Distr.
GENERAL
FCCC/SBI/1997/10
20 June 1997
Original: ENGLISH
SUBSIDIARY BODY FOR IMPLEMENTATION
Sixth session
Bonn, 28 July - 5 August 1997
Item 7 (a) of the provisional agenda
Paragraphs Page
I. INTRODUCTION 1 - 12 3
A. Mandate 1 - 3 3
B. Scope of the note 4 - 10 3
C. Possible action by the SBI 11 - 12 5
II. CONTEXT OF THE PROPOSED BUDGET 13 - 23 8
A. Structure 13 8
B. Overhead charge and its use 14 - 16 8
C. Working capital reserve 17 - 19 8
D. Standard figures used in calculating staff costs 20 9
E. Other methods and assumptions used 21 - 23 9
GE.97-
Paragraphs Page
III. PROPOSED BUDGET OF THE CONVENTION FOR
THE BIENNIUM 1998-1999 24 - 31 12
A. Programmes of work 24 - 29 12
B. Summary 30 - 31 17
IV. CONTINGENCIES 32 - 38 19
A. Post-Kyoto intergovernmental process 32 19
B. Conference servicing 33 - 38 20
I. Trust Fund for Participation in the UNFCCC Process 25
II. Trust Fund for Supplementary Activities 27
III. Summary of resource estimates for the
biennium 1998-1999 29
1. The core administrative costs of the Conference of the Parties
(COP), its subsidiary bodies and the Convention secretariat are met
through a biennial programme budget to which contributions are made
each year by Parties on the basis of an indicative scale. Both the
budget and the scale are adopted by consensus by the COP. The budget
is to be adopted prior to the commencement of each biennium. (See
annex I of decision 15/CP.1.)
2. The next programme budget will be for the biennium 1998-1999
and is to be adopted by the COP at its third session (COP 3). In
preparation for this, the Subsidiary Body for Implementation (SBI),
at its fifth session (SBI 5), endorsed a timetable and a process for
the review and adoption of the programme budget. This timetable
provides for the SBI at its sixth session (SBI 6) to complete its
review of the budget and to recommend a budget decision to COP 3 for
adoption. The budget process set out in the SBI conclusions
recognizes that some elements of uncertainty might not be removed
until COP 3 convenes in December 1997 but that it will be necessary,
nevertheless, for the Executive Secretary to notify the Parties by 1
October 1997 of the indicative contributions due to the budget by 1
January 1998. It also envisages that COP 3 will adopt the budget as
recommended by the SBI 6, except for any modifications that may
result from other decisions of COP 3 that have budgetary
implications. (See FCCC/SBI/1997/6, paragraph 29.)
3. The conclusions of the SBI also required the Executive Secretary to propose to the sixth session of that body a comprehensive, detailed and timely programme budget for the biennium 1998-1999 (FCCC/SBI/1997/6, para. 29 (a) and (b)). This note seeks to respond to the requirements of the SBI. The results of any informal inter-sessional consultations that the Chairman of the SBI might convene, as envisaged in the SBI conclusions
(FCCC/SBI/1997/6, para. 29 (c)), will be reflected in the secretariat's introduction of this document to SBI 6.
4. The proposed programme budget for the biennium 1998-1999, contained in this document, builds upon the perspectives and the approach presented by the
Executive Secretary to SBI 5 in document FCCC/SBI/1997/3, which
will also be made available to SBI 6. The essence of the approach is
that the proposed work programme for 1998-1999 has been constructed
from a zero base. Consequently, the structure and outputs of the
programmes and subprogrammes, as well as the resources required to
deliver the latter, cannot always be compared with elements of the
current programme budget for 1996-1997. The only elements that can be
compared thus are the overall staffing table of the secretariat and
the total amount of resources sought. These comparisons are made in
the present document. (See tables 13 and 14 and paragraphs 30 and 31
below.)
5. The main difference between the core budget proposals in the present document and the estimates considered by SBI 5 is the reduction in the proposed staffing of the secretariat (which amounts to 9 fewer additional posts in 1998, and 13 fewer additional posts in 1999).(1) A number of other cost items have also been revised downwards. The total amount of programme expenditures envisaged has also decreased to circa $9.7 million in 1998 and
$10.7 million in 1999. The comparable estimates presented to SBI 5 were that $11.2 to
$11.7 million would be required in 1998, and that $12.6 to $13.1
million would be needed in 1999. These adjustments take account of
concerns expressed by some Parties that the staffing and resource
levels presented to SBI 5 were too high, as well as the initial
comments made by Parties in the SBI and the Subsidiary Body for
Scientific and Technological Advice (SBSTA) concerning the content
and scope of proposed programme activities.
