The uniform reporting format contained below is to be used in reporting on activities implemented jointly
under the pilot phase. It is noted that the reporting should be consistent with decision 5/CP.1 and 8/CP.2
(reproduced in annexes I and II to this reporting format). The SBSTA notes that the uniform reporting
format could possibly require revision in the light of experience gained and methodological work conducted
under the pilot phase.
List of
Projects
A. Description of the AIJ project
1. Title of project: SELCO--Sri Lanka Rural Electrification Project
2. Host country: Sri Lanka
3. Brief project description:
This project involves marketing solar home systems (SHS) as an alternative to the use of kerosene lamps for
lighting and the use of diesel-electric charging of lead-acid batteries for powering small home appliances
in Sri Lanka. Each SHS will consist of a 12-volt photovoltaic (PV) panel, a battery and charge controller,
compact fluorescent lamps, and hardware. The project will expand on successful pilot efforts in Sri Lanka
to provide SHS demonstration and installation services, consumer financing, and technical assistance to
rural homeowners who lack access to grid electricity. The project team expects to install 812,000 SHS over
a period of 10 years, and each SHS will generate GHG benefits for 20 years. The project will generate GHG
benefits by displacing kerosene lamps and associated emissions of carbon dioxide (CO2).
4. Participants:
|
Name of Organization or Individual
|
Country
|
|
Renewable Energy Services (RESCO) Asia Limited
|
Sri Lanka
|
|
Solar Electric Light Company (SELCO)
|
U.S.A.
|
|
Trexler and Associates, Inc. (TAA)
|
U.S.A.
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
Renewable Energy Service Company Asia, Ltd.
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
RESCO
|
|
Acronym (English)
|
(Same as above)
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
Project administration
|
|
Street
|
8 Visaka Road
|
|
City
|
Colombo 4
|
|
State
|
|
|
Post code
|
|
|
Country
|
Sri Lanka
|
|
Telephone
|
94-1-582876; 94-(0)71-10500
|
|
Fax
|
94-1-503666; 94-1-502572
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Wijesooriya
|
|
First name, middle name
|
Priyantha D.
|
|
Job title
|
|
|
Direct telephone
|
94-1-582876; 94-(0)71-10500
|
|
Direct fax
|
94-1-503666; 94-1-502572
|
|
Direct e-mail
|
priyaw@ens.lk
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
Trexler
|
|
First name, middle name
|
Dr. Mark C.
|
|
Job title
|
President of Trexler and Associates, Inc.
|
|
Direct telephone
|
503-786-0559
|
|
Direct fax
|
503-786-9859
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
Solar Electric Light Company
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
SELCO
|
|
Acronym (English)
|
(Same as above)
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
Project development, project administration
|
|
Street
|
35 Wisconsin Circle, #510
|
|
City
|
Chevy Chase
|
|
State
|
Maryland
|
|
Post code
|
20815
|
|
Country
|
U.S.A.
|
|
Telephone
|
301-657-1161
|
|
Fax
|
301-657-1165
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Williams
|
|
First name, middle name
|
Neville
|
|
Job title
|
Chairman and CEO
|
|
Direct telephone
|
301-657-1161
|
|
Direct fax
|
301-657-1165
|
|
Direct e-mail
|
nwilliams@selco-intl.org
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
Trexler and Associates, Inc.
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
TAA
|
|
Acronym (English)
|
(Same as above)
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
Project development, project administration
|
|
Street
|
1131 S.E. River Forest Road
|
|
City
|
Portland
|
|
State
|
Oregon
|
|
Post code
|
97267-3513
|
|
Country
|
U.S.A.
|
|
Telephone
|
503-786-0559
|
|
Fax
|
503-786-9859
|
|
E-mail
|
taa@teleport.com
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Trexler
|
|
First name, middle name
|
Dr. Mark C.
|
|
Job title
|
President
|
|
Direct telephone
|
503-786-0559
|
|
Direct fax
|
503-786-9589
|
|
Direct e-mail
|
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
5. Description of AIJ project activities
|
Item
|
|
|
Type of Project
|
|
Sector(s)
|
Energy
|
|
Primary activity(ies)
|
Alternative energy generation (solar)
|
|
Project Location
|
|
Country
|
Sri Lanka
|
|
Exact location (city, state, region)
|
5 rural villages in Sri Lanka
|
|
Key Dates and Current Stage of Project
|
|
Project starting date (month/year)
|
January 1998
|
|
Project ending date (month/year)
|
December 2026
|
|
Project lifetime (years)
|
29
|
|
Current stage of project
|
Mutually agreed
|
|
General Project Description and Technical Data
|
|
The Sri Lanka Solar Rural Electrification Project will market solar home systems (SHS) as an
alternative to the use of kerosene lamps for lighting and use of diesel-electric charging of
lead-acid batteries for powering small home appliances. Five villages in southern Sri Lanka that
are not currently electrified, or expected to be electrified in the foreseeable future, have been
targeted as the site for the project. The project will expand on successful pilot efforts in Sri
Lanka to provide SHS demonstration and installation services, consumer financing, and technical
assistance to rural homeowners.
