Cards view
List view
Showing 3 of 3 results
3Draft decisions
National adaptation plans. Draft decision -/CP.30. Proposal by the President
Symbol: FCCC/CP/2025/L.19
Date:
Draft decisions
National adaptation plans. Draft conclusions proposed by the Chair. Addendum
Symbol: FCCC/SBI/2018/L.26/Add.1
Date:
Draft decisions
National adaptation plans. Draft conclusions proposed by the Chair.
Symbol: FCCC/SBI/2017/L.3
Date:
Showing 3 of 3 results
| Symbol | Document name | Type | Publication date | |
|---|---|---|---|---|
FCCC/CP/2025/L.19
|
National adaptation plans. Draft decision -/CP.30. Proposal by the President
|
Draft decisions
|
||
FCCC/SBI/2018/L.26/Add.1
|
National adaptation plans. Draft conclusions proposed by the Chair. Addendum
|
Draft decisions
|
||
FCCC/SBI/2017/L.3
|
National adaptation plans. Draft conclusions proposed by the Chair.
|
Draft decisions
|