20 February 1997



ENGLISH ONLY



UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE

SUBSIDIARY BODY FOR IMPLEMENTATION

Fifth Session

Bonn, 25-28 February 1997

Item 4 (b) of the provisional agenda

FINANCIAL AND TECHNICAL COOPERATION

 

INFORMATION ON RELEVANT ACTION BY THE

COUNCIL OF THE GLOBAL ENVIRONMENT FACILITY

 

Note by the secretariat


The Conference of the Parties, at its second session, by its decision 10/CP.2 requested the Convention secretariat to make available to the Subsidiary Body for Implementation (SBI), at each of its sessions, details of the financial support made available to Parties not included in Annex I to the Convention from the interim operating entity of the financial mechanism for the preparation of their initial communications, including projects in this regard proposed by each Party, the funding decisions and the date and amount of funds made available to the Party (FCCC/CP/1996/15/Add.1).

The attached table* contains information provided by the Secretariat of the

Global Environment Facility (GEF) in response to that decision.

Funds are considered available to the Parties from the date when the project documents are signed by the Parties and the implementing agencies. Such dates are listed in the column entitled "Date of Project Document Signature" in this table. In order to make it possible for Parties to start work without delay on enabling activity projects approved under expedited procedures, it was decided in July 1996 that 15 percent of the total funds for such projects may be made available to Parties as soon as the projects are approved by the Chairman and Chief Executive Officer of the GEF, which would be before the date on which the project documents are signed.

In accordance with the procedure for miscellaneous documents, the table is reproduced in the language in which it was received and without formal editing.

FCCC/SBI/1997/MISC.1

GE.97-

___________________

* In order to make these submissions available on electronic systems, including the World Wide Web, these contributions have been electronically scanned and/or retyped. The secretariat has made every effort to ensure the correct reproduction of the texts as submitted.

GEF PROJECTS RELATED TO NATIONAL COMMUNICATIONS

BY NON-ANNEX I PARTIES

Country

Implementing Agency

Project Title

Entry into GEF Work Program

Date of Project Document Signature by Agency

Amount of GEF Allocation (in US$ millions)

Comments

I. Pilot Phase Projects



Algeria, Morocco, Tunisia & Libya









Building Capacity in the Maghreb to respond to the challenges and opportunities created by the UNFCCC



05/93



12/07/94



2.50



First Technical Advisory Committee meeting held in mid-May 1996. Regional workshop held on Oct.3-4, 1996. First Tripartie Review scheduled for April/May 1997.

Bangladesh, China, DPRK, India, Indonesia, Mongolia, Myanmar, Pakistan, Philippines, Thailand & Vietnam

Asia Least-cost GHG Abatement Strategy (ALGAS)

12/91

08/18/94

9.50

Project to be completed by June 1997. Three major regional workshops and national workshops held for individual countries. Mitigation options identification workshop scheduled for Feb. 1997



China, People's Rep.



UNDP



Issues and Options in GHG emissions control



05/91



03/06/92



2.00



Project completed in April 1995.



Costa Rica, Gambia, Mexico, Morocco, Poland, Senegal, Tanzania, Uganda, Venezuela



UNEP



Country Case Studies on Sources and Sinks of Greenhouse Gases



11/91



09/28/92



4.50







----

Ghana, Kenya, Mali and Zimbabwe

UNDP

Building capacity in Sub-Saharan Africa to respond to the UNFCCC

12/92

08/16/95

2.00

Project under execution. Second Project Steering Committee meeting scheduled for early 1997.

India

UNDP

Cost-Effective Options for Limiting GHG emissions

05/93

---

1.50

Project document under preparation by nationally designated organization



Country



Implementing Agency



Project Title



Date of Country Endorsement



Date of GEF Council Approval



Date of Project Document Signature



GEF Allocation

(in US$ millions)



Comments

II. Pre-expedited Procedure Projects

Antigua & Barbuda, Bahamas, Barbados, Belize, Dominica, Grenada, Jamaica,

St. Kitts and Nevis,

St. Lucia, Trinidad and Tobago

World Bank

Regional (CARICOM) Planning for Adaptation to Climate Change

N/A Multi-Country Project

---

---

---

---

Antigua & Barbuda, Cameroon, Estonia, Pakistan

UNEP

Country Studies on Climate Change Impacts and Adaptation Assessment

N/A Multi-Country Project

02/96

05/01/96

2.00

---

Argentina

UNDP

Country Study on Climate Change







12/07/94

01/17/96









02/16/96

1.00

Project initiation workshop held on 07/03/96-07/04/96.



