Your location: Home >  > Meetings


AWG-LCA - AWG-LCA 12
4 - 9 Oct 2010



Other Documents and relevant information

In-session draft texts:

Drafting Group on Shared vision
Draft text - 09.10.2010 at 13.00 (102 kB) (Review, Chapter I, paragraph 68-71)
This draft text replaces the version of 06.10.2010 at 15.00
pdf-icon Draft text - 09.10.2010 at 16.50 (152 kB) (A shared vision for long-term cooperative action-Chapter I, paragraphs 1-12)
This draft text replaces the version of 09.10.2010 at 08.00
pdf-icon Note by the co-facilitator - 09.10.2010 at 16.30 (168 kB) (Example of how paragraphs 1 ter - 4bis and quinquies could be disentangled and restructured)

Drafting Group on enhanced action on adaptation
pdf-icon Draft text - 09.10.2010 at 15.30 (Chapter II) (163 kB)
pdf-icon Note by the co-facilitator - 09.10.2010 at 15.30 (113 kB)

Drafting Group on Mitigation
Note by the co-facilitator - 09.10.2010 at 14.00 (159 kB) (Facilitator's reflections on the issues discussed at the meetings on 1 (b) (i) of the Bali Action Plan)
Note by the co-facilitator - 09.10.2010 at 16.00 (164 kB) (Facilitator's reflections on the issues discussed at the meetings on 1 (b) (ii) of the Bali Action Plan)
Draft text -09.10.2010 at 16.30 (190 kB) (1b(v) of the Bali Action Plan, Chapter VIII)
This draft text replaces the version of 08.10.2010 at 20.00
pdf-icon Draft text -08.10.2010 at 22.00 (173 kB) (1b(vi) of the Bali Action Plan -Chapter I, paragraph 59 (and its two proceding paragraphs), and Chapter VII)

Drafting Group on Finance, Technology and Capacity-building
pdf-icon Note by the co-facilitator - 08.10.2010 at 21.00 (124 kB) (Establishment of a new fund and a new body)
pdf-icon Draft text - 09.10.2010 at 10.30 (144 kB) (Composition and mandate of the Technology Executive Committee, Chapter IV, paragraph 8)
This draft text replaces the version of 07.10.2010 at 13.00
pdf-icon Note by the co-facilitator - 09.10.2010 at 16.00 (148 kB) (Considerations on the composition and mandate of the Climate Technology Centre and Network)
This note replaces the version of 09.10.2010 at 10.30
pdf-icon Note by the co-facilitator - 09.10.2010 at 15.35 (127 kB) (Points of discussion on capacity-building)

Notification