CDM activities eligible for transition, the list of activities requesting transition, the Global Stakeholder Consultation process, and more.

Accordion Sorting: Use the accordion below to view CDM activities approved by Host Parties for transition and transition status.

Process Illustrations: Access a high-level overview (PDF) or a detailed step-by-step guide (PDF) of the CDM transition process.

Contact for inquiries: Reach out to us at A6.4mechanism-info@unfccc.int       

This table provides a list of CDM activities approved by Host Parties for transition to the Article 6.4 mechanism. It includes links to the information pages for each CDM activity (see Column 2: CDM Project or PoA Title) and to the additional documentation submitted by project participants as part of their transition requests, which becomes available after the secretariat completes the substantive check (see Column 10: Transition Status).

Host Party CDM Project or PoA Title Reference Number CDM Project or PoA Component Project Activity (Only for PoAs) Methodology End of the Current Crediting Period Type of Transition Request Publication Date of Host Party Approval Transition Status
Bangladesh Installation of Solar Home Systems in Bangladesh 2765 Programme of activities 2765-P1-0010-CP1, 2765-P1-0011-CP1, 2765-P1-0013-CP1, 2765-P2-0001-CP2, 2765-P2-0002-CP2, 2765-P2-0003-CP2, 2765-P2-0004-CP2, 2765-P2-0005-CP2, 2765-P2-0006-CP2, 2765-P2-0007-CP2, 2765-P2-0008-CP2, 2765-P2-0009-CP2, 2765-P2-0012-CP2, 2765-P2-0014-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Pending additional documentation from project participant
Bangladesh Improving Kiln Efficiency in the Brick Making Industry in Bangladesh 5125 Project Activity N/A Retain CDM methodology at transition 31-Aug-2021 Transition of CDM activity 06-Jan-2025 Pending additional documentation from project participant
Bangladesh Improving Kiln Efficiency in the Brick Making Industry in Bangladesh (Bundle-2) 6085 Project Activity N/A Retain CDM methodology at transition 24-Nov-2023 Transition of CDM activity 06-Jan-2025 Pending additional documentation from project participant
Bangladesh Reducing Gas Leakages within the Titas Gas Distribution Network in Bangladesh 10077 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bangladesh Improved cookstove program in Bangladesh supported by the Republic of Korea 10431 Programme of activities 10431-P1-0001-CP1, 10431-P1-0002-CP1, 0431-P1-0003-CP1, 10431-P1-0004-CP1, 10431-P1-0005-CP1 Retain CDM methodology at transition 22-Jun-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bangladesh IDCOL Improved Cook Stove Program 10512 Programme of activities 10512-P1-0001-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Pending additional documentation from project participant
Bangladesh Development of a sustainable drinking water supply platform based on clean development mechanism 10538 Programme of activities 10538-P1-0001-CP1, 10538-P1-0002-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Pending additional documentation from project participant
Bangladesh Reducing Gas Leakages within the Bakhrabad Gas Distribution Network in Bangladesh 10559 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bangladesh Reducing Gas Leakages within the Karnaphuli Gas Distribution Network in Bangladesh 10560 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bangladesh Reducing Gas Leakages within the Jalalabad Gas Distribution Network in Bangladesh 10561 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bangladesh Reducing Gas Leakages within the Pashchimanchal Gas Distribution Network in Bangladesh 10562 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 06-Jan-2025 Substantive check completed
Bhutan Dagachhu Hydropower Project, Bhutan 2746 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 24-Sep-2024 Pending additional documentation from project participant
Bhutan Punatsangchhu-I Hydroelectric Project, Bhutan 9210 Project Activity N/A Retain CDM methodology at transition 31-Dec-2024 Transition of CDM activity 24-Sep-2024 Pending additional documentation from project participant