Each SHS consists of a 12-volt photovoltaic (PV) panel (20, 35, or 50 watt peak (Wp)), a battery
and charge controller, compact fluorescent lamps, and hardware. Typically, a 20-Wp system can power
three 8-watt compact fluorescent lights (CFLs) in addition to a radio/cassette player. A 35-Wp
system can power four 8-watt CFLs or two 11-watt CFLs in addition to a 14-inch, 12-volt DC,
black-and-white television set. A 50-Wp system provides power to the same appliances as a 35-Wp
system, but enables the system owner to operate more CFLs or watch television for longer periods.
The project team expects to install 41,200 20-Wp systems, 406,000 35-Wp systems, and 364,800 50-Wp
systems over a period of 10 years. Each SHS is expected to generate GHG benefits for 20 years.
Although installation of the SHS will displace the need for both kerosene lamps and diesel-charged
batteries in the project households, the GHG benefits generated by reducing the use of
diesel-electric charging of lead-acid batteries are not estimated in this report due to a lack of
data. To calculate GHG benefits resulting from reduced kerosene use, it is assumed that 20- and
35-Wp systems will each replace 3 kerosene lamps, and that 50-Wp systems will each replace 4
kerosene lamps. Over the project’s 29-year lifetime, the resulting GHG benefits will total an
estimated 5,684,488 t CO2.
|
6. Cost
(a) Explanation of methodology for calculating cost data
This information is not yet available.
(b) Cost data–Project development
This information is not yet available.
(c) Cost data–Project implementation
This information is not yet available.
7. Monitoring and verification of AIJ project activities and results
|
Item
|
|
|
Party(ies) that will be monitoring project activities
|
SELCO, RESCO-Asia
|
|
Party(ies) that will be externally verifying project results
|
This information is not yet available.
|
|
Date when the monitoring plan became (or will become) operational (month/year)
|
This information is not yet available.
|
|
Types of data that will be collected
|
Household kerosene consumption before and after SHS installation; number of functioning SHS each
year.
|
|
Description of Monitoring and Verification Activities and Schedule for Implementation
|
|
The monitoring provisions consist of the following: (1) development of a tracking database for SHS
in operation; (2) surveys every five years of household usage of lights, appliances, and kerosene
to identify types and amounts of fuel consumed, determine the CO2 emission coefficients
for each fuel type, and calculate CO2 emission estimates; (3) periodic field inspections
to verify sales and installation records; and (4) record keeping of payments from and income to the
investment fund. Estimates of GHG benefits will be revised based on the periodic survey results.
|
B. Governmental approval
|
Item
|
|
|
Please check one of the following.
|
This report is a first report.
or
This report is an intermediate report.
or
This report is a final report.
|
|
Please check one of the following:
|
This report is a joint report. Letter(s) of approval of this report from the designated national
authority of the other Party(ies) involved in the activity is(are) attached in Section J, Annex.
or
This report is a separate report.
|
|
Additional comments (if any):
|
|
C. Compatibility with, and supportiveness of, national economic development and socioeconomic and
environmental priorities and strategies
|
Compatibility with Economic Development and Socioeconomic and Environmental Priorities
|
|
The Sri Lankan government has initiated a southern area development program with the goal of
increasing agricultural and industrial productivity and employment in this region. This project
will help to achieve this goal because, according to the Ceylon Electricity Board (CEB), rural
areas in the region will not otherwise gain access to electrical service in the foreseeable future.
In addition, this project is compatible with the government’s and the CEB’s shared goal
of promoting energy efficiency, renewable energy, and demand-side management.
|
D. Environmental, social/cultural, and economic impacts of the AIJ project
|
Non-Greenhouse-Gas Environmental Impacts of the Project
|
|
There are several non-GHG environmental impacts that may result from this project, including 1)
reducing SO2 and particulate emissions resulting from combustion of fossil fuels to
produce electricity that powers batteries, 2) improving air quality within participating households
by significantly eliminating kerosene fumes, and 3) reducing fire hazards associated with the use
of kerosene lamps.
|
|
Social/Cultural Impacts of the Project
|
|
There are several possible social and cultural benefits of the project, including contributing to
improving literacy due to better light quality, increasing the dissemination of information via
radio and television, and stemming urban migration by improving the quality of life in rural areas.
