1) Title of project:

Baisiogala Boiler Conversion

2) Participants/actors:

Item Financier/Reporter Co-reporter

Name of organisation(a):

Statens energimyndighet

Aplinkos Ministerija

Name of organisation (English):

Swedish National Energy Administration

Ministry of Environment

Department:

Secretariat for Climate Policy and International Co-operation

Environmental Quality Department

Acronym:

STEM

AM

Acronym (English):

STEM

MoE

Function within activity:

Assigned by the Swedish Government for implementation including financing arrangements.

Assigned by the Lithuanian Government for activities implemented jointly

Street:

Kungsgatan 43

Jakšto 4

Post code:

BOX 310, S-631 04

LT-2600

City:

Eskilstuna

Vilnius

Country:

Sweden

Lithuania

Telephone:

+46-16 544 20 00

+370-2 61 90 49

Fax:

+46-16 544 22 64

+370-2-22 08 47

E-mail:

klas.tennberg@stem.se

atm@nt.gamta.lt

WWW-URL:

http://www.stem.se

http://www.gamta.lt

Contact person (for this activity):

-------------------------------------

-------------------------------------

Surname:

Knutsson

Bilkis

First name, middle name:

Gudrun

Mindaugas

Job title:

Head of Section, Climate Investment Programme

Director of Environmental Quality Dept.

Direct tel:

+46-16 544 20 72

+370-2-61 90 49

Direct fax:

+46-16 544 22 64

+370-2-22 08 47

Direct E-mail:

gudrun.knutsson@stem.se

atm@nt.gamta.lt

Borrower

Name of organisation(a):

UAB "Pakirsinio Komunalinis Ukis"

Name of organisation (English):

Joint Stock Company "Pakirsinio Komunalinis Ukis"

Department:

Acronym:

Acronym (English):

Function within activity:

Borrower

Street:

-

Post code:

5120

City:

Radviliskio district, Pakirsinio village

Country:

Lithuania

Telephone:

+370 92 44 584

Fax:

-

E-mail:

-

WWW-URL:

-

Contact person (for this activity):

Surname:

VALBA

First name, middle name:

EDMUNDAS

Job title:

Director

Direct tel:

+370 92 44 584

Mobile tel:

+370 85 27 778

Direct fax:

-

Direct E-mail:

-

Item Please fill in if applicable Please fill in if applicable

Name of organization(a):

Lietuvos energetikos institutes

ÅF Energikonsult Syd AB

Name of organization (English):

Lithuanian Energy Institute

Department:

Heat-Equipment Research and Testing Laboratory

ÅF - International AB

Acronym:

LEI

ÅFE

Acronym (English):

LEI

AFE

Function within activity:

Local reporter

Responsible for the measuring and collecting results for EAES-reporting.

Technical support

Street:

Breslaujos 3

Stensjögatan 3

Post code:

LT 3035

S-217 65

City:

Kaunas

MALMÖ

Country:

Lithuania

SWEDEN

Telephone:

+ 370 (7) 45 34 95, 40 18 63

+46-40-37 50 00

Fax:

+ 370 (7) 35 12 71

+46-40-13 03 69

E-mail:

testlab@isag.lei.lt

WWW-URL:

http://www.lei.lt

http://www.af.se

Contact person (for this activity):

-------------------------------------

-------------------------------------

Surname:

Pedisius

Mårtensson

First name, middle name:

Nerijus

Roland

Job title:

Senior Research Associate

project leader

Direct tel:

+ 370 (7) 40 18 64

+46-40-37 51 04

Direct fax:

+ 370 (7) 35 12 71

+46-40-13 03 69

Direct E-mail:

nerijus@isag.lei.lt

rmn@ens.af.se

a) Organisation includes: institutions, ministries, companies, non-governmental organisations, etc. involved in the activity, i.e. research institutes associated with the project, auditors, government agency closely following the activity.

3) Activity:

Item Please fill in if applicable

General description:

Pakirsinis is a small village in the middle of Lithuania. In boiler plant with an annual production about 12 000 MWh, there were two coal-fired DKVR 4-13 boilers.

Type of project:a)

Fuel switching to renewable

Location (exact, e.g. city, region, state):

Pakirsinis

Radviliskis Region

LITHUANIA

Activity starting date:

1995-03-22(Letter of Intent)

In operation from:

December 1995

Expected activity ending date:

30. September 2005

Stage of activity:b)

Complete

Lifetime of activity if different from ending date:c)

Expected technical lifetime is 15 years which means that the plant is expected to be in operation till 2009.

Technical data:d)

Conversion of a DKVR 4-13 coal-fired boiler. The output power after conversion is estimated at 3 MW and an annual heat production of around 12 000 MWh

a) For example, using Intergovernmental Panel on Climate Change (IPCC) classification: energy efficiency; renewable energy; fuel switching; forest preservation, restoration or reforestation; afforestation; fugitive gas capture; industrial processes; solvents; agriculture; waste disposal or bunker fuels.

b) Circle the appropriate option.

c) Methodological work will be required to define lifetime of activities.

d) Methodological work will be required to determine for each type of activity what the minimum data requirements are.

Lifetime of activity

Heat production plants (bio fuel)

25 years

New installation of all main equipment parts (fuel handling system, firing equipment and boiler) and modernisation of secondary equipment.

15 years

Conversion of existing boiler but new installation fuel handling system and firing equipment. Modernisation of secondary equipment.

10 years

Limited installation of new equipment (only one part of the three main parts, normally the firing equipment). Modernisation of other equipment.

Heat distribution systems and sub-stations

25 years

Pre-fabricated pipes and installations using certified contractors and supervisor according to EN norms and applicable district heating practise

15 years

Pre-fabricated pipes and installations without using certified contractors and supervisor

10 years

Modernisation of existing pipes.

Energy efficiency in buildings

25 years

Additional insulation roofs walls etc. with Scandinavian technology.

New installed heating systems.

15 years

Renovation and balancing of heating systems including thermostat valves.

10 years

Weather stripping windows, doors etc.

  • If a combination of measures is done a reasonable lifetime for the project have to be calculated.

4) Plant cost (to the extent possible):

To the investment costs are referred the cost of the investment proper and the accumulated interest during the grace period, generally 2 years.

The AIJ/JI cost items are the costs for:

  • Technical assistance, a technical and administrative support from consultants, during the period from definition of the project till commissioning. These costs are paid by STEM.
  • Follow-up, an annual technical and economic follow-up by consultants, hired by STEM, of the operating results of the plant with the objective to improve on its techno-economic sustainability and its climate effect. The cost indicated is an average cost per project.
  • Reporting costs – i.e. costs in connection with the annual reporting of the project’s climate effects to UNFCCC. The cost indicated is an average cost per project.
  • Administration – average costs of STEM staff per project.
  • Difference in interest rates. STEM applies for its loans generally an interest rate corresponding to 6-month STIBOR (Stockholm InterBank Rate, in April 1999 3,0 %). Assuming a normal lending rate of 7 % means that this loan is associated with a cost of 4 % in relation to normal lending rate.

Investment/instalment = the borrower’s possible own financing of the investment, followed by the borrower’s repayment of the loan.

All costs in USD

Country

Baisogala

1995 1996 1997 1998 1999 2000
0 1 2 3 4 5

Investment


Ready for some Climate Change News?

Visit the
NEWSROOM