Bhutan Mangdechhu Hydroelectric Project Authority 10472 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 24-Sep-2024 Pending additional documentation from project participant
Dominican Republic Los Cocos Wind Farm Project 7093 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 27-Aug-2024 Pending additional documentation from project participant
Dominican Republic Los Cocos II Wind Farm Project 7100 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 27-Aug-2024 Pending additional documentation from project participant
Dominican Republic, Uganda PoA for the Reduction of emission from non-renewable fuel from cooking at household level 7359 Programme of activities (multi-Party) N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 27-Aug-24 (Domincan Republic); 28-Feb-25 (Uganda) Pending additional documentation from project participant
Ghana Man and Man Enterprise Improved Cooking Stoves CDM Programme in Ghana supported by Republic of Korea 10430 Programme of activities 10430-P1-0001-CP1, 10430-P1-0002-CP1 Retain CDM methodology at transition 30-May-2025 Transition of CDM activity 12-Nov-2024 Substantive check completed
Ghana Ghana Improved Cookstove Project by EWP in Republic of Korea 10576 Programme of activities 10576-P1-0001-CP1, 10576-P1-0002-CP1, 10576-P1-0003-CP1, 10576-P1-0004-CP1 , 10576-P1-0005-CP1, 10576-P1-0006-CP1, 10576-P1-0007-CP1, 10576-P1-0008-CP1, 10576-P1-0009-CP1, 10576-P1-0010-CP1, 10576-P1-0011-CP1, 10576-P1-0012-CP1, 10576-P1-0013-CP1, 10576-P1-0014-CP1, 10576-P1-0015-CP1, 10576-P1-0016-CP1, 10576-P1-0017-CP1, 10576-P1-0018-CP1, 10576-P1-0019-CP1, 10576-P1-0020-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 08-Oct-2024 Substantive check completed
Myanmar Clean Energy Program Supported by Republic of Korea 10415 Programme of activities 10415-P1-0002-CP1, 10415-P1-0003-CP1 Retain CDM methodology at transition 27-Aug-2025 Transition of CDM activity 27-Aug-2024 Approved
Myanmar The Project of CCC program of Activities (PoA) for Distribution of Improved Cookstoves (ICS) in Developing South and Southeast Asia Countries (Myanmar) 10471 Programme of activities 10471-P1-0001-CP1, 10471-P1-0002-CP1, 10471-P1-0003-CP1, 10471-P1-0004-CP1, 10471-P1-0005-CP1, 10471-P1-0006-CP1, 10471-P1-0007-CP1, 10471-P1-0008-CP1, 10471-P1-0009-CP1, 10471-P1-0010-CP1, 10471-P1-0011-CP1, 10471-P1-0012-CP1, 10471-P1-0013-CP1, 10471-P1-0014-CP1, 10471-P1-0015-CP1, 10471-P1-0016-CP1, 10471-P1-0017-CP1, 10471-P1-0018-CP1, 10471-P1-0019-CP1, 10471-P1-0020-CP1, 10471-P1-0021-CP1, 10471-P1-0022-CP1, 10471-P1-0023-CP1, 10471-P1-0024-CP1, 10471-P1-0025-CP1, 10471-P1-0026-CP1, 10471-P1-0027-CP1, 10471-P1-0028-CP1, 10471-P1-0029-CP1, 10471-P1-0030-CP1, 10471-P1-0031-CP1, 10471-P1-0032-CP1, 10471-P1-0033-CP1, 10471-P1-0034-CP1, 10471-P1-0035-CP1, 10471-P1-0036-CP1, 10471-P1-0037-CP1, 10471-P1-0038-CP1, 10471-P1-0039-CP1, 10471-P1-0040-CP1, 10471-P1-0041-CP1, 10471-P1-0042-CP1, 10471-P1-0043-CP1, 10471-P1-0044-CP1, 10471-P1-0045-CP1, 10471-P1-0046-CP1, 10471-P1-0047-CP1, 10471-P1-0048-CP1, 10471-P1-0049-CP1, 10471-P1-0050-CP1, 10471-P1-0051-CP1, 10471-P1-0052-CP1, 10471-P1-0053-CP1, 10471-P1-0054-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 27-Aug-2024 Approved
Myanmar Mandalay Kyar Ni Kan Landfill Methane Recovery Project 10648 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 8-Apr-2025 Pending additional documentation from project participant
Myanmar Mandalay Thaung Inn Myauk Inn Landfill Methane Recovery Project 10651 Project Activity N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 8-Apr-2025 Pending additional documentation from project participant