Argentina, Ecuador, Estonia, Hungary, Indonesia, Mauritius, Senegal, Vietnam



UNEP



Economics of GHG Limitation-Methodological Framework for Climate Change Mitigation and Adaptation Assessment



N/A Multi-Country Project



01/18/96



03/18/96



3.00



---

Armenia

UNDP

Country Study

on Climate Change

03/31/95

12/15/95

05/07/96

0.35

Project work plan prepared in June 1996 and first workshop held in Sept.1996





Benin, Bolivia, Chad,

Cook Islands, Cuba, Ecuador, Fiji, Kiribati, Marshall Islands, Nauru, Paraguay, Peru, Senegal, Solomon Islands, Tuvalu, Vanuatu & W. Samoa





UNDP





Climate Change Capacity Building: CC: TRAIN-Phase II





N/A Multi-country project





03/26/96





03/27/96





2.70





Three Regional Training Workshops to be held in the second and third quarter of 1997.

Operating in parallel with PICCAP for Pacific countries. Operating in close collaboration with activities undertaken by UNDP Sub-Saharan Africa capacity building

Bhutan







UNDP

Enabling Activity

01/30/96

07/26/96

08/15/96

0.30

Project initiation whorkshop anticipated in Feb. 1997

Botswana















Brazil

UNDP















UNDP

Enabling Botswana to fulfill its commitments to the UNFCCC







Enabling Braz

il to fulfill its commitments to the UNFCCC

11/18/94















08/31/95

08/14/96















07/14/96

09/05/96















08/01/96

0.35















1.50

Project work plan under preparation









Subcontracts for project activities and project workplan under preparation

Cook Islands, Fiji, Kiribati, Marshall Islands, Fed. States of Micronesia, Nauru, Solomon Islands, Tuvalu, Vanuatu & W. Samoa

Costa Rica

UNDP























UNDP

Pacific Island Climate Change Assistance Project (PICCAP)















Building National Technical Capacity to Develop Options for GHG emissions reductions and carbon sinks enhancement

N/A Multi-Country Project



















12/08/94

---























06/07/96

---























08/07/96

2.44























0.47

Project document finalized and pending Council approval.













Meeting held in December 1996-Jan. 1997 on: energy, land use, agriculture waste management and industrial processes. Baseline scenarios



Egypt



UNDP



Building Capacity for GHG Inventory and Action Plans in Egypt



11/16/94



04/22/96



06/12/96



0.40



Project initiation workshop held on 12/03/96



Jordan







UNDP



Capacity Building to enable response to the UNFCCC



11/12/94



10/17/96



04/08/96



0.24



Project initiation workshop held on 09/29/96.

Lao People's Democratic Republic





National GHG Inventory Project

07/19/95

07/29/96

10/30/96

0.31

Subcontracts for project activities under preparation.











Lebanon



UNDP



Building capacity for GHGInventory and Action Plans in response to the UNFCCC.



03/11/95



10/02/95



12/11/96



0.29



Project work plan under preparation

Malaysia

UNDP

National GHG Inventory and Response to the UNFCCC

04/01/95

09/13/96

10/30/96

0.47

Project work plan under preparation







Maldives





















UNDP







National GHG Inventory and Adaptation Assessment to Climate Change









10/29/94







10/04/96







---







1.00







Project document signature anticipated Jan. 1997.









