Paragraphs Page
I. INTRODUCTION 1 - 6 3
II. PERFORMANCE REPORT, 1998-1999: TABLES 4
Table 1. Executive Direction and Management programme 4
Table 2 (a). Science and Technology programme
Direction and Management subprogramme 5
Table 2 (b). Science and Technology programme
Methodology and Science subprogramme 6
Table 2 (c). Science and Technology programme
Technology subprogramme 8
GE.99-
Page
Table 2 (d). Science and Technology programme
Cooperation Implementation subprogramme 9
Table 3 (a). Implementation programme
Direction and Management subprogramme 10
Table 3 (b). Implementation programme
Implementation Process subprogramme 11
Table 3 (c). Implementation programme
Annex I Implementation subprogramme 12
Table 3 (d). Implementation programme
Non-Annex I Implementation subprogramme 13
Table 4 (a). Conference and Information Support programme
Direction and Management subprogramme 14
Table 4 (b). Conference and Information Support programme
Conference Support subprogramme 15
Table 4 (c). Conference and Information Support programme
Information Support subprogramme 16
Table 5 (a). Resources, Planning and Coordination programme
Direction and Management subprogramme 17
Table 5 (b). Resources, Planning and Coordination programme
Financial Management and Administration
subprogramme 18
1. Upon considering the report of the Executive Secretary on administrative and financial matters at its tenth session, several Parties expressed interest in seeing a more detailed performance report, preferably at the subprogramme level. This report is a response to that request. It covers the period 1 January 1998 to 30 June 1999. Summaries of this information are included in the relevant section of the main document (FCCC/SBI/1999/10).
2. The report contains a common table for each subprogramme in the secretariat. Each table is divided into two main parts:
(a) Financial and personnel resources; and
(b) Main results and outputs.
3. The first part provides a comparison between the approved core budget for the biennium 1998-1999 and the actual expenditures as at 30 June 1999, broken down by objects of expenditure. All budget and expenditure figures are in United States dollars. In addition, posts that have been approved for financing from the core budget are indicated.
4. The second portion provides a brief summary of the main outputs for the biennium. It must be emphasized that these outputs do not represent a comprehensive list of all tasks undertaken. For simplification purposes, outputs have been standardized as documents produced and events organized by each subprogramme, as these are key indicators of secretariat activity in support of the intergovernmental process. The titles of the documents are summarized for brevity.
5. In addition to the secretariat's main output, which has been to organize and support six weeks of intergovernmental meetings, other significant achievements are also indicated. Some of these achievements, especially in the areas of information products and non-Annex I support and with regard to workshops, were possible due to complementary expenditures from supplementary funds.
6. If Parties find this presentation useful, it can be refined for reporting to future sessions of the Conference of the Parties. A list of abbreviations is contained in the work programme document, FCCC/CP/1999/INF.1.