6. In addition, there are a few presentational
modifications:
(a) The programme for "Conference Management and Information
Services" (CMIS) has been renamed "Conference and Information
Support" (CIS). Its subprogrammes have also been renamed in
consequence;
(b) The resources envisaged for the "Policy-Making Organs" programme, covering costs related to sessions of Convention bodies, have been incorporated into the programmes for Conference and Information Support, and Resources, Planning and Coordination. Consequently, the proposed budget no longer includes a programme for policy-making organs. This will not affect the services provided to the Convention bodies and is intended to further streamline the financial management of the secretariat; and
(c) The secretariat's plans for the Trust Fund for Supplementary
Activities have evolved since SBI 5 and now include a proposed
Fellowship Programme and resources for outreach activities to
non-governmental actors.
7. An explanation of factors and assumptions taken into
consideration in preparing the proposed budget is in section II of
this note. The budget itself is presented in section III. It has been
divided by programme and, when applicable, further broken down into
subprogrammes. Detailed information on activities and
resource needs are to be found in FCCC/SBI/1997/INF.1. The
presentation of each programme includes summary tables of programme
staffing and resource requirements from the core budget. These tables
are consolidated at the end of the section III into tables that show
staffing and resource needs for the whole secretariat (see section
III B, tables 13 and 14).
8. An important feature of the detailed information on
subprogrammes in document FCCC/SBI/1997/INF.1 is the attempt to
describe the limits of the activities that the secretariat proposes
to undertake and, in some cases, to specify activities that will not
be undertaken. These limits arise from mandates, or lack thereof, as
well as from the secretariat's estimates of what can be achieved with
available resources. In some cases, the limits relate to assumptions
about the availability of supplementary financing.
9. The proposed budget is followed by section IV relating to
contingencies. This section provides a description of the resources
that would be required to undertake additional work related
to:
(a) A post-Kyoto intergovernmental process (contingent upon a decision by
COP 3); and
(b) Conference servicing, should the UNFCCC be required to take on
this responsibility in the coming biennium (contingent upon a
decision by the United Nations General Assembly at its 52nd
session).
10. Annexes I and II to this note provide presentations of the respective resources needed for the Trust Fund for Participation in the UNFCCC Process and the Trust Fund for Supplementary Activities. Annex III contains a summary of resource estimates for the coming biennium from all funding sources. A report on the review of administrative arrangements will be issued at a later date.
11. To facilitate the review and consideration of the proposed
programme budget, the Chairman of the SBI may wish to convene
informal consultations at the start of SBI 6. He may also wish to
invite the Chairman of the SBSTA to encourage delegations to involve
their experts from SBSTA in the review of those aspects of the
programme budget relevant to SBSTA, particularly with regard to the
methodology
subprogramme.(2)
12. In accordance with its conclusions at its fifth session, the
SBI may wish to:
(a) Recommend to COP 3 a budget decision with the following
elements:
(i) A total programme budget of $21,507,300 for the biennium
1998-1999, for the purposes listed in table 1 below (not including
contingency items(3));
(ii) secretariat-wide staffing table broken down by level, as
included in this document as table 13 (see page 17);
(iii) The level of remuneration of the post of Executive Secretary
and of the other two senior posts in the staffing table;
(iv) A provision enabling the Executive Secretary to transfer
resources among programmes within limits, repeating the provision
contained in decision 17/CP.1, paragraph 5 (which is in accordance
with paragraph 6 of the financial procedures); and
(v) A working capital reserve level of 8.3 per cent.
(b) Recommend to the COP that approved levels of resources be
included in the programme budget on a contingency basis for the
following activities:
(i) Implementation of a post-Kyoto intergovernmental process,
should this be decided by COP 3; and
(ii) Conference servicing of meetings of the Convention bodies,
should the General Assembly at its 52nd session not provide for this
in the United Nations programme budget for 1998-1999.