|
|
Economic Impacts of the Project
|
|
This project may have several economic impacts, including increasing productivity in the region by
extending the workday into the evening hours; conserving foreign exchange and causing redirection
of capital from production of new power plants to investments in health, education, economic
development, and other industry; and creating jobs in the project region in manufacturing,
technical supervision, training, management, accounting, and administration.
|
E. Greenhouse gas impacts of the AIJ project
1. Scenario description
|
Item
|
|
|
Site Designation
|
|
Site number (order of presentation in this report)
|
1 of 1
|
|
Site name/designation
|
Five rural villages in southern Sri Lanka
|
|
Project sector
|
Energy
|
|
Reference Scenario
|
|
Primary activity(ies)
|
Alternative energy generation (solar)
|
|
Has the reference scenario changed since the last report? (If yes, explain any changes below.)
|
Yes
No
This is the first project report.
|
|
In the absence of the project, the project developers assume continued consumption of kerosene for
household lighting, continued use of diesel-charged batteries, and no significant grid extension
into the targeted areas for the 29-year life of the project. The 29-year project lifetime is based
on the assumption that the deficit in Sri Lanka’s electric generating capacity is so large
that any capacity expansion is likely to serve only urban customers. Baseline GHG emissions over
the 29-year project period will result primarily from kerosene lamps, with additional emissions
resulting from diesel-based battery charging. The latter are not estimated in this report due to a
lack of sufficient data.
|
|
Predicted Project Scenario
|
|
Primary activity(ies)
|
Alternative energy generation (solar)
|
|
The project will install 812,000 SHS (one per household) in 5 villages in southern Sri Lanka over a
10-year period. Each SHS will operate for 20 years after installation. Electricity generated by the
SHS will displace 98% of kerosene used to power household lighting and an unestimated amount of
diesel fuel used to charge batteries that currently provide power for the project homes. The
lifetime of the project is 29 years.
|
|
Actual Project
|
|
Primary activity(ies)
|
Alternative energy generation (solar)
|
|
This information is not yet available.
|
2. GHG emission/sequestration calculation methodology
|
GHG Emission/Sequestration Calculation Methodology
|
|
Site number
|
1 of 1
|
|
Project sector
|
Energy
|
|
Description of Calculation Methodology for the Reference Scenario
|
|
The reference scenario is based on emissions that would occur from the combustion of kerosene in
lamps of participating households. Reference scenario emissions from diesel-based charging of
batteries are not estimated in this report due to a lack of sufficient data.
It is anticipated that SHS will be installed in 812,000 households over a 10-year period beginning
in 1998. Thus, reference scenario emissions in any given year are calculated by multiplying the
number of currently participating households by the estimated annual emissions per household. The
anticipated number of households participating each year, as dictated by the SHS installation
schedule, is as follows:
# of SHS by Type # of SHS by Type
Year 20 and 35 Wp 50 Wp Year 20 and 35 Wp 50 Wp
1998 1,200 800 2013 447,200 364,800
1999 7,200 4,800 2014 447,200 364,800
2000 18,200 13,800 2015 447,200 364,800
2001 40,200 31,800 2016 447,200 364,800
2002 73,200 58,800 2017 447,200 364,800
2003 139,200 112,800 2018 446,000 364,000
2004 216,200 175,800 2019 440,000 360,000
2005 293,200 238,800 2020 429,000 351,000
2006 370,200 301,800 2021 407,000 333,000
2007 447,200 364,800 2022 374,000 306,000
2008 447,200 364,800 2023 308,000 252,000
2009 447,200 364,800 2024 231,000 189,000
2010 447,200 364,800 2025 154,000 126,000
2011 447,200 364,800 2026 77,000 63,000
2012 447,200 364,800
Based on Solar Electric Light Fund, Inc. research, it is assumed that 20 Wp or 35 Wp SHS will
displace use of 3 kerosene lamps each, while 50 Wp SHS will replace 4 kerosene lamps. Each lamp is
assumed to consume 40.15 liters/year (l/yr) of kerosene, generating CO2 emissions at a
rate of 2.579 kilograms (kg) CO2/l of kerosene. Therefore, each lamp emits 0.10355 t
CO2/yr (= 40.15 l/yr * 2.579 kg CO2/l * 0.001 t/kg). Since baseline emissions
for a given year are based on the number of participating households in that year and given the
installation schedule provided above, annual reference scenario GHG can be derived using the
following equation:
0.10355 t CO2/lamp-yr * [# of functioning SHS * # of kerosene lamps per SHS being
replaced]
For example, in the first year of the project, it is anticipated that 1,200 SHS will be installed
that will each displace the use of 3 kerosene lamps, and that 800 SHS will be installed that will
each displace use of 4 kerosene lamps. Therefore, total reference case CO2 emissions for
Year 1 of the project are equal to 704 t CO2/year [= 0.10355 t CO2 /lamp-yr *
((1,200 * 3 lamps) + (800 * 4 lamps))].
