ACTIVITIES IMPLEMENTED JOINTLY(AIJ)
 
Uniform Reporting Format:

Activities Implemented Jointly Under the Pilot Phase

Annex I

List of Projects

A. Description of project

1) Title of project: Saldus (III), Energy Efficiency in Buildings

2) Participants/actors:

Item Financier/Reporter Latvian co-reporter

Name of organisation(a):

Statens energimyndighet

Vides Aizsardzîbas un Regionâlâs Attîstîbas Ministrija

Name of organisation (English):

Swedish National Energy Administration

Ministry of Environmental Protection and Regional Development of the Republic of Latvia

Department:

Division for Eastern Europe- EAES Programme

Environmental Protection Department

Acronym:

STEM

VARAM

Acronym (English):

STEM

Function within activity:

Assigned by the Swedish Government for Implementation including financing arrangements.

Assigned by the Latvian Government for activities implemented jointly

Street:

Kungsgatan 43

Peldu Str. 25

Post code:

S-117 86

LV 1494

City:

Eskilstuna

Riga

Country:

Sweden

Latvia

Telephone:

+46 16 544 20 00

+371-7 026 508

Fax:

+46 16 544 22 64

+371-7 820 442

E-mail:

klas.tennberg@stem.se

erna@varam.gov.lv

WWW-URL:

http://www.stem.se

Contact person (for this activity):

-------------------------------------

-------------------------------------

Surname:

Knutsson

Apene

First name, middle name:

Gudrun

Ingrid

Job title:

Head of Section, Climate Investment Programme

Senior official

Direct tel:

+46 16 544 20 72

+371-7 026 508

Direct fax:

+46 16 544 22 64

+371-7 820 442

Direct E-mail:

gudrun.knutsson@stem.se

erna@varam.gov.lv

Borrower

Name of organisation(a):

Saldus Pilsetas Pasvaldibas Uznemums "Saldus Siltums"

Name of organisation (English):

Saldus Town Municipal Enterprice "Saldus Siltums"

Department:

Acronym:

Acronym (English):

Function within activity:

Borrower

Street:

Maza Street 6

Post code:

LV3800

City:

Saldus

Country:

Latvia

Telephone:

+371- 38-23874

Fax:

+371-38-38063

E-mail:

WWW-URL:

Contact person (for this activity):

Surname:

Zutauts

First name, middle name:

Leons

Job title:

Director

Direct tel:

+371-38-23874

Direct fax:

+371-38-38063

Direct E-mail:

Item Please fill in if applicable Please fill in if applicable

Name of organization(a):

EKODOMA

ÅF International

Name of organization (English):

EKODOMA

Department:

AF – International, Malmö

Acronym:

ÅFI

Acronym (English):

AFI

Function within activity:

Local reporter

Technical support

Street:

Noliktavas 3-3

Stensjögatan 3

Post code:

LV 1010

S-217 65

City:

Riga

MALMÖ

Country:

LATVIA

SWEDEN

Telephone:

+371-7 323212

+46-40-37 50 00

Fax:

+371-7 323210

+46-40-13 03 69

E-mail:

ekodoma@bkc.lv

WWW-URL:

http://www.ekodoma.lv

http://www.af.se

Contact person (for this activity):

-------------------------------------

-------------------------------------

Surname:

Blumberga

Lindgren

First name, middle name:

andra

Ulf

Job title:

directress

project leader

Direct tel:

+371 7 323212

+46-40-37 50 97

Direct fax:

+372-7 323210

+46-40-13 03 69

Direct E-mail:

andra@bkc.lv

Ulf.lindgren@pdn.af

a) Organisation includes: institutions, ministries, companies, non-governmental organisations, etc. involved in the activity, i.e. research institutes associated with the project, auditors, government agency closely following the activity.

3) Activity:

Item Please fill in if applicable

General description:

Saldus, a middle-sized town in western part of Latvia, has several boiler plants and district heating networks. In one of the smaller networks new pre-insulated pipes have been installed, as a first step in connecting all net to one common network. In the school a new substation, new insulation in the attic and new smaller and better insulated windows have been installed.

