Distr.

GENERAL

FCCC/CP/1997/INF.3

25 November 1997


ENGLISH ONLY

 


CONFERENCE OF THE PARTIES

Third session

Kyoto, 1-10 December 1997

Item 3 (a) (ii) of the provisional agenda

COMMUNICATIONS FROM PARTIES NOT INCLUDED

IN ANNEX I TO THE CONVENTION

SECRETARIAT ACTIVITIES RELATING TO TECHNICAL AND FINANCIAL SUPPORT TO PARTIES

A Synopsis

  1. At its second session, the Conference of the Parties (COP), by its decision 3/CP.2, requested the secretariat to prepare a progress report on the state of advancement of activities in the area of technical cooperation, including those known as CC:TRAIN, CC:FORUM, CC:INFO and CC:SUPPORT, for consideration by the sixth session of the Subsidiary Body for Implementation (SBI) and to report to the Conference of the Parties at its third session.



  2. This document summarizes and updates, in synoptical form, information concerning the above areas on which the secretariat had reported to the SBI since the second session of the COP and which included, in particular, a table showing progress in the preparation of national communications from non-Annex I Parties(1). The synopsis contains the following tables:

Table 1: "Status of preparation of national communications from Parties not included in Annex I to the Convention"; Table 2: "Secretariat participation in regional workshops;

Table 3: "CC:TRAIN national workshops"; Table 4: "CC:TRAIN training material";

Table 5: "CC:FORUM"; and Table 6: "CC:INFO national Web site initiative". It should be noted that the activities referred to in decision 3/CP.2 as CC:SUPPORT are contained in a project document prepared by the United Nations Development Programme (UNDP) and submitted for approval to the Global Environment Facility (GEF).

FCCC/CP/1997/INF.3

GE.97

Table 1. Status of Preparation of National Communications

from Parties Not Included in Annex I to the Convention

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Albania

3 Oct 1994

Project underway (expected duration of work: 2 years)

To be initiated (expected duration of work: 2 years)

Completed

(a project proposal was completed in June 1996)

Proposed

Proposed

Algeria

9 Jun 1993

Aug 2000

Project underway

Antigua and Barbuda

2 Feb 1993

Project underway

Argentina

11 Mar 1994

Submission made in July 1997

First National Communication finalized

Finalized

Finalized

Established

Established

Armenia

14 May 1993

Ongoing

Established

Azerbaijan

16 May 1995

Project underway

To be initiated

(expected duration of work: March 1998)

Completed

(January 1997)

Established

Proposed

Bahamas

34421

Project underway (expected duration of work: 18 months)

To be initiated (expected duration of work: 12 months)

Ongoing

Bahrain

28 Dec 1994

July 1999

Project underway

Bangladesh*

15 Apr 1994

Project under preparation

Completed

(July 1996)

Ongoing

Established

Barbados

34415

Project underway

To be initiated

To be initiated

Benin*

30 Jun 1994

September 1999

Ongoing

Ongoing

Ongoing

(expected date of completion: December 1998)

Established

Belize

31 Oct 1994

Project underway

Bhutan*

25 Aug 1995

September 1999

Ongoing

Ongoing

(expected date of completion: June 1998)

Established

Established

Bolivia

3 Oct 1994

To be initiated (expected duration of work: 12 months)

Completed

(October 1996)

To be initiated (expected duration of work: 3 months)

Established

Botswana

27 Jan 1994

Mid to late 1998

Ongoing

Ongoing

Ongoing

Proposed

Proposed

Brazil

28 Feb 1994

Early 1998

Ongoing



* Countries in italics: Least Developed Countries



Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Burkina Faso*

2 Sep 1993

Project underway

(expected duration of work: 2 years)

To be initiated

To be initiated

Established

Established

Burundi*

6 Jan 1997

Cambodia*

18 Dec 1995

Project underway (expected duration of work: 3 years)

