ACTIVITIES IMPLEMENTED JOINTLY(AIJ)
List of Projects
Uniform Reporting Format:
Activities Implemented Jointly Under the Pilot Phase
UNIFORM REPORTING FORMAT:
ACTIVITIES IMPLEMENTED JOINTLY UNDER THE PILOT PHASE
The uniform reporting format contained below is to be used in reporting on activities implemented jointly under the
pilot phase. It is noted that the reporting should be consistent with decision 5/CP.1 and 8/CP.2 (reproduced in
annexes I and II to this reporting format). The SBSTA notes that the uniform reporting format could possibly
require revision in the light of experience gained and methodological work conducted under the pilot phase.
A. Description of project
A. 1) Title of project: Eastern Indonesia Hybrid Energy Project
A. 2) Participants/actors:
Please fill in one table for each participant/actor. For individuals fill in as from item A Function within
activity".
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Advanced Energy Systems Limited
|
|
Department:
|
|
|
Acronym:
|
AES
|
|
Function within activity:
|
Project Implementation
|
|
Street:
|
11 Brodie Hall Drive, Technology Park
|
|
City:
|
Bentley WA 6102
|
|
Country:
|
Australia
|
|
Telephone:
|
61-8-9470 4633
|
|
Fax:
|
61-8-9470 4504
|
|
E-mail:
|
------------
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
------------
|
|
Surname:
|
Phillips
|
|
First name, middle name:
|
Stephen J.
|
|
Job title:
|
Managing Director
|
|
Direct tel:
|
-------------
|
|
Direct fax:
|
-------------
|
|
Direct E-mail:
|
-------------
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
International Greenhouse Partnerships Office
|
|
Department:
|
Industry , Science and Resources
|
|
Acronym:
|
IGP Office/ISR
|
|
Function within activity:
|
Government AIJ/CDM administration
|
|
Street:
|
GPO Box 9839
|
|
Post code:
|
2601
|
|
City:
|
Canberra
|
|
Country:
|
Australia
|
|
Telephone:
|
61-2-6213 7891
|
|
Fax:
|
61-2-6213 7903
|
|
E-mail:
|
igp.australia@isr.gov.au
|
|
WWW-URL:
|
http://www.isr.gov.au/resources/energy_greenhouse/igp
|
|
Contact person (for this activity):
|
-------------------------------
|
|
Surname:
|
Stevens
|
|
First name, middle name:
|
Mark R.
|
|
Job title:
|
Assistant Manager, International Greenhouse Partnerships Office
|
|
Direct tel:
|
61-2-6213 7891
|
|
Direct fax:
|
61-2-6213 7903
|
|
Direct E-mail:
|
mark.stevens@isr.gov.au
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Export Finance and Insurance Corporation
|
|
Department:
|
Structured Trade & Project Finance
|
|
Acronym:
|
EFIC
|
|
Function within activity:
|
Project Finance
|
|
Street:
|
Export House, 22 Pitt Street
|
|
Post code:
|
2000
|
|
City:
|
Sydney NSW
|
|
Country:
|
Australia
|
|
Telephone:
|
61-2-9201 2111
|
|
Fax:
|
-----------------
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-----------------
|
|
Surname:
|
Howie
|
|
First name, middle name:
|
Nancy
|
|
Job title:
|
Senior Manager
|
|
Direct tel:
|
61-2-9201 2136
|
|
Direct fax:
|
61-2-9201 2295
|
|
Direct E-mail:
|
NHowie@efic.gov.au
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Australian Agency for International Development
|
|
Department:
|
|
|
Acronym:
|
AusAID
|
|
Function within activity:
|
Project Finance
|
|
Street:
|
GPO Box 887
|
|
Post code:
|
2601
|
|
City:
|
Canberra ACT
|
|
Country:
|
Australia
|
|
Telephone:
|
-----------------
|
|
Fax:
|
-----------------
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-----------------
|
|
Surname:
|
Fleeton
|
|
First name, middle name:
|
Mark
|
|
Job title:
|
Director, Indonesia Section
|
|
Direct tel:
|
61-2-6206 4750
|
|
Direct fax:
|
61-2-6206 4242
|
|
Direct E-mail:
|
mark_fleeton@ausaid.gov.au
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
BPP Teknologi (Agency for the Assessment and Application of Technology)
|
|
Department:
|
Energy Technology Laboratory
|
|