|
|||
Programme: Executive Direction and Management |
Subprogramme: none |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Travel Total |
1 161 100 103 000 1 264 100 |
705 920 112 736 818 656 |
Executive Secretary (ASG), P-4 Special Assistant, four GS (Personal Assistant, Secretary, Registry Assistant, Registry Clerk) |
|
|||
Documents prepared: N/A |
Events organized: Working lunch between Ministers and other Heads of delegation and chief executive officers from the private sector during COP 4 |
Other significant achievements: 1. Developed procedures for the use of supplementary funds 2. Developed and revised a new UNFCCC personnel policy 3. Promoted cooperation on climate change activities with heads of partner organizations 4. Started work with Conference and Information Support Programme to improve the system for recording, tracking and following up correspondence |
Direction and Management subprogramme
|
|||
Programme: Science and Technology |
Subprogramme: Direction and Management |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Contribution to IPCC Total |
1 097 900 0 60 000 750 000 1 907 900 |
529 401 40 080 68 527 350 000 988 008 |
D-2 Coordinator, P-2 Programme Officer (vacant), two GS (Secretary, Administrative Assistant) |
|
Documents prepared: 1. FCCC/SBSTA/1998/1; Provisional agenda and annotations (SBSTA - eighth session) 2. FCCC/SBSTA/1998/6; Report of the SBSTA (SBSTA - eighth session) 3. FCCC/SBSTA/1998/9; Report of the SBSTA (SBSTA - ninth session) 4. FCCC/SBSTA/1999/1; Provisional agenda and annotations (SBSTA - tenth session) |
Events organized: N/A |
Other significant achievements: 1. Provided support to SBSTA Chairman 2. Coordinated the UNFCCC fellowship programme |
Methodology and Science subprogramme
|
|
Programme: Science and Technology |
Subprogramme: Methodology and Science |
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel of participants/expert group Travel Miscellaneous Total |
1 265 200 290 000 120 000 73 000 0 1 748 700 |
356 832 165 578 52 151 53 060 8 959 636 580 |
D-1 Manager/Deputy Coordinator, P-4 Programme Officer, three P-3 Programme Officers (two vacant, one filled effective 2 August 1999), GS Secretary |
|
Documents prepared: 1. FCCC/SBSTA/1998/2; Cooperation with relevant international organizations (SBSTA - eighth session) 2. FCCC/SBSTA/1998/3; Issues related to guidelines for the preparation of Annex I communications (SBSTA - eighth session) 3. FCCC/SBSTA/1998/4; Programme of work on methodologies, progress report (SBSTA - eighth session) 4. FCCC/SBSTA/1998/INF.1; Issues related to land-use change and forestry (SBSTA - eighth session) 5. FCCC/SBSTA/1998/7 and 8; Methodological issues identified: greenhouse gas (GHG) inventories (SBSTA - ninth session) 6. FCCC/CP/1998/7; Report on the development of observational networks of the climate system (COP 4) 7. FCCC/CP/1998/INF.4; Report on the initial SBSTA workshop on land-use, land-use change and forestry (LULUCF) (COP 4) 8. FCCC/SB/1999/1; Report on amendments to the revised guidelines, and addendum (SBSTA and SBI - tenth sessions) 9. FCCC/SB/1999/2; Work programme on methodological issues (Articles 5, 7 and 8 of the Protocol) (SBSTA and SBI - tenth sessions) 10. FCCC/SBSTA/1999/3; Review process related to GHG inventories (SBSTA - tenth session) 11. FCCC/SBSTA/1999/4; Information on impacts, adaptation and mitigation assessment methods (SBSTA - tenth session) 12. FCCC/SBSTA/1999/5; List of policy and procedural issues (Article 3.3 and 3.4 of the Protocol) (SBSTA - tenth session) 13. FCCC/SBSTA/1999/INF.1; Report on the workshop on methodological issues, and addendum (SBSTA - tenth session) 14. FCCC/SBSTA/1999/INF.2; Comparison of GHG inventories between national and IPCC methodologies (SBSTA - tenth session) 15. FCCC/SBSTA/1999/INF.3; Effects of the recalculation of the GHG inventories (SBSTA - tenth session) 16. FCCC/SBSTA/1999/INF.4; Information on emissions from fuel used in international transportation (SBSTA - tenth session) 17. FCCC/SBSTA/1999/INF.5; Report on the second SBSTA workshop on LULUCF (SBSTA - tenth session) |