(c) Recommend to COP 3 that it take note of the funding estimates
for the Trust Fund for Participation in the UNFCCC Process and the
Trust Fund for Supplementary Activities under the UNFCCC (see annexes
I and II);
(d) Invite the President of the COP to communicate forthwith to the
Secretary-General of the United Nations the recommended level of remuneration of the
post of Executive Secretary so that an appointment to that post
may be made for a period beginning 1 January 1998; and
(e) Authorize the Executive Secretary to notify the Parties by 1 October 1997 of their indicative contributions due to the core budget by 1 January 1998 on the basis of the budget it recommends to COP 3 and, to this end, authorize the Executive Secretary to adapt the indicative scale of contributions (decision 15/CP.1, paragraph 7 (a) and annex II) to any changes that may be agreed by the General Assembly in the United Nations scale of assessments and request him to inform SBI 6 of any such adaptations.
Expenditures I. Programmes |
1998 |
1999 |
Executive Direction and Management |
623.8 |
640.3 |
Science and Technology |
2,051.9 |
2,577.3 |
Implementation |
3,251.4 |
3,363.5 |
Conference and Information Support |
1,957.8 |
2,167.1 |
Resources, Planning and Coordination |
1,786.4 |
1,918.1 |
Subtotal (I) |
9,671.3 |
10,666.3 |
II. Payments to the United Nations |
|
|
Overhead charge(4) |
1,257.3 |
1,386.6 |
Subtotal (II) |
1,257.3 |
1,386.6 |
III. Working capital reserve(5) |
207.7 |
93.3 |
Subtotal (III) |
207.7 |
93.3 |
Total Expenditure Lines (I+II+III) |
11,136.3 |
12,146.2 |
Income |
|
|
|
|
|
Total Income |
887.6 |
887.6 |
NET TOTAL |
10,248.7 |
11,258.6 |
13. The programme budget for 1998-1999 has been prepared on the basis of the secretariat structure presented to SBI 5 (see FCCC/SBI/1997/3, paras. 20-45), with the modifications indicated in paragraph 6 above. Figure 1 at the end of this section illustrates the programme structure and the proposed allocation of staff by subprogramme.
14. Following standard practice, the Convention is required to pay
a thirteen per cent overhead charge to the United Nations to cover
the costs of the administrative services it provides to the
Convention. The United Nations Department of Administration and
Management (DAM) returns a portion of these payments to the
Convention secretariat to help cover the costs of the secretariat's
financial management and administration subprogramme.
15. In 1996, overhead funds were returned to finance the costs of
one professional and two general service posts (all three of which
had been approved by COP 1 as part of the core budget). Funding was
increased in 1997 to finance one additional professional and two
additional general service posts.
16. These arrangements are being reviewed with DAM and United Nations Office at Geneva (UNOG). The result of the review will be reported to the SBI. It is foreseen, nevertheless, that the arrangements will continue in 1998 and 1999. The secretariat will seek overhead resources for additional administrative posts in the professional and general service categories. The resource allocations contained in the proposed budget reflect the assumption that overhead funds will be provided for all administrative posts required throughout the coming biennium. Should this not be the case, resource needs for the secretariat's administration would need to be reconsidered.
17. In paragraph 14 of its decision 15/CP.1, annex I, the COP
decided that a working capital reserve should be maintained to
"ensure continuity of operations in the event of a temporary
shortfall of cash". The level of this reserve is to be determined
from time to time by the COP by consensus.
18. The reserve level was set at 8.3 per cent of expenditures
(representing one month of operating requirements) for both 1996 and
1997 (see decisions 17/CP.1, para. 1, and 16/CP.2, para. 6,
respectively). This amounted to $619,300 in 1996 and $699,400 in 1997
(that is, an additional $80,100 over 1996). The level is scheduled to
be reviewed again at COP 3 (see decision 16/CP.2, para.
6).
19. Budget requirements for the coming biennium have been calculated in anticipation of the reserve level being maintained at 8.3 per cent of expenditures in both years. As the bulk of this reserve would be constituted by funds carried over from 1997, the budget proposed in this document includes only the allocations that will be necessary to raise the reserve to
8.3 per cent of 1998 and 1999 expenditures ($207,700 and $93,300 respectively). These amounts would need to be revised in accordance with the level of the agreed budget, and in the event that the COP decides to set a different reserve level in either or both years.
20. The figures used in calculating staff costs in the budget proposed for the biennium 1998-1999 are based on the standard figures used in the preparation of the United Nations programme budget for the same biennium, taking Bonn as duty station. They include both salaries and common staff costs (benefits and entitlements estimated at 33 per cent of net salary plus post adjustment for professionals, and 25 per cent of net salary adjustment for general service staff members). The assumed exchange rate is US$1 = DM 1.69. These figures are listed in table 2 below.