Type of project:a)

Energy saving project

Location (exact, e.g. city, region,

state):

Saldus town

Saldus region

Latvia

Activity starting date:

July 4, 1997 (Letter of Intent)

In operation from

March 1997

Expected activity ending date:

Loan expire date 31 March 2007

Stage of activity:b)

Completed

Lifetime of activity if different from ending date:c)

Expected technical lifetime is 15 years which means that the plant is expected to be in operation till 2012.

Technical data:d)

Installation of pre-insulated pipelines, new substations with heat exchangers for both domestic hot water and heating, and refurbishment of the existing attic insulation for five buildings, the school included. The calculated energy savings is 454 MWh.

a) For example, using Intergovernmental Panel on Climate Change (IPCC) classification: energy efficiency; renewable energy; fuel switching; forest preservation, restoration or reforestation; afforestation; fugitive gas capture; industrial processes; solvents; agriculture; waste disposal or bunker fuels.

b) Circle the appropriate option.

c) Methodological work will be required to define lifetime of activities.

d) Methodological work will be required to determine for each type of activity what the minimum data requirements are.

Lifetime of activity

Heat production plants (bio fuel)

25 years

New installation of all main equipment parts (fuel handling system, firing equipment and boiler) and modernisation of secondary equipment.

15 years

Conversion of existing boiler but new installation fuel handling system and firing equipment. Modernisation of secondary equipment.

10 years

Limited installation of new equipment (only one part of the three main parts, normally the firing equipment). Modernisation of other equipment.

Heat distribution systems and sub-stations

25 years

Pre-fabricated pipes and installations using certified contractors and supervisor according to EN norms and applicable district heating practise

15 years

Pre-fabricated pipes and installations without using certified contractors and supervisor

10 years

Modernisation of existing pipes.

Energy efficiency in buildings

25 years

Additional insulation roofs walls etc. with Scandinavian technology.

New installed heating systems.

15 years

Renovation and balancing of heating systems including thermostat valves.

10 years

Weather stripping windows, doors etc.

* if a combination of measures is done a reasonable lifetime for the project have to be calculated.

  1. Cost (to the extent possible):

To the investment costs are referred the cost of the investment proper and the accumulated interest during the grace period, generally 2 years.

The AIJ/JI cost items are the costs for:

  • Technical assistance, a technical and administrative support from consultants, during the period from definition of the project till commissioning. These costs are paid by STEM.
  • Follow-up, an annual technical and economic follow-up by consultants, hired by STEM, of the operating results of the plant with the objective to improve on its techno-economic sustainability and its climate effect. The cost indicated is an average cost per project.
  • Reporting costs – i e costs in connection with the annual reporting of the project’s climate effects to UNFCCC. The cost indicated is an average cost per project.
  • Administration –Costs for seminars, handbooks, education (capacity building) and average costs of STEM staff per project.
  • Difference in interest rates. STEM applies for its loans generally an interest rate corresponding to 6-month STIBOR (Stockholm InterBank Rate, in April 1999 3,0 %). Assuming a normal lending rate of 7 % means that this loan is associated with a cost of 4 % in relation to normal lending rate.

Investment/instalment = the borrower’s possible own financing of the investment, followed by the borrower’s repayment of the loan.

All costs in USD

Country

Saldus lll DH

1997 1998 1999 2000
0 1 2 3

Investment

1. Loan/debt to STEM

200000 206213 197394 172935

2. Added costs

0 6213 4340 1860

3.Technical assistance

26000 0 0 0

AIJ/JI

4. Follow up

0 2000 2267 2139

A. Sweden

Costs

5. Reporting costs

0 0 744 301

6. Administration

31000 0 0 0

7. Difference in interest

4% 8249 7896 6917

8.Accum. costs for AIJ/JI

57000 67249 78155 87513

9.Total costs

257000 273462 275549 260448

Investment

1. Investment/amortization

0 0 13160 26319

Latvia

AIJ/JI

2. Reporting costs

0 0 0 0

3. Other osts

0 0 0 0

Costs

4. Accum. costs for AIJ/JI

0 0 0 0

5. Total costs

0 0 13160 39479

1 USD=

10

SEK

5) Mutually agreed assessment procedures:

Describe the procedures, including name of organisations involveda):

It is stated in agreement between STEM and Ministry of Environmental Protection and Regional Development of the Republic of Latvia that local organisation in Latvia, company EKODOMA is assigned for the data collection and evaluation of the climate effects of this project. After an initial work in cooperation with STEM’s assigned consultant, this local organisation would take the main responsibility the continued measuring for JI-reporting.

a) Please ensure that detailed contact information for all organizations mentioned is reported under

section A.2 above.