Three informal documents on international bunker fuels, methods to estimate emission inventories of HFCs, PFCs and SF6 and a compendium of decision tools to evaluate adaptation strategies to climate change. These were presented at the tenth session of the SBSTA. |
Events organized: 1. First SBSTA workshop on LULUCF; 23-25 September 1998, Rome; 98 participants 2. Workshop on methodological issues related to GHG inventories, 9-11 December 1998, Bonn; 85 participants 3. Second SBSTA workshop on LULUCF; 26-28 April 1998, Indianapolis; 116 participants |
Other significant achievements: 1. Supported development of the new revised UNFCCC reporting guidelines on annual inventories for adoption by COP 5 2. Helped to clarify issues related to Article 3.3 and 3.4 of the Kyoto Protocol and facilitated an agreement on the timetable for decision-making on these articles (decision 9/CP.4) 3. Compiled methods related to impact assessments and adaptation technologies |
Technology subprogramme
|
|||
Programme: Science and Technology |
Subprogramme: Technology |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Expert groups Travel Total |
689 000 70 000 60 000 85 000 904 500 |
130 807 25 407 6 056 32 241 194 511 |
P-5 Manager, P-4 Programme Officer (vacant), P-3 Programme Officer, GS Secretary |
|
Documents prepared: 1. FCCC/SBSTA/1998/5; Development and transfer of technologies (SBSTA - eighth session) 2. FCCC/SBSTA/1998/INF.2; Options for technological information centres and networks (SBSTA - eighth session) 3. FCCC/SBSTA/1998/INF.5; Technology and technology information needs (SBSTA - eighth session) 4. FCCC/TP/1998/1; Barriers and opportunities related to the transfer of technology (COP 4) 5. FCCC/CP/1998/6; Progress report on transfer of technology: draft work programme (COP 4) 6. FCCC/SBSTA/1999/2; Development and transfer of technologies (SBSTA - tenth session) 7. FCCC/TP/1999/1; Technical paper on coastal adaptation technologies (SBSTA - tenth session) |
Events organized: 1. UNFCCC technology round table; COP 4 event; 162 participants 2. UNFCCC expert meeting on coastal adaptation technologies; 22 -23 March 1999, Bonn; 12 participants |
Other significant achievements: Completed and presented to Parties, in cooperation with IVAM Environmental Research, a survey of experiences, needs and opportunities among non-Annex II countries (covering 61 countries from all regions) |
Cooperation Implementation subprogramme
|
|||
Programme: Science and Technology |
Subprogramme: Cooperative Implementation |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel of participants/expert groups Travel Total |
816 600 60 000 36 000 47 000 959 600 |
446 605 97 339 28 175 42 783 614 902 |
D-1 Manager (vacant), P-5 Manager, P-4 Programme Officer, P-3 Programme Officer, GS Secretary (vacant) |
|
Documents prepared: 1. FCCC/SBSTA/1998/INF.3; Update on AIJ (SBSTA - eighth session) 2. FCCC/SB/1998/2; Mechanisms for issues related to cooperative implementation (SBSTA and SBI - ninth sessions) 3. FCCC/CP/1998/2; Second synthesis report on AIJ (COP 4) 4. FCCC/SB/1999/INF.1; Review of progress under the pilot phase (decision 5/CP.1) (SBSTA and SBI - tenth sessions) 5. FCCC/SBSTA/1998/INF.3; Update on AIJ (SBSTA - tenth session) 6. FCCC/SB/1999/4; Plan for facilitating capacity-building under decision 7/CP.4 (SBSTA and SBI - tenth sessions) 7. FCCC/SB/1999/INF.2; Synthesis of proposals on principles, modalities, rules and guidelines, and addendum (SBSTA and SBI - tenth sessions) |
Events organized: 1. Two technical workshops on methodological issues related to project-based mechanisms; 14-18 September 1998, Abidjan, Côte d'Ivoire; 50 participants 2. Roundtable on the mechanisms; COP 4 side event 3. Technical workshop on mechanisms under the Kyoto Protocol; 9-15 April 1999, Bonn; 140 participants 4. CC: FORUM on mechanisms; side event at the tenth sessions of the SBSTA and the SBI |