To be initiated (expected duration of work: 3 years)

To be initiated (expected duration of work: 2 years)

Proposed

Proposed

Cameroon

19 Oct 1994

September 1998

Ongoing

Cape Verde*

29 Mar 1995

Project underway

Central African Republic*

10 Mar 1993

Project underway (expected duration of work: 2 years)

To be initiated

To be initiated

Established

Proposed

Chad*

7 Jun 1994

Chile

22 Dec 1994

Ongoing

Established

Proposed

China

5 Jan 1993

Ongoing

Ongoing

Colombia

22 Mar 1995

Ongoing

Nearing completion

Established

Comoros*

31 Oct 1994

August 1999

Project under preparation

Congo*

14 Oct 1996

August 1999

Project underway









Cook Islands

20 Apr 1993

Project underway/PICCAP (expected duration of work: 3 years)

To be initiated

(as part of PICCAP, expected duration of work: 1997-99)

To be initiated (expected duration of work: 1997-99)

Costa Rica

26 Aug 1994

Early 1998

Ongoing

Established

Established

Côte d'Ivoire

29 Nov 1994

August 1999

Project under preparation





*Countries in italics: Least Developed Countries









Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Cuba

5 Jan 1994

December 1999

Ongoing

Ongoing

(expected date of completion: June 1998)

To be initiated

( expected date of completion: June 1999)

Established

Established

Cyprus

35717

Democratic People's Republic of Korea

5 Dec 1994

Ongoing

Ongoing

(expected date of completion: Dec 1997)

To be initiated (expected duration of work: 2 months)

Established

Established

Democratic Republic of the Congo*

9 Jan 95

To be initiated (expected duration of work: 24 months)

To be initiated (expected duration of work: 12 months)

To be initiated (GHG mitigation programmes- expected duration of work: 8 months)

Established

Proposed

Djibouti*

27 Aug 1995

August 1999

Project under preparation

Dominica

21 Jun 1993

Project underway

Ecuador

23 Feb 1993

To be initiated

Ongoing

To be initiated

Established

Established

Egypt

5 Dec 1994

July 1999

Ongoing

Established

Established

El Salvador

4 Dec 1995

Ongoing

Established

Established

Eritrea*

24 Apr 1995

Project underway

Ethiopia*

5 Apr 1994

Project underway

Fiji

25 Feb 1993

Ongoing

Ongoing

To be initiated

Gambia*

10 Jun 1994

June 1999

Project underway

Completed (November 1994)

To be initiated (expected duration of work: June 1997 - June 1999)

Established

Established

Georgia

29 Jul 1994

January 1999

Ongoing

Ongoing

(expected date of completion: June 1998)

Completed

(March 1996)

Established

Established

Ghana

6 Sep 1995

Early 1998

Project underway

Ongoing

Established

Established

Grenada

11 Aug 1994



* Countries in italics: Least Developed Countries



Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-

nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Guatemala

15 Dec 1995

Project underway

Guinea*

7 May 1993

Project underway (expected duration of work: 2 years )

To be initiated

Completed

(Feb-May 1997)

Established

Proposed

Guinea-Bissau*

27 Oct 1995

Project underway

Guyana

29 Aug 1994

Project under preparation

Haiti*

25 Sep 1996

Project under preparation

To be initiated

To be initiated

Proposed

Proposed

Honduras

19 Oct 1995

Project underway

India

1 Nov 1993

Project under preparation

Ongoing

Established

Indonesia

23 Aug 1994

Ongoing

Completed

(May 1996)

Ongoing

(expected date of completion: end of 1997)

Established

Established

Iran (Islamic Republic of)

18 Jul 1996

Project underway

Israel

4 Jun 1996

Jamaica

6 Jan 1995

To be initiated (expected duration of work: 2 years)

To be initiated (expected duration of work: 2 years)

To be initiated (expected duration of work: 2 years)