Level |
1998 |
1999 |
Assistant Secretary-General (ASG) |
185,203 |
190,520 |
D-2 |
170,100 |
174,983 |
D-1 |
159,741 |
164,327 |
P-5 |
152,625 |
157,006 |
P-4 |
137,147 |
141,084 |
P-3 |
118,348 |
121,746 |
P-2 |
94,327 |
97,035 |
General Service |
52,832 |
54,371 |
21. The following methods have been followed in preparing the
proposed programme budget:
(a) All of the staffing tables contained in this document reflect
work-years of employment rather than fixed positions or
posts;
(b) Programme support costs (such as communications, office
supplies, maintenance) have been grouped under the financial
management and administration subprogramme of the RPC programme,
rather than being distributed by programme; and
(c) Each programme's direction and management subprogramme
includes the temporary assistance and overtime costs for the
programme as a whole.
22. For budgetary calculations, it has been assumed
that:
(a) Resource needs should be determined on the basis of the annual
calendar of meetings envisaged by the SBI, that is, two sessional
periods, each lasting two weeks and one of which would include a
one-week meeting of the COP (see FCCC/SBI/1997/6);
(b) The portion of the overhead charge returned to the secretariat
will be sufficient to cover all administrative staff
costs;
(c) The 'Bonn Fund'(6) will be
sufficient to cover a portion of the CIS programme's staff costs;
and
(d) During the coming
biennium:
(i) The level of remuneration of the Executive
Secretary will be maintained at the level of Assistant
Secretary-General in the United Nations Secretariat structure;
and
(ii) The two other senior posts will be maintained
at the D-2 level.
Both of the assumptions in (d) above are subject
to review at COP 3 (see decisions 14/CP.1 and 14/CP.2). Should they
prove incorrect, minor adjustments to the budget will be necessary;
(e) Following a practice adopted in the previous
programme budget, the Convention will maintain an annual contribution
to the Intergovernmental Panel on Climate Change (IPCC) throughout
the coming biennium. It is proposed in this budget that the level of
support be set at $350,000 in 1998 and $400,000 in 1999 and included
in the S&T programme. The increase in 1999 responds to the
calendar for preparation of the Third Assessment
Report;
23. Changes in any of the above assumptions may
result in changes in the resources required in the Convention's core
budget and/or trust funds for the biennium
1998-1999.
24. The programme budget for 1998-1999 consists of
five programmes of work. These are Executive Direction and
Management; Science and Technology; Implementation; Conference and
Information Support; Resources, Planning and Coordination. The
descriptions of these programmes in document FCCC/SBI/1997/3 remain
valid. This section of the present document contains tables showing
the staffing and resource requirements from the core budget for each
of these programmes, together with a summary description of the
programme. Each programme, other than that for Executive Direction
and Management, includes a subprogramme for direction and management
and one or more other subprogrammes. Details of activities and
resource requirements at the level of subprogrammes are given in
FCCC/SBI/1997/INF.1.
25. The Executive Direction and Management (EDM) programme enables the
Executive Secretary to provide overall direction and guidance to the secretariat, ensuring the coherence of the secretariat's activities, its proposals to Convention bodies and its advice to their officers. To this end, the programme organizes internal management processes and ensures an adequate flow of information throughout the secretariat. It also coordinates the representation of the secretariat in external meetings. Through the Executive Secretary, this programme is the principal interface between the secretariat and the Parties. The
Executive Secretary is also accountable to the Secretary-General of the United Nations,
inter alia for the observance of the Financial and Staff Regulations and Rules of the
United Nations.
|
|
|
A. Professional category and above |
|
|
Executive Secretary |
|
|
P-4 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
572.3 |
588.8 |
B. Travel on official business |
51.5 |
51.5 |
TOTAL (A+B) |
623.8 |
640.3 |
26. The Science and
Technology (S&T) programme
coordinates the secretariat's support to the SBSTA and is the
principal interface at the secretariat level with the IPCC and other
intergovernmental processes of a scientific and/or technical nature.