Reference case CO2 emissions increase over the first ten years of the project as the
number of participating households increases, stay constant over the next ten years, and then
decline over the last nine years as units reach the end of their functional lifetime (estimated to
be 20 years), and households stop participating. Over the 11-year period during which all 812,000
households are expected to be participating, reference scenario emissions equal 290,023 t
CO2/yr [= (0.10355 t CO2 /yr * ((447,200 * 3) + (364,800 * 4))].
|
|
Description of Calculation Methodology for the Project Scenario
|
|
There are no GHG emissions associated with photovoltaic systems, however, it is estimated that the
SHS will be unable to displace two percent of the total consumption of kerosene, as some households
may continue to use kerosene lamps in addition to their SHS-powered lighting. Therefore, project
scenario emissions for a given year will be equal to two percent of the reference scenario
emissions for that year (see calculation above).
|
|
Description of Calculation Methodology for the Actual Project
|
|
This information is not yet available.
|
3. GHG emission/sequestration data
(a) Reporting of GHG emissions/sequestration
(b) Additional information on GHG emissions/sequestration
|
Indirect or Secondary GHG Impacts (Positive and Negative)
|
|
If this project is successful, SELCO may expand the project to the remaining parts of Sri Lanka,
which would lead to increased GHG emission savings elsewhere. Successful implementation of this
project may also set a positive example that could lead to increased worldwide use of photovoltaic
modules.
The manufacture of SHS will generate GHG emissions. These emissions have not been quantified,
however, it is estimated that emissions resulting from SHS production will be offset through
displace ment of kerosene transport-related emissions.
|
|
Factors That Could Cause the Future Loss or Reversal of GHG Benefits
|
|
Benefits realized by the operation of SHS cannot be lost or reversed in future years. However,
several factors have the potential to cause the GHG benefits of this project to be less than
expected. These factors include competition from other power supplies, continued use of kerosene
lamps in addition to the SHS-powered lights, suboptimal performance of SHS systems due to equipment
failure and inadequate system maintenance, and theft.
|
|
Strategy for Reducing the Risk of Future Loss or Reversal of GHG Benefits
|
|
The project developer anticipates that households targeted by the project are unlikely to connect
to an electric grid in the near future, as Sri Lanka is not likely to extend the grid to these
areas because of the high cost of grid extension and the rural nature of the area. In addition, it
is likely that hooking to the grid would be more expensive than purchasing and maintaining an SHS.
The following factors should ensure adequate system maintenance: system owners are likely to
maintain their SHS in order to make their capital investment in the systems worthwhile; ongoing
project oversight is planned in order to address system problems before they can seriously affect
performance; and the technician training component of the program will also promote adequate system
maintenance.
Currently, there is no strategy for reducing the risk of SHS theft or ensuring that SHS owners do
not continue to use their kerosene lamps to the same extent as before SHS installation.
|
F. Funding of the AIJ project
1. Identification of funding sources
Funding for this project has not yet been secured.
(a) Funding sources for project development
This information is not yet available.
(b) Funding sources for project implementation
This information is not yet available.
2. Assessment of additional funding needs
|
Current or Planned Activities to Obtain Additional Funding
|
|
The project developers are currently seeking funding to establish a US$230 million revolving loan
fund that would enable rural Sri Lankans to obtain loans in order to purchase SHS. Potential
sources of funding include the World Bank, multilateral development banks, and private-sector
organizations.
|
G. Contribution to capacity building and technology transfer
|
Contribution to Capacity Building and Technology Transfer
|
|
The project will transfer SHS technology to Sri Lanka and, if successful, may give momentum to
other SHS projects in the region.
|
H. Recent developments, technical difficulties, and obstacles encountered
|
Recent Project Developments
|
|
This information is not yet available.
|
|
Technical Difficulties and Other Obstacles Encountered
|
|
This information is not yet available.
|
I. Additional information
|
Additional Information
|
|
None.
|
J. Annex
1. Host country acceptance of the AIJ project
|
Country/Project Title
|
Name, Title, and Government Agency of the Designated National Authority
|
Date of Approval (day/month/year)
|
|
Sri Lanka/Solar Rural Electrification Project
|
J.G. Keerthiratne, Additional Secretary for Secretary, Ministry of Forestry & Environment
|
4 September 1997
|
2. Letters of approval of this AIJ project report
See attached letter of concurrence.
|
|