Proposed

Jordan

12 Nov 1993

Submission made in March 1997

First National Communication finalized

Finalized

Established

Established

Kazakhstan

17 May 1995

Kenya

30 Aug 1994

July 1998

Project under preparation

Ongoing

(expected date of completion: November 97)

Established

Established

Kiribati*

34736

Project underway/PICCAP (expected duration of work: 3 years)

Completed (February 1996)

To be initiated

Kuwait

28 Dec 1994



* Countries in italics: Least Developed Countries



Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Lao People's Democratic Republic *

4 Jan 1995

Ongoing

Established

Established

Lebanon

15 Dec 1994

October 1999

Ongoing

Lesotho

7 Feb 1995

October 1998

Ongoing

Ongoing

Ongoing

Established

Established

Liechtenstein

22 Jun 1994

Malawi *

21 Apr 1994

Project underway

Malaysia

13 Jul 1994

December 1998

Ongoing

Ongoing

(expected date of completion: December 1998)

Ongoing

(expected date of completion: December 1998)

Established

Established

Maldives*

9 Nov 1992

1998

Ongoing

To be initiated (expected starting date: 1997-8)

Ongoing

(expected date of completion: 1998)

Established

Established

Mali*

28 Dec 1994

Ongoing

Malta

17 Mar 1994

To be initiated (expected duration of work: 3 months)

To be initiated (expected duration of work: 3 months)

To be initiated (expected duration of work: 3 months)

Marshall Islands

8 Oct 1992

Project underway / PICCAP

(expected duration of work: 3 years)

Completed

To be initiated

Mauritania*

20 Jan 1994

July 1999

Project underway

Mauritius

4 Sep 1992

Early 1998

Ongoing

Completed for 1990 data (31 October 1996)

Ongoing

Established

Established

Mexico

11 Mar 1993

December 1997

Completed

May 1997

Completed

Ongoing

(expected date of completion: end of 1997)

Established

Established

Micronesia (Federated States of)

18 Nov 1993

Ongoing

Ongoing for 1994 data (1990 data completed in February 1995)

Ongoing

(completion expected before December 1997)

Moldova, Republic of

9 Jun 1995

Project underway

Proposed

Proposed


* Countries in italics: Least Developed Countries





Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Mongolia

30 Sep 1993

To be initiated (expected duration of work: 6 to 9 months)

Ongoing

To be initiated

Proposed

Established

Morocco

28 Dec 1995

Apr. 2000

Project under preparation

Mozambique*

25 Aug 1995

October 1999

Project underway

Myanmar *

25 Nov 1994

Ongoing

Namibia

16 May 1995

1998

Ongoing

Nauru

11 Nov 1993

Project underway/ PICCAP

(expected duration of work: 3 years)

To be initiated

(as part of PICCAP)

Nepal *

2 May 1994

Project under preparation

Nicaragua

31 Oct 1995

Project under preparation

Niger *

25 Jul 1995

Project underway (expected duration of work: 2 years)

To be initiated (expected duration of work: 2 years)

To be initiated (expected duration of work: 2 years)

Established

Established

Nigeria

29 Aug 1994

1998

Project underway (expected duration of work: 2 years )

Ongoing

(expected date of completion: 1998)

Established

Established

Niue

28 Feb 1996

August 1999

Ongoing

To be initiated

(as part of PICCAP, expected duration of work: Jan-May 97)

Oman

8 Feb 1995

January 1998

Ongoing

Completed (November 1996) Draft Final Report

Ongoing

(expected date of completion: December 1997)

Established

Pakistan

1 Jun 1994

August 1998

Ongoing

Completed

Ongoing

Panama

23 May 1995

Project underway

Established

Papua New Guinea

16 Mar 1993

Project underway



* Countries in italics: Least Developed Countries




Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Paraguay

24 Feb 1994

To be initiated (expected duration of work: 1 year).