Through three subprogrammes, it carries out the secretariat's work on
technology (including its transfer and the analysis of related
technical issues), methodology and science. It also includes the
contribution of the Convention to the IPCC budget.(8)
|
|
|
A. Professional category and above |
|
|
D-2 |
|
|
D-1 |
|
|
P-5 |
|
|
P-4 |
|
|
P-3 |
|
|
P-2 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
1,337.4 |
1,789.8 |
B. Consultants |
192.0 |
192.0 |
C. Expert Groups |
60.0 |
54.0 |
D. Travel on official business |
112.5 |
141.5 |
E. Grants/contributions |
350.0 |
400.0 |
TOTAL |
2,051.9 |
2,577.3 |
27. The Implementation (IMP)
programme coordinates the secretariat's support for the SBI and the
Ad Hoc Group on Article 13 (AG13) and is the principal interface at
the secretariat level with the Global Environment Facility (GEF) and
other financial institutions. Through four subprogrammes, it carries
out the work of the secretariat on the compilation, synthesis and
publication of information relating to the implementation of the
Convention by the Parties, support for the establishment of a
multilateral consultative process, guidelines for communications and
for their review or consideration, the in-depth review of
communications by Annex I Parties, the facilitation of communications
by non-Annex I Parties, the financial mechanism of the Convention and
the pilot phase of activities implemented jointly.
|
|
|
A. Professional category and above |
|
|
D-2 |
|
|
D-1 |
|
|
P-5 |
|
|
P-4 |
|
|
P-3 |
|
|
P-2 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
2,581.4 |
2,695.0 |
B. Consultants |
258.0 |
258.0 |
C. Expert Groups |
195.0 |
201.0 |
D. Travel on official business |
217.0 |
209.5 |
TOTAL |
3,251.4 |
3,363.5 |
28. The Conference and Information Support (CIS) programme, through two
subprogrammes, ensures that the Convention bodies
receive the facilities, documentation and other services necessary
for their work, including services provided by the United Nations
Secretariat, manages arrangements related to participation by Parties
and observers in Convention bodies, and provides the secretariat with
its information systems, including the communication and computer
system, data bases, and the dissemination of documentation and other
information. This programme is the principal interface of the
secretariat with the information media.(9)
|
|
|
A. Professional category and above |
|
|
D-1 |
|
|
P-5 |
|
|
P-4 |
|
|
P-3 |
|
|
P-2 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
1,658.3 |
1,751.1 |
B. Consultants |
108.0 |
108.0 |
C. Travel on official business |
66.5 |
66.5 |
D. Acquisition of furniture/equipment(10) |
125.0 |
241.5 |
TOTAL |
1,957.8 |
2,167.1 |
29. The Resources, Planning and Coordination (RPC) programme supports the Executive Secretary in planning and coordinating the secretariat's work programme and mobilizing financial resources for it, as well as in ensuring substantive support for the COP and its Bureau and providing legal advice to Convention bodies. It is the main interface of the secretariat with the principal coordinating mechanisms of the United Nations that are relevant to the Convention process. This programme incorporates a subprogramme on financial management and administration, funded by the return of overhead funds, that provides the secretariat with the whole range of administrative services, in cooperation with the relevant services of the United Nations Secretariat. General support costs for the entire secretariat, such as general operating expenses, communications, supplies, materials, office furniture and equipment are charged to this programme rather than being allocated to separate programmes.
|
|
|
A. Professional category and above |
|
|
D-1 |
|
|
P-5 |
|
|
P-3 |
|
|
P-2 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
634.3 |
701.1 |
B. Consultants |
54.0 |
54.0 |
C. Travel on official business |
45.5 |
45.5 |
D. General operating expenses |
257.6 |
325.0 |
E. Supplies and materials |
100.0 |
100.0 |
F. Furniture and equipment |
70.0 |
52.5 |
G. Contractual services |
100.0 |
100.0 |
H. Contribution to joint activities |
525.0 |
540.0 |
TOTAL |
1,786.4 |
1,918.1 |
|
|
|
|
A. Professional category and above |
|
|
|
Executive Secretary |
|
|
|
D-2 |
|
|
|
D-1 |
|
|
|
P-5 |
|
|
|
P-4 |
|
|
|
P-3 |
|
|
|
P-2 |
|
|
|
Total A |
|
|
|
B. General Service category |
|
|
|
Total B |
|
|
|
TOTAL (A+B) |
|
|
|
Item of expenditure |
1997 |
1998 |
1999 |
A. Staff costs |
5,105.5 |
6,783.8 |
7,525.8 |
B. Consultants |
271.7 |
612.0 |
612.0 |
C. Expert Groups |
209.9 |
255.0 |
255.0 |
D. Travel on official business |
480.6 |
493.0 |
514.5 |
E. Contractual services |
81.2 |
100.0 |
100.0 |
F. Supplies and materials |
119.4 |
100.0 |
100.0 |
G. Acquisition furniture/equipment |
96.9 |
195.0 |
294.0 |
H. General operating expenses |
413.4 |
257.5 |
325.0 |
I. Contributions to joint activities |
332.8 |
525.0 |
540.0 |
J. Grants and contributions |
310.6 |
350.0 |
400.0 |
TOTAL |
7,422.0 |
9,671.3 |
10,666.3 |
30. In relation to staff costs approved by the COP for 1997, staff costs increase by
32.9 per cent in 1998 and 47.4 per cent in 1999.