Uganda Up Energy Improved Cookstove Programme, Uganda 9956 Programme of activities 9956-P1-0001-CP1, 9956-P1-0002-CP1, 9956-P1-0003-CP1, 9956-P1-0004-CP1, 9956-P1-0005-CP1, 9956-P1-0006-CP1, 9956-P1-0007-CP1, 9956-P1-0008-CP1, 9956-P1-0009-CP1, 9956-P1-0010-CP1, 9956-P1-0011-CP1, 9956-P1-0012, 9956-P1-0013-CP1, 9956-P1-0014-CP1, 9956-P1-0015-CP1, 9956-P1-0016-CP1, 9956-P1-0017-CP1, 9956-P1-0018-CP1, 9956-P1-0019-CP1, 9956-P1-0020-CP1, 9956-P1-0021-CP1, 9956-P1-0022-CP1, 9956-P1-0023-CP1, 9956-P1-0024-CP1, 9956-P1-0025-CP1, 9956-P1-0026-CP1, 9956-P1-0027-CP1, 9956-P1-0028-CP1, 9956-P1-0029-CP1, 9956-P1-0030-CP1, 9956-P1-0031-CP1, 9956-P1-0032-CP1, 9956-P1-0033-CP1, 9956-P1-0034-CP1, 9956-P1-0035-CP1, 9956-P1-0036-CP1, 9956-P1-0037-CP1, 9956-P1-0038-CP1, 9956-P1-0039-CP1, 9956-P1-0040-CP1, 9956-P1-0041-CP1, 9956-P1-0042-CP1, 9956-P1-0043-CP1, 9956-P1-0044-CP1, 9956-P1-0045-CP1, 9956-P2-0046-CP1, 9956-P2-0047-CP1, 9956-P2-0048-CP1, 9956-P2-0049-CP1, 9956-P2-0050-CP1, 9956-P2-0051-CP1, 9956-P2-0052-CP1, 9956-P2-0053-CP1, 9956-P2-0054-CP1, 9956-P2-0055-CP1, 9956-P2-0056-CP1, 9956-P2-0057-CP1, 9956-P2-0058-CP1, 9956-P2-0059-CP1, 9956-P2-0060-CP1, 9956-P2-0061-CP1, 9956-P2-0062-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Impact Carbon Global Safe Water Programme of Activities (PoA) 9948 Programme of activities (multi-Party) 9948-P1-0002-CP1, 9948-P1-0015-CP1, 9948-P1-0014-CP1, 9948-P1-0022-CP1, 9948-P1-0021-CP1, 9948-P1-0020-CP1, 9948-P1-0019-CP1, 9948-P1-0018-CP1, 9948-P1-0017-CP1, 9948-P1-0016-CP1, 9948-P1-0042-CP1, 9948-P1-0041-CP1, 9948-P1-0040-CP1, 9948-P1-0039-CP1, 9948-P1-0038-CP1, 9948-P1-0103-CP1 Retain CDM methodology at transition 30-Apr-2021 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda International water purification programme 5962 Programme of activities (multi-Party) 5962-P1-0002-CP1, 5962-P1-0003-CP1, 5962-P1-0008-CP1, 5962-P1-0009-CP1, 5962-P1-0017-CP1, 5962-P1-0018-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda 10186 Programme of activities 10186-P1-0001-CP1, 10186-P1-0002-CP1 Retain CDM methodology at transition 27-Aug-2022 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda The Uganda Improved Cookstove and Water Purifier Project by the Korea East-West Power Company 10610 Programme of activities N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Bujagali Hydropower Project 4217 Project Activity N/A Retain CDM methodology at transition 30-Nov-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Institutional Improved Cook Stoves for Schools and Institutions in Uganda 10345 Project Activity N/A Retain CDM methodology at transition 29-Feb-2024 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda BioLite Improved Cook stoves Programme 7997 Programme of activities (multi-Party) 7997-P1-0007-CP1, 7997-P1-0011-CP1, 7997-P1-0012-CP1, 7997-P1-0013-CP1, 7997-P1-0014-CP1, 7997-P1-0015-CP1, 7997-P1-0016-CP1, 7997-P1-0017-CP1, 7997-P1-0018-CP1, 7997-P1-0019-CP1, 7997-P1-0020-CP1, 7997-P1-0021-CP1, 7997-P1-0022-CP1, 7997-P1-0023-CP1, 7997-P1-0024-CP1, 7997-P1-0025-CP1, 7997-P1-0026-CP1, 7997-P1-0027-CP1, 7997-P1-0028-CP1, 7997-P1-0029-CP1, 7997-P1-0030-CP1, 7997-P1-0031-CP1, 7997-P1-0032-CP1, 7997-P1-0033-CP1, 7997-P1-0034-CP1, 7997-P1-0035-CP1, 7997-P1-0036-CP1, 7997-P1-0037-CP1, 7997-P1-0038-CP1, 7997-P1-0039-CP1, 7997-P1-0040-CP1 Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Household energy appliance programme 10030 Programme of activities (multi-Party) N/A Retain CDM methodology at transition 09-Mar-2023 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda MicroEnergy Credits – Microfinance for Clean Energy Product Lines – Africa 10341 Programme of activities (multi-Party) 10341-P1-0004-CP1, 10341-P1-0005-CP1 Retain CDM methodology at transition 20-Feb-2024 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Improved cookstove programme for climate & community impact in Uganda & Malawi by SDG 13 Ventures 10349 Programme of activities (multi-Party) N/A Retain CDM methodology at transition 31-Dec-2025 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant
Uganda Mpanga 18 MW Run-of-River Hydropower Project 10312 Project Activity N/A Retain CDM methodology at transition 31-Jul-2023 Transition of CDM activity 28-Feb-2025 Pending additional documentation from project participant