To be initiated

To be initiated

Proposed

Proposed

Peru

7 Jun 1993

October 1998

Ongoing

Completed for 1990 baseline and ongoing for 1994 baseline

Ongoing

Established

Established

Philippines

2 Aug 1994

Ongoing

Ongoing

To be initiated

Established

Established

Qatar

18 Apr 1996

Republic of Korea

14 Dec 1993

December 1997

Ongoing

Ongoing

(expected date of completion: end of 1997)

Ongoing

(expected date of completion: end of 1997)

Proposed

Proposed

Saint Kitts and Nevis

7 Jan 1993

Project under preparation

To be initiated

To be initiated

Proposed

Proposed

Saint Lucia

14 Jun 1993

March 1999

Project underway

Saint Vincent and the Grenadines

35400

Samoa *

29 Nov 1994

Ongoing

Ongoing

Ongoing

(expected date of completion: November 1997)

Established

Proposed

San Marino

28 Oct 1994

Saudi Arabia

28 Dec 1994

1997

Senegal

17 Oct 1994

December 1997

Completed

First inventory completed in July 1994; second inventory is ongoing

Ongoing

Established

Established

Seychelles

22 Sep 1992

First half of 1998

Ongoing

July 1997

Ongoing

Established

Singapore

35578

Sierra Leone*

22 Jun 1995

Project underway





* Countries in italics: Least Developed Countries



Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

Slovenia

1 Dec 1995

Project underway

Proposed

Solomon Islands *

28 Dec 1994

Project underway / PICCAP

(expected duration of work: 3 years )

To be initiated

(as part of PICCAP)

To be initiated







South Africa

29 Aug

1997

Project under preparation

Sri Lanka

34295

1998

Ongoing

Ongoing

To be initiated

Sudan *

19 Nov 1993

October 1999

Ongoing

To be initiated

To be initiated

Suriname

35716

Swaziland

7 Oct 1996

To be initiated (expected duration of work: 2 years)

To be initiated (expected duration of work: 6 months)

To be initiated (expected duration of work: 9 months)

Proposed

Proposed

Syrian Arab Republic

4 Jan 1996

Thailand

28 Dec 1994

Project underway

Ongoing

Ongoing (expected duration of work: 6 months)

Established

Established

Togo *

8 Mar 1995

Project underway

Trinidad and Tobago

24 Jun 1994

Tunisia

15 Jul 1993

August 1999

Ongoing

Ongoing

To be initiated (expected date of completion: March 1998)

Established

Established

Turkmenistan

34854

Ongoing

To be initiated (expected duration of work: 1 year)

To be initiated (expected duration of work: 1 year)

Established

Established

Tuvalu *

26 Oct 1993

Project underway / PICCAP

(expected duration of work: 3 years )

To be initiated (as part of PICCAP, expected duration of work: 1997-8)

To be initiated

Uganda *

8 Sep 1993

Project underway

United Arab Emirates

29 Dec 1995



* Countries in italics: Least Developed Countries



Table 1

(Continuation)

Party

Indicated Date of Submission of National Commu-nication

Status of Preparation of National Communication

Institutional Arrangements

General Status

GHG Inventory

General Description of Steps

Climate Change Committee

Expert Technical Team

United Republic of Tanzania *

17 Apr 1996

Ongoing

Completed ( 1994)

Ongoing

Established

Established

Uruguay

18 Aug 1994

Submission made in Oct 1997

First National Communication finalized

First inventory completed in March 1997; second inventory is ongoing (expected date of completion: April 1998)

Finalized

Established

Established

Uzbekistan

20 Jun 1993

October 1998

Ongoing

Ongoing

(expected date of completion: December 1998)

Ongoing

(expected date of completion: June 1998)

Established

Established

Vanuatu *

25 Mar 1993

Project underway/ PICCAP

(expected duration of work: 3 years)

To be initiated (as part of PICCAP)

To be initiated

Venezuela

28 Dec 1994

Completed (May 1996)