These increases are concentrated in the lower professional grades
(P-2 to P-4) and in general service staff, as shown in table 13. They
reflect, in the main, a general adaptation to the demand for
substantive documentation for Convention bodies and for better
organization of their sessions. While growth in the former demand
will be felt across the secretariat, the latter will be borne mainly
by the staff of the CIS programme, which will also respond to demand
for information products and provide office technologies to the whole
secretariat. In terms of programme content, the main areas of
proposed growth are the subprogrammes on technology and methodology,
in the S&T programme.
31. The resource requirements for many non-staff
costs also vary from those approved for 1997. The estimates for the
current budget were made in early 1995, before experience had been
acquired by the secretariat in servicing the Convention bodies and in
operating in Bonn. Lessons learned from that experience indicate that
staff work needs considerably more support by specialized
consultants. They also point to the need for a higher allocation
towards costs related to the Bonn premises, and a lower allocation
for supplies and materials. In addition, the allocation for furniture
and equipment enjoyed a windfall benefit in 1997, on account of the
generous contribution by the Government of Germany to the initial
equipping of the secretariat. In the coming biennium, this budget
line will have to be fully funded, meeting needs for new work
stations and for normal replacement of computer
hardware.
32. As was noted by the Executive Secretary in the
perspectives on financial requirements submitted to SBI 5, the
secretariat will need resources above and beyond those included in
this programme budget should COP 3 establish an ad hoc
inter-governmental process to implement the outcomes of the Berlin
Mandate (see FCCC/SBI/1997/3, paras. 79-80) and/or to launch a
'prompt start' process. These resources would be used to support a
new programme within the secretariat's structure, which would consist
of three staff members, two professional and one general service. The
main function of this programme would be to manage and provide
support to any post-Kyoto process by preparing documentation,
organizing meetings, and supporting a bureau. Its capacity to conduct
analytical work would be limited; resources in addition to those
below would be a prerequisite to substantial amounts of analytical
work being undertaken. Should the Kyoto instrument, or related
decisions, result in additional programme-related work (regarding,
for example, national communications, reviews or methodological
issues), this could be integrated into the appropriate programme to
the extent the resources are provided for this process. The staffing
and resources requirements are presented in tables 15 and 16
below.
|
|
|
A. Professional category and above |
|
|
D-1 |
|
|
P-3 |
|
|
Total A |
|
|
B. General Service category |
|
|
Total B |
|
|
TOTAL (A+B) |
|
|
Item of expenditure |
1998 |
1999 |
A. Staff costs |
|
|
Posts |
165.5 |
340.5 |
Overtime |
2.2 |
4.5 |
B. Consultants |
54.0 |
54.0 |
C Travel on official business |
20.5 |
45.5 |
SUBTOTAL |
242.2 |
444.5 |
Overhead charge |
31.5 |
57.8 |
Cash reserve |
22.7 |
41.7 |
TOTAL |
296.4 |
544.0 |
33. In the event that the General Assembly decides
not to include the needs of the UNFCCC in its regular budget for the
biennium 1998-1999, the Parties would have to assume these costs
within the Convention budget (see FCCC/SBI/1997/3, paras.
58-66).
34. The following proposed contingency budget for
the biennium 1998-1999 has been prepared in response to this
eventuality. It is based on the 1996 statistics for conference
servicing as provided by UNOG (the body presently charged with the
Convention's conference servicing). The estimates have been
calculated on the basis of the prevailing standard rates for
contractual conference servicing (as applied by a number of qualified
suppliers known to observe United Nations rules and regulations
concerning the recruitment of short-term conference staff and the
processing of documentation) and taking into consideration the need
to maintain the current quality of services.(11)
35. In order to secure conference servicing which guarantees maximum flexibility and cost-effectiveness while at the same time preserving the quality of work expected of a
body affiliated to the United Nations, it is
proposed that conference servicing requirements are split into the
following categories:
(a) Meeting servicing (including provision of
interpretation, local support staff, and overall supervision of
meeting arrangements);
(b) Documentation production; and
(c) Other requirements.