Mexico

























Papua New Guinea











UNDP

























UNDP













Development of GHG Emission Coefficients from Live Systems in Central Mexico & Development of a related information management system





Enabling Activity



















12/02/94

























01/17/96



06/07/96

























12/30/96



10/29/96

























---



0.31

























0.35



Subcontracts for project activities under preparation

















Project document signature anticipated Jan. 1997













Sudan



















Tunisia





























UNDP



















UNDP



















Capacity Building to enable the Sudan's response and communication to the UNFCCC.





National Strategy and Action Plans for emission reduction and communications under the UNFCCC.













03/20/95



















02/03/95



















10/03/96



















08/14/96



















---



















09/06/96



















0.29



















0.57



















Project document signature anticipated in Jan. 1997











Subcontracts for technical activities under preparation





Uruguay











UNDP

Institutional strengthening and enabling activities to comply with the UNFCCC

11/25/94

11/13/95

12/18/96

0.70

National workshop on GHG inventory held on 05/28/96. National Workshops on mitigation held on: energy 09/18/96 agriculture- 11/27/96



Uzbekistan

UNDP

Country Study on Climate Change





08/07/95

01/02/97

---

0.33

Project document signature expected by end Jan. 1997.

Zaire

UNDP

Enabling Zaire to fulfill its commitments to the UNFCCC

08/17/95

---

---

0.35

Project document under finalization.







Country

Implementing Agency

Project Title

Date of Country Endorsement

Date of GEF Council Approval

Date of Project Document Signature

GEF Allocation(in US$ millions)

Comments

III. Expedited Procedures Projects

Albania

UNDP

Enabling Albania to prepare its first national communication

05/15/96

07/30/96

---

0.28

Draft project document expected by Jan. 1997.

Cambodia

UNDP

Enabling Activity

11/12/96

---

---

---

In final review.

Cameroon

UNEP

Enabling Activity

Dec. 96

---

---

---

In final review

Cape Verde

UNDP

Enabling Activity

05/26/96

---

---

---

In final review



Chile



UNDP



Enabling Chile to fulfil its commitments to the UNFCCC



05/30/96



08/30/96



---



0.35



Project document signature anticiapted in Jan. 1997.

Democratic Peoples' Republic of Korea

UNDP

Enabling Activity

01/17/94

---

---

---

In final review.

El Salvador

UNDP

Enabling Activity

12/02/96

---

---

---

In final review.

Eritrea

UNDP

Enabling Eritrea to prepare its first national communication

07/05/96

09/04/96

---

0.30

Project document being finalized.

Guatemala

UNDP

Enabling Activity

11/18/96

---

---

---

In final review



Gambia



UNDP



Enabling Activity



11/12/96



---



---



---



In final review.

Georgia

UNDP

Enabling Georgia to fulfil its commitments to the UNFCCC

05/24/96

09/11/96

---

0.33

Project document signature anticipated in Jan. 1997.







Country



Implementing Agency



Project Title



Date of Country Endorsement



Date of GEF Council Approval



Date of Project Document Signature



GEF Allocation

(in US$ millions)



Comments

III. Expedited Procedures Projects



Honduras



UNDP



Enabling Activity



08/16/96



---



---



---



In final review

Lesotho

UNEP

Enabling Activity

06/21/96

09/04/96

11/14/96

0.35

---

Malawi

UNDP

Enabling Activity

08/06/96

---

---

---

In final review.

Nigeria

UNDP

Enabling Activity

08/07/96

---

---

---

In final review.

Seychelles

UNDP

Enabling Seychelles to prepare its first national communication

11/16/95

07/30/96

---

0.25

Project under early stage of implemen-tation.

Sierra Leone

UNDP

Enabling Sierra Leone to prepare its first national communication

07/09/96

09/11/96

---

0.31

Project document being finalized.





Swaziland





UNDP





22/11/96





---





---





---





---





In final review.

Uganda

UNDP

Enabling Uganda to prepare its first national communication

08/22/95

07/30/96

---

0.08

Project document signature anticipated in Jan. 1997.



Zambia



UNEP



Enabling Activity



11/14/96



---



---



---



In final review.

Zimbabwe

UNEP

Enabling Activity

11/04/96

---

---

---

In final review.