 

Process

According to decisions made by Parties to the Paris Agreement (CMA), specifically decision 3/CMA.3 (annex, chapter XI.A), decision 7/CMA.4 (annex I), and decision -CMA.6, projects and programs registered under the Clean Development Mechanism (CDM) can transition to the Article 6.4 mechanism if they meet all required conditions. This includes projects listed as provisional under temporary measures by the CDM Executive Board.

For more information, refer to the accordions below and check out the FAQs. They offer detailed information on the required conditions, the transition process, deadlines, and more.

A dedicated interface is now open for submissions of transition requests of eligible CDM A/R project activities and CDM A/R programmes of activities and CPAs therein to the Article 6.4 mechanism. 

NOTE: The deadline to submit a transition request for a CDM project or PoA (excluding CDM A/R projects and PoAs) has passed. It was 31 December 2023, 24:00 (CET). See the list of requested transitions here.

 

CDM A/R project activities and CDM A/R programmes of activities and CPAs

The interface is accessible only to focal points for scope of authority (c) in order to ensure its proper use. This measure aimed to prevent any potential misuse, such as the submission of transition requests for CDM A/R activities that are not eligible for transition.

Project participants who expressed their intent to transition shall submit their transition request using the on-line interface no later than 31 December 2025.

Please note that creating a user account is a necessary first step in order to access the transition portal/interface.

Background

CMA, at its sixth session, decided that afforestation and reforestation project activities and PoAs registered under the CDM may transition to the Article 6.4 mechanism provided they meet specified requirements. The SBM, at its fifteenth meeting adopted a revision of the “Procedure: Transition of CDM activities to the Article 6.4 mechanism” operationalizing the transition process for eligible CDM A/R project activities and CDM A/R programmes of activities and CPAs therein to the Article 6.4 mechanism.

Submission Deadline: 31 December 2025

Project participants interested in expressing their intent to transition shall submit their transition request no later than 31 December 2025. Meeting this deadline is crucial, as failure to do so will result in exclusion from transition.

Email Assistance

Project participants that have not received the email with instructions and links to request transition, but believe that their CDM A/R project activities and CDM A/R programmes of activities and CPAs therein are eligible should contact the secretariat at cdmregistration@unfccc.int

If you have any questions or need further information, please don't hesitate to reach out by contacting us at A6.4mechanism-info@unfccc.int.

As per Section 5.2 of the Procedure: Transition of CDM activities to the Article 6.4 mechanism (A6.4-PROC-AC-001), parties, stakeholders, and UNFCCC admitted observer organizations are invited to submit comments in English regarding the transition of CDM project activities, PoAs, and CPAs. Comments should be specific to the activity in transition and comply with the applicable rules.

Please submit your comments, along with the names and contact details of the representing individuals or organizations, through the UNFCCC website's dedicated interface within 28 days of the request's publication. The secretariat will make qualifying comments publicly available on the UNFCCC website, and the Supervisory Body along with DNAs of the involved parties will be informed.

Frequently Asked Questions related to Global Stakeholder Consultation

Q: What is the Global Stakeholder Consultation process and how does it relate to the transition of activities from the Clean Development Mechanism to Article 6.4 Mechanism?

The Global Stakeholder Consultation is an instrument designed by the Supervisory Body to involve stakeholders from across the globe in the process of transitioning eligible Clean Development Mechanism activities to the Article 6.4 mechanism by seeking their input.

Q. Who can submit comments?

Parties, stakeholders and UNFCCC admitted observer organizations may submit comments (in English) on the transition of the CDM project activity, or PoA and CPAs therein, to the secretariat through a dedicated interface on the UNFCCC website. This must be done within 28 days of the publication of the request for transition on the UNFCCC website, as set out in the Procedure: Transition of CDM activities to the Article 6.4 mechanism.

Q. How can comments be submitted?

To submit your comments, you first need to be logged in to the UNFCCC-CDM page using your login credentials. Then, your comments can be submitted through a dedicated interface on the UNFCCC website. Once you are on this page, go to the last column of the project or PoA for which you want to provide a view or comment, and then click on “Submit view/comment” link.

Q: What information is required when submitting comments?

Submitters must provide the names and contact details of the individuals or organizations on whose behalf the comments are submitted. Comments shall be specific to the CDM project activity, or PoA and CPAs being requested for transition or be related to the compliance with applicable rules and regulations for transition.

Q: Is there a time limit for submitting comments?

Yes, comments must be submitted within 28 days of the publication of the transition request on the UNFCCC website.

Q: Can comments be submitted in languages other than English?

No, comments must be submitted in English.

Q: What happens after the submission of comments?

The secretariat will make comments that meet the specified requirements publicly available on the UNFCCC website where the transition request is published. The Supervisory Body and the Designated National Authorities of the Host Party and other Parties involved will also be informed of the publication of comments. Comments that do not meet the specified requirements may not be made publicly available on the UNFCCC website.

Read the FAQs on the transition of CDM activities to the Article 6.4 mechanism. 

If you have any questions or need further information, please don't hesitate to reach out by contacting us at A6.4mechanism-info@unfccc.int.