Other significant achievements: 1. Convened two inter-organizational meetings in conjunction with official UNFCCC sessions (SB 8 - June 1998 and COP 4 - November 1998) 2. Established an electronic list serve to share information on workshops (information being posted on website) 3. Prepared technical papers and compiled literature as inputs to workshops and CC:FORUM 4. Participated in and contributed to capacity-building workshops and technical meetings in various regions |
Direction and Management subprogramme
|
|||
Programme: Implementation |
Subprogramme: Direction and Management |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Training Total |
862 800 0 91 000 0 953 800 |
775 147 107 288 60 176 12 100 954 711 |
D-2 Coordinator, P-2 Programme Officer, GS Programme Assistant, GS Secretary (All posts occupied) |
RESULTS AND OUTPUTS |
Documents prepared: 1. FCCC/SBI/1998/1; Provisional agenda and annotations (SBI - eighth session) 2. FCCC/SBI/1998/2; Second review of the adequacy of commitments in Article 4, sub-paragraphs 2(a) and (b) (SBI - eighth session) 3. FCCC/SBI/1998/6; Report of the SBI (SBI - eighth session) 4. FCCC/SBI/1998/7; Report of the SBI (SBI - ninth session) 5. FCCC/SBI/1999/1; Provisional agenda and annotations (SBI - tenth session) 6. FCCC/SBI/1999/8; Report of the SBI (SBI - tenth session) |
Events organized: N/A |
Other significant achievements: 1. Provided support to SBI Chairman 2. Intensified cooperation with the Global Environment Facility (GEF) |
Implementation Process subprogramme
|
|||
Programme: Implementation |
Subprogramme: Implementation Process |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Expert Groups Travel Total |
1 097 600 140 000 0 43 000 1 280 600 |
462 538 114 257 21 893 35 372 634 060 |
D-1 Manager/Deputy Coordinator, three P-3 Review Programme Officers, GS Secretary (All posts occupied) |
|
|||
Documents prepared: 1. FCCC/AG13/1998/1; Provisional agenda and annotations of the Ad Hoc Group on Article 13 (AG13 - sixth session) 2. FCCC/AG13/1998/2; Report of the Ad Hoc Group on Article 13 (AG13 - sixth session) 3. FCCC/SBSTA/1998/3; Issues related to guidelines for the preparation of Annex I national communications (SBSTA - eighth session) 4. FCCC/CP/1998/5; Approach to comparison of data on GHG emissions (COP 4) 5. FCCC/CP/1998/11; Summary of the second compilation and synthesis of second national communications, and two addenda (COP 4) 6. FCCC/CP/1998/INF.9; Summary compilation of Annex I annual GHG emissions inventory data (COP 4) 7. FCCC/SB/1999/1/Add.2; Addendum to the report on amendments to the revised guidelines (SBSTA and SBI - tenth sessions) 8. FCCC/SBI/1999/5; Report on Annex I Parties' national GHG emissions inventory (1990 to 1996), and addendum (SBI - tenth session) 9. FCCC/TP/1999/2; Technical paper. Report on data comparisons |
One informal document on procedures and mechanisms relating to compliance under the Protocol. This was presented prior to the tenth session of the SBI. |
Events organized: 1. Workshop on generic issues related to guidelines for the preparation of national communications by Parties included in Annex I to the Convention; 17-19 March 1999, Bonn; 70 participants 2. Consultation on procedures and mechanisms relating to compliance under the Kyoto Protocol; tenth sessions of the SBSTA and the SBI |
Other significant achievements: 1. Compiled comprehensive GHG inventories database covering all Parties that have submitted national communications, and a web interface on this database is in development 2. Supported conclusion of AG 13 work and adoption of decision on multilateral consultative committee (with one issue pending) 3. Initiated work on the first compilation and synthesis of initial national communications from non-Annex I Parties |
Annex I Implementation subprogramme
|
|||
Programme: Implementation |
Subprogramme: Annex I Implementation |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Expert groups Travel Total |
1 437 400 60 000 120 000 135 500 1 752 900 |
793 127 33 799 150 232 91 614 1 068 772 |