36. Meeting servicing and documentation services
would be put out to tender to selected private and United Nations
sources (including UNOG), with contracts awarded to the most
competitive bidders.
37. The process outlined above, which is similar
to one under consideration by other international organizations and
is based on Resolution 5.2.4 the World Meteorological Organization
(adopted at its Twelfth World Congress), is seen as an effective way
to simultaneously maximize limited financial resources and preserve
the quality of work. It has been developed based on new information
obtained subsequent to SBI 5, and is expected to be more cost
effective than the options presented previously (namely, contracting
all services from UNOG; from a fixed combination of United Nations
and private sources; or from strictly private sources). The "other
requirements" are largely fixed costs necessary to deliver the
conference services.
38. Within the secretariat, the conference support
subprogramme of CIS will be responsible for overseeing the provision
of conference services. All additional regular and temporary staff
members recruited to assist in activities relating to conference
servicing will report to the manager of that subprogramme, and
ultimately to the Coordinator of CIS.
Item of expenditure |
1998 |
1999 |
I. Meeting servicing(12) |
419.4 |
431.5 |
II. Documentation(13) |
698.5 |
737.4 |
III. Other requirements(14) |
707.5 |
728.1 |
IV. Travel of staff to meetings(15) |
265.5 |
265.5 |
V. Miscellaneous(16) |
10.5 |
10.5 |
VI. Contingencies and exchange rate fluctuation |
63.0 |
65.2 |
SUBTOTAL |
2,164.4 |
2,238.2 |
VII. Overhead charge(17) |
281.4 |
291.0 |
VIII. Working Capital Reserve(18) |
203.0 |
6.9 |
TOTAL |
2,648.8 |
2,536.1 |
(a) General assumptions used in preparing the
above estimates:
(i) Venue of all meetings: Bonn, Federal Republic
of Germany;
(ii) Duration: 20 working days per year (two
two-week sessions per year), encompassing 80 meetings (reflects
capacity for parallel meetings);
(iii) Languages of interpretation and translation:
Arabic, Chinese, English, French, Russian, Spanish;
(b) Comments by section:
(i) Meeting servicing: Includes the costs of
recruiting non-local conference room supervisors and teams of
interpreters. The cost of meeting servicing depends mainly on the
number of meetings held with interpretation and the number of
languages required.
(ii) Documentation: Annual documentation
requirements have been calculated based on the following estimates
(based on historic averages):
Pre-session: 700 original pages
In-session: 200 original pages
Post-session: 400 original pages
Reproduction: 10,000,000 pages
Distribution: 200,000 documents
Rates used for the processing of documentation are
based on a survey of prevailing rates for contractual translation
applied within the United Nations system. Rates have been calculated
assuming that only in-session and post-session documentation will be
reproduced in Bonn, whereas all documentation will be distributed
from Bonn. Documentation costs depend primarily on the number of
documents produced, the length of each document, the number of
languages for translation, and the number of copies
required.
(iii) Other requirements: Regular staff includes
an additional Programme Officer and four additional general service
staff members for the conference support subprogramme of CIS;
temporary staff and consultants include distribution supervisors,
reproduction supervisors, technical specialists, and clerks. It is
based on a combination of local and non-local
recruitment.
(iv) Travel of staff to meetings: Necessary for
interpreters and other short-term non-local supervisory staff. Costs
have been calculated based on an average roundtrip fare between
Paris/London/Vienna/ Geneva and Cologne.
(v) Miscellaneous: Includes photocopy paper for in-session documentation (based on the allocation within the regular budget of the United Nations).
1. The Trust Fund for Participation in the UNFCCC
Process is a special fund designed to receive voluntary contributions
to support participation in sessions of the Convention bodies by
representatives of developing-country Parties, particularly those
that are least developed countries or small island developing States,
and of other Parties with economies in transition. It was created by
the Secretary-General of the United Nations and is managed by the
Executive Secretary, in accordance with paragraph 15 of decision
15/CP.1. The current basic eligibility criterion for the funding of
the participation of a Party is that its per capita gross domestic
product was $ 5,500 or less in 1994. This criterion is reviewed from
time to time, as new GDP data become available. In the event of a
shortage in the fund, priority is given to support representation
from least-developed countries and small island developing
States.