Viet Nam

16 Nov 1994

February 1998

Project under preparation

Completed (March 1996)

Ongoing

(expected date of completion: December of 1997)

Established

Yemen *

21 Feb 1996

August 2000

Project underway

To be initiated

To be initiated

Zambia *

28 May 1993

April 1999

Ongoing

Established

Established

Zimbabwe

3 Nov 1992

December 1997

Ongoing

Ongoing

Ongoing

Established

Established


* Countries in italics: Least Developed Countries

Table 2. Secretariat Participation in Regional Workshops

Region/

Sub-region

Date

Place

Subject/Title

Organizer

Interregional

12-15 November 1996

Beijing, China

Preparation of initial national communications

USCSP

Interregional

18-23 November 1996

Bonn, Germany

Second CC:INFO Web workshop

UNFCCC secretariat

Interregional

25-26 February 1997

Bonn, Germany

Climate change project activities

GEF/UNFCCC secretariat

Interregional

35638

Bonn, Germany

Climate change project activities

GEF/UNFCCC secretariat

Interregional

35723

Bonn, Germany

Climate change project activities

GEF/UNFCCC secretariat

Africa/ Maghreb

3-4 October 1996

Tunis, Tunisia

Preparation of initial national communications

UNDP/GEF

Africa/

East Africa

24-25 November 1996

Nairobi, Kenya

Preparation of initial national communications

UNDP/UNEP/GEF

Africa

27 May - 6 June 1997

Kariba, Zimbabwe

Preparation of vulnerability and adaptation assessment

CC:TRAIN-UNDP/UNITAR/

Center for Environment and Research at the University of Waikato ( New Zealand)

Africa

28 - 30 August 1997

Dakar, Senegal

Preparation of initial national communications

Government of Senegal/

UNDP/UNEP/GEF

Asia/

Central Asia

12-14 November 1996

Tashkent, Uzbekistan

Preparation of initial national communications of non-Annex I countries and overview of implementation of the Convention

UNFCCC secretariat/ National Commission of the Republic of Uzbekistan on the Problems of Climate Change/UNDP/UNEP

Asia and Pacific

4-8 November 1996

Suva, Fiji

Sixth Asia-Pacific seminar on climate change

Government of Japan

Asia and Pacific

6-8 January 1997

Jakarta, Indonesia

Preparation of initial national communications

USCSP

Asia and Pacific

7-10 July 1997

Fujiyoshida, Japan

Seventh Asia-Pacific seminar on climate change

Government of Japan/UNDP/GEF

Asia and Pacific

22-24 September 1997

Bangkok, Thailand

Second expert group meeting on regional co-operation for climate change

Government of Japan/ESCAP

Latin America and Caribbean/ Latin America

30 September -

2 October 1997

Foz do Iguacu, Brazil

Preparation of initial national communications

Government of Brazil/UNDP/GEF

Latin America and Caribbean/ Caribbean

20-21 November 1997

Port of Spain, Trinidad and Tobago

Preparation of initial national communications

UNDP/GEF

Latin America and Caribbean/ Latin America

24 November -

5 December 1997

Lima, Peru

Preparation of climate change vulnerability and assessment

CC:TRAIN -UNDP/

UNITAR/Fundacion Futuro Latinoamericano (FFLA)