P-5 Manager, two P-4 Review Officers, two P-3 Review Officers, GS Secretary (All posts occupied) |
|
Documents prepared: 1. FCCC/SBI/1998/INF.1; In-depth reviews of first and second national communications and scheduling for future communications (SBI - eighth session) 2. FCCC/SBI/1998/INF.2; Nomination of experts for participation in in-depth reviews (SBI - eighth session) 3. FCCC/CP/1998/4; Interim assessment of in-depth reviews (COP 4) 4. FCCC/SBI/1999/6; Future review process including that under Articles 7 and 8 of the Kyoto Protocol (SBI - tenth session) 5. FCCC/SBI/1999/INF.2; Progress report on the in-depth reviews of Annex I Parties' second national communications (SBI - tenth session) |
Events organized: Coordinated 28 in-depth review visits including participation by government-nominated experts |
Other significant achievements: 1. Coordinated preparation and publication of 14 reports on in-depth review of Annex I national communications 2. Contributed to the drafting of the compilation and synthesis of national communications 3. Contributed to the GEF inter-agency task force on incremental costs |
Non-Annex I Implementation subprogramme
|
|
Programme: Implementation |
Subprogramme: Non-Annex I Implementation |
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel of participants/expert groups Travel Workshops logistics Total |
691 300 60 000 240 000 89 000 0 1 080 300 |
380 106 70 598 19 249 51 037 10 000 530 990 |
P-5 Manager, P-4 Programme Officer, GS Secretary (vacant) |
|
Documents prepared: 1. FCCC/SBI/1998/INF.3; Secretariat activities to facilitate financial and technical support (SBI - eighth session) 2. FCCC/CP/1998/INF.2; Secretariat activities to facilitate financial and technical support (SBI - ninth session) 3. FCCC/CP/1998/12/Add.1; Addendum to report of the GEF (COP 4) 4. FCCC/SBI/1999/INF.1; Provision of financial and technical support. Information on relevant action by the GEF (SBI - tenth session) 5. FCCC/SBI/1999/INF.4; List of projects submitted by non-Annex I Parties (SBI - tenth session) |
Events organized: 1. Workshop on non-Annex I communications and further capacity needs; 3 April 1998, New Delhi; 10 participants 2. Workshop on emission factors and activity data; 15-18 September 1998, Havana; 76 participants 3. Training on use of CC:WEB CD-ROM for non-Annex I Parties at each of the sessions; 25 participants |
Other significant achievements: 1. Disseminated CC:TRAIN package on preparing national communications 2. Compiled a database on enabling activities for preparing initial national communications |
Direction and Management subprogramme
|
|||
Programme: Conference and Information Support |
Subprogramme: Direction and Management |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Total |
1 149 400 0 60 000 1 209 400 |
566 257 19 774 32 024 618 055 |
D-1 Coordinator, P-2 Programme Officer, two GS (Secretary, Administrative Assistant (vacant)) |
|
|||
Documents prepared: N/A |
|||
Events organized: N/A |
|||
Other significant achievements: Facilitated cooperation on climate change activities with partner organizations |
Conference Support subprogramme
|
|||
Programme: Conference and Information Support |
Subprogramme: Conference Support |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Other contractual services Total |
881 600 65 000 29 000 0 975 600 |
449 942 35 580 97 721 12 096 595 339 |
P-5 Manager, P-3 External Relations Officer, three GS (Secretary, External Relations Assistant (vacant), Meetings Services Assistant) |
|
Documents prepared: FCCC/SBI/1998/3; Arrangements for intergovernmental meetings (SBI - ninth session) |
Events organized: see below |
Other significant achievements: 1. Organized six weeks of meetings of the COP and its subsidiary bodies (logistics, facilities, accreditation, registration and special events) 2. Serviced four workshops 3. Edited all documents for all intergovernmental sessions |
Information Support subprogramme
|
|||
Programme: Conference and Information Support |