2. Total expenditure from this Fund in 1996 amounted to $1.526 million. (Contributions received in 1996 were sufficient to fund the participation of only circa 75 per cent of all eligible recipients, although not all eligible Parties sought funding.) If contributions for the remainder of 1997 are enough to fund all eligible recipients for the sessions remaining in
the year, it is projected that total expenditure for 1997 will amount to approximately
$2.301 million.
3. At the most recent session of the subsidiary bodies (February/March 1997),
125 Parties were eligible for support. Based on an
expectation that this number will increase, it is estimated that 130
Parties will be eligible for support from this Fund in 1998 and 135
in 1999. These Parties will need to be financed for two sessional
periods of two weeks each, one of which will include a week-long
meeting of the COP (see FCCC/SBI/1997/6).
4. The estimated resources needed for this fund to
ensure provision of support to all eligible Parties at all sessions
are provided in table 18 below.
Item |
1998 |
1999 |
Support for eligible Parties to participate in one two-week session of the subsidiary bodies |
715.0 |
742.5 |
Support for eligible Parties to participate in one two-week session of the COP and its subsidiary bodies(19) |
1,100.0 |
1,127.5 |
SUBTOTAL |
1,815.0 |
1,870.0 |
Overhead charge(20) |
236.0 |
243.1 |
Cash reserve(21) |
205.1 |
211.3 |
TOTAL |
2,256.1 |
2,324.4 |
1. The Trust Fund for Supplementary Activities is
used to support a variety of activities undertaken by the secretariat
in response to needs and requests stemming from the Convention
process. As these are continuously emerging, it is difficult to
forecast too far in advance the precise levels of resources that will
be required in this Fund. The COP at its first session noted
projected supplementary funding levels of circa $1,310,460 in 1996
and $1,451,370 in 1997 (both figures include overheads).
2. Based on the positive feedback received from the Parties, the secretariat plans to extend the initiatives currently supported by this fund into the next biennium. The secretariat also plans to launch new activities, such as the Fellowship Programme and outreach to
non-governmental actors. The resources that will be needed for the maintenance and/or development of these activities are indicated in table 22 below. Detailed descriptions of each activity can be found in FCCC/SBI/1997/INF.1.
Item of expenditure |
1998 |
1999 |
I. CC: INFO/Web A. Consultants |
|
|
B. Participants |
90.0 |
90.0 |
SUBTOTAL |
114.0 |
114.0 |
II. CC: INFO Information services and products |
|
|
A. Staff costs |
359.7 |
375.3 |
B. Consultants |
372.0 |
372.0 |
C. External printing |
125.0 |
125.0 |
D. Acquisition furniture/equipment |
2.5 |
0.0 |
E. Communications |
33.6 |
33.6 |
SUBTOTAL |
892.8 |
905.9 |
III. Fellowship Programme |
|
|
A. Personnel service contracts |
100.0 |
100.0 |
SUBTOTAL |
100.0 |
100.0 |
IV. Workshops and meetings on implementation |
|
|
A. Expert Groups |
258.0 |
258.0 |
B. Travel on official business |
16.5 |
16.5 |
SUBTOTAL |
274.5 |
274.5 |
V. Non-governmental outreach |
206.0 |
211.0 |
A. Staff costs |
125.0 |
130.0 |
B. Consultants |
36.0 |
36.0 |
C. Expert Groups |
30.0 |
30.0 |
D. Travel on official business |
15.0 |
15.0 |
SUBTOTAL |
206.0 |
211.0 |
TOTAL (I - V) |
1,587.3 |
1,605.4 |
Overhead charge |
206.3 |
208.7 |
Cash reserve |
269.0 |
272.1 |
TOTAL |
2,062.6 |
2,086.2 |
Proposed source of funding |
1998 |
1999 |
Core budget |
|
|
Proposed budget |
10,248.7 |
11,258.6 |
Contingency: Post-Kyoto intergovernmental process |
296.4 |
544.0 |
Contingency: Conference servicing |
2,648.9 |
2,536.1 |
CORE BUDGET TOTAL |
13,194.0 |
14,338.7 |
Trust Fund for Participation in the UNFCCC Process |
2,256.1 |
2,324.4 |
Trust Fund for Supplementary Activities |
2,062.6 |
2,086.2 |
TOTAL |
17,512.7 |
18,749.3 |