Table 3. CC:TRAIN National Workshops

Country

Date

Subject/Title

Organizer

Benin

7-8 April 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Benin

9-11 April 1997

GHG Inventories

CC:TRAIN -UNDP/UNITAR/ENDA-TM

Benin

8-12 December 1997

Preparing a climate change mitigation analysis

CC:TRAIN -UNDP/UNITAR/ENDA-TM

Bolivia

5-7 November 1997

National implementation strategies

CC:TRAIN - UNDP/UNITAR

Ecuador

13-14 May 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Chad

28-29 March 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Chad

1-3 April 1997

GHG Inventories

CC:TRAIN -UNDP/UNITAR/ENDA-TM

Chad

1-5 December 1997

Preparing a climate change mitigation analysis

CC:TRAIN - UNDP/UNITAR/ENDA-TM

Cuba

21-23 January 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Ecuador

13-14 May 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Peru

21-22 April 1997

Climate change and the UNFCCC

CC:TRAIN - UNDP/UNITAR

Paraguay

17-18 April 1997

Climate change and the UNFCCC

CC:TRAIN- UNDP/UNITAR

Senegal

16-17 January 1997

Climate change and the UNFCCC

CC:TRAIN- UNDP/UNITAR

Zimbabwe

10-11 June 1997

Preparation of initial national communication

CC:TRAIN - UNDP/UNITAR

Zimbabwe

22-26 September 1997

Preparing a climate change mitigation analysis

CC:TRAIN - UNDP/UNITAR




Table 4. CC:TRAIN Training Material

Subject

Stage of Implementation

Training package on climate change and the UNFCCC

Updated - Version 2

Training package on preparing a vulnerability and adaptation assessment

Available

Training package on preparing a greenhouse gas inventory

Available

Training package on preparing a mitigation analysis

Under preparation

Manual and training package on preparing a national implementation strategy

Under preparation

Training package on preparing national communications

Under preparation






Table 5. CC:FORUM

Title

Date

Place

Fifth CC:FORUM Meeting

19 December 1996

Geneva, Switzerland

Sixth CC:FORUM Meeting

26 February 1997

Bonn, Germany

Seventh CC:FORUM Meeting

35641

Bonn, Germany

Eighth CC:FORUM Meeting

35723

Bonn, Germany




Table 6. CC:INFO National Web Site Initiative

Country

Stage of Implementation

Country

Stage of Implementation

Azerbaijan

Included in enabling activity project

Mozambique

Included in enabling activity project

Bahrain

Included in enabling activity project

Nicaragua

Included in enabling activity project

Cameroon

Included in enabling activity project

Niue

Included in enabling activity project

Central African Republic

Included in enabling activity project

Panama

Included in enabling activity project

Egypt

On line *

Philippines

Included in enabling activity project

El Salvador

Included in enabling activity project

Senegal

On line *

The Gambia

Included in enabling activity project

Seychelles

On line *

Guatemala

Included in enabling activity project

Sri Lanka

Included in enabling activity project

Guyana

Included in enabling activity project

Thailand

On line *

Iran

Included in enabling activity project

Togo

Included in enabling activity project

Jordan

On line *

Ukraine

Included in enabling activity project

Kenya

Included in enabling activity project

United Republic of Tanzania

Included in enabling activity project

Lithuania

Included in enabling activity project

Venezuela

On line *

Malaysia

On line *

Zambia

On line *

Mauritania

Included in enabling activity project

Zimbabwe

On line *

* Link available under the UNFCCC Web Site - www.unfccc.de




LIST OF ACRONYMS:

CC:INFO - Climate Change Information Exchange Programme

CC:FORUM - Climate Change Forum

CC:TRAIN - Climate Change Training Programme

ENDA - TM - Environnement et Développement du Tiers-Monde

ESCAP - Economic and Social Commission for Asia and the Pacific

FFLA - Fundación Futuro Latinoamericano

GEF - Global Environment Facility

PICCAP - Pacific Islands Climate Change Assistance Programme

UNDP - United Nations Development Programme

UNEP - United Nations Environment Programme

UNFCCC - United Nations Framework Convention on Climate Change

UNITAR - United Nations Institute for Training and Research

USCSP - United States Country Studies Program



- - - - -




1. Reports to the fifth, sixth and seventh sessions of the SBI (see documents FCCC/SBI/1997/INF.1, FCCC/SBI/1997/INF. 3, FCCC/SBI/1997/9 and FCCC/SBI/1997/13).