Subprogramme: Information Support |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Supplies/equipment Contributions Total |
829 200 80 000 37 000 269 500 0 1 215 700 |
514 993 51 796 16 660 104 642 20 000 708 091 |
P-4 Information Technologies Officer (vacant), P-3 Network Officer (vacant), P-2 Software Officer, P-2 Support Officer, GS Secretary |
|
|||
Documents prepared: N/A |
|||
Events organized: N/A |
|||
Other significant achievements: 1. Facilitated video conferencing during COP 4 2. Provided networked computer environment at all sessions and workshops 3. Developed and serviced the web site, plus special COP and subsidiary bodies module (1,110,000 hits per month) 4. Adapted a new logo 5. Developed various databases (roster of experts, national focal points, GHG inventory) 6. Developed and analysed questionnaire addressed to all participants on services provided during sessions 7. Developed a new web site |
Direction and Management subprogramme
|
|||
Programme: Resources, Planning and Coordination |
Subprogramme: Direction and Management |
||
|
|||
Object of expenditure |
Biennial budget |
Expenditure |
Core posts |
Posts and other staff costs Consultants Travel Total |
1 337 000 80 000 91 000 1 508 000 |
889 159 59 998 55 945 1 005 102 |
D-1 Coordinator, P-5 Senior Legal Officer, P-3 Programme Officer, P-2 Programme Officer, two GS Secretaries (all posts occupied) |
|
Documents prepared: 1. FCCC/SBI/1998/3; Arrangements for intergovernmental meetings (SBI - eighth session) 2. FCCC/CP/1998/1; Provisional agenda and annotations for COP 4, and addendum (COP 4) 3. FCCC/CP/1998/13; Review of information and possible decisions under Art. 4.2(f) of the Convention (COP 4) 4. FCCC/CP/1998/16; Report of the COP (COP 4) 5. FCCC/SBI/1999/2; Arrangements for intergovernmental meetings (SBI - tenth session) 6. FCCC/SBI/1999/7; Institutional linkage of the Convention secretariat to the United Nations (SBI - tenth session) 7. FCCC/SBI/1999/4; Proposed programme budget, 2000-2001, and addendum (SBI - tenth session) 8. FCCC/CP/1999/2; Proposal from the Republic of Kazakhstan (COP 5) |
Events organized: 1. Informal consultations by the President; 9 -10 October 1998, Buenos Aires; 30 Parties 2. Informal consultations by the President; 24 April 1999, New York; 34 Parties |
Other significant achievements: 1. Facilitated arrangements for the signing of Kyoto Protocol 2. Processed amendments to the list of Parties included in Annex I to the Convention from point of adoption at COP 3 to entry into force in August 1999 3. Coordinated the secretariat's Project Funding Group 4. Managed internal planning for intergovernmental meetings |
Financial Management and Administration subprogramme
|
|
Programme: Resources, Planning and Coordination |
Subprogramme: Financial Management and Administration |
|
|||
Object of expenditure |
Biennial budget |
Expenditure(1) |
Core posts |
- General operating expenses (includes communications charges, rental and maintenance of equipment and hospitality) - Furniture and supplies - Contractual services (external printing, training) - Common services Total |
560 700 255 000
185 000 900 000 1 900 700 |
264 262 26 860
72 862 552 365 1 150 349 |
none |
RESULTS AND OUTPUTS |
Documents prepared: 1. FCCC/SBI/1998/4; Administrative and financial matters (SBI - eighth session) 2. FCCC/SBI/1998/INF.4; Status of contributions (SBI - eighth session) 3. FCCC/CP/1998/8; Administrative and financial matters, and addendum (COP 4) 4. FCCC/CP/1998/9; Audited financial statements, 1996-1997 (COP 4) 5. FCCC/CP/1998/10; Audit reports (COP 4) 6. FCCC/SBI/1999/3; Administrative and financial matters (SBI - tenth session) 7. FCCC/SBI/1999/INF.5; Status of contributions (SBI - tenth session) |
Events organized: N/A |
Other significant achievements: 1. Agreement with the United Nations Office at Geneva on transfer of administrative responsibilities 2. Updating and classification of all posts 3. Support to current major recruitment exercise |
1. This subprogramme operates with overhead funds. The amounts shown refer to the secretariat-wide costs.