B. Governmental acceptance, approval or endorsement

Bearing in mind that all activities implemented jointly under this pilot phase require prior acceptance, approval or endorsement by the Governments of the Parties participating in these activities, which shall be shown as follows:

(a) In the case of joint reporting, the report is submitted by the designated national authority of one participating Party with the concurrence of all other participating Parties as evidenced by attached letters issued by the relevant national authorities;

(b) In the case of separate reporting, the reports are submitted separately by the designated national authority of each and every participating Party. Information will only be compiled once reports have been received from all participating Parties.

1) For the activity:

  • * Subsequent reports:

First report.

2) This report is a joint report:

  • Yes, Endorsment letter was submitted 1997.

3) General short comment by the government(s) if applicable:

Yes, Agreement with Latvian Ministry of Environmental Protection and Regional

Development was signed on March 1999.

cf. Annex II, section B

C. Compatibility with and supportiveness of national economic development and socio economic and environment priorities and strategies

Describe (to the extent possible) how the activity is compatible with and supportive of national economic development and socio economic and environment priorities and strategies

The Swedish side considers that the project meets the following objectives in the Latvian Energy Law:

- efficient use of energy resources;

  • creation and usage of energy efficient technologies, fuel/energy consuming and diagnostic equipment, construction and insulation materials; energy flow metering and control devices, automated energy consumption control systems;

Latvia became a Party of the United nations Framework Convention on Climate Change (UN FCCC) in 1992.

In accordance with Kyoto Protocol to the UN FCCC on 10 December 1997, Latvia individually orjointly should ensure, that its aggregate anthropogenic CO2 equivalent emissions of CO2, CH4, N2O, HFCs, PFCs and SF6 in 2008 - 2012 should be 8% below the 1990 level.

D. Benefits derived from the activities implemented jointly project

Whenever possible, quantitative information should be provided. Failing that, a qualitative description should be given. If quantitative information becomes available, it could be submitted using the update(s). (If the amount of quantitative information is too large, the source could be indicated.)

Item Please fill in

Describe environmental benefits in detail:

Annual emission reductions compared with the baseline scenario:

150 ton CO2

2.4 ton SO2

0.3 ton NOx

Do quantitative data exist for evaluation of environmental benefits?

Yes.

Collected by EKODOMA

Describe social/cultural benefits in detail:

Improved working conditions, increased motivation.

Better indoor climate in the buildings.

Improved supply of domestic hot water to inhabitants.

Do quantitative data exist for evaluation of social benefits?

No.

Describe economic benefits in detail:

Decreased energy losses.

Do quantitative data exist for evaluation of economic benefits?

Yes.

Collected by EKODOMA

E. Calculation of the contribution of activities implemented jointly projects that bring about real, measurable and long-term environmental benefits related to the mitigation of climate change that would not have occurred in the absence of such activities

1) Estimated emissions without the activity (project baseline):

Present data reflect emission reductions using status quo (emissions in the period before the conversion to renewable fuel) for the baseline case. Calculations, according to the top-down method, for emissions from different types of projects in the baseline case are being made. The changed calculation method will result in a change in emission reduction. The new data will be introduced as soon as available.

  1. Estimated emissions with the activity:

Description of the scenario, including methodologies applied:

Emission reductions are calculated using the IPCC Guidelines, using the Carbon Emission Factor (CEF) for different types of fuel, using actual system efficiency. For boiler conversion, the decrease in emissions is calculated in relation to the amount of fossil fuel replaced (status quo). For an energy efficiency project the decrease in emissions reflects the amount of fuel that is saved through the project. In the case that the system uses renewable fuels, the reduction is calculated comparing the

amount of fossil fuels that was used before the conversion to renewable fuels.

Fill in the following tables as applicable:

Summary table: Projected emission reductions:

GHG

Year 1

=1997

Year 2

=1998

Year 3

=1999

Year 4

=2000

...

Year 15

Energy savings at plant based upon the baseline MWh/year)

270

545

545

545

545

A) Project baseline scenario

CO2

75

150

150

150

150

CH4

N2O

other

B) Project activity scenarioa)

CO2

0

0

0

0

0

CH4

N2O