Acronym:
|
BPPT/LSDE
|
|
Function within activity:
|
Project Implementation
|
|
Street:
|
--------------------
|
|
Post code:
|
15314
|
|
City:
|
PUSPIPTEK, Serpong, Tangerang
|
|
Country:
|
Indonesia
|
|
Telephone:
|
62-21-7560550
|
|
Fax:
|
62-21-7560904
|
|
E-mail:
|
lsdemail@mimo.bppt.go.id
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
--------------------
|
|
Surname:
|
Mulyadi
|
|
First name, middle name:
|
Rachmat
|
|
Job title:
|
Head
|
|
Direct tel:
|
62-21-7560129, ext 1323, 1325
|
|
Direct fax:
|
62-21-7560904
|
|
Direct E-mail:
|
lsdemail@mimo.bppt.go.id
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Pt. Len Industri (Persero)
|
|
Department:
|
|
|
Acronym:
|
-----------------
|
|
Function within activity:
|
Project Implementation
|
|
Street:
|
Jalan Sukarno Hatta 442
|
|
Post code:
|
-----------------
|
|
City:
|
Bandung
|
|
Country:
|
Indonesia
|
|
Telephone:
|
62-22-5202682; 62-22-5202686; 62-22-5208036
|
|
Fax:
|
62-22-5202695; 62-22-5208036
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-----------------
|
|
Surname:
|
Rivai
|
|
First name, middle name:
|
Dodi H.
|
|
Job title:
|
Director, Commerce
|
|
Direct tel:
|
-----------------
|
|
Direct fax:
|
-----------------
|
|
Direct E-mail:
|
-----------------
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Indonesian Ministry of Environment
|
|
Department:
|
|
|
Acronym:
|
|
|
Function within activity:
|
Government AIJ/CDM administration
|
|
Street:
|
JL. D. I. Panjaitan Kav. 42
13410
|
|
Post code:
|
13410
|
|
City:
|
Jakarta Timur
|
|
Country:
|
Indonesia
|
|
Telephone:
|
62/21/8580111; 62/21/8518138
|
|
Fax:
|
62/21/8580111; 62/21/8518138
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
--------------------------------------------------------------
|
|
Surname:
|
Sugandhy
|
|
First name, middle name:
|
Aca
|
|
Job title:
|
Assistant Minister for Environment
|
|
Direct tel:
|
62/21/8580111; 62/21/8518138
|
|
Direct fax:
|
62/21/8580111; 62/21/8518138
|
|
Direct E-mail:
|
sugandhy@cbn.net.id
|
a) Organization includes: institutions, ministries, companies, non-governmental organizations, etc. involved in the
activity, i.e. research institutes associated with the project, auditors, government agency closely following the
activity.
A. 3) Activity:
|
Item
|
Please fill in if applicable
|
|
General description:
|
The objective of this project is to design, install, monitor and evaluate the performance of solar/diesel
hybrid power systems which are to provide electricity to 14 villages in eastern Indonesia. The systems will
be used to provide affordable electricity for lighting and basic entertainment. In total, the hybrid energy
systems will provide electricity to approximately 2,800 houses.
Rural Indonesian villages presently rely extensively on kerosene for lighting and the hybrid power supply
systems will displace kerosene use for this purpose. Although there will be some reliance on diesel fuel
for electricity production, the resultant greenhouse gas emissions will be far less that those avoided from
the displacement of kerosene use. The reduction in emissions will arise from two factors;
. an increase in the overall energy efficiency with which lighting
services are provided; and
- . reliance on solar energy to meet 50% of the electricity requirements.
|
|
Type of project:a)
|
Renewable energy/energy efficiency
|
|
Location (exact, e.g. city, region,
state):
|
South Sulawesi
|
|
Activity starting date:
|
September 1999
|
|
Expected activity ending date:
|
September 2000
|
|
Stage of activity:b)
|
in advanced planning
|
|
Lifetime of activity if different from ending date:c)
|
The hybrid systems are designed to remain in operation beyond the completion of formal monitoring and
reporting for AIJ/CDM purposes.
|
|
Technical data:d)
|
The systems will comprise an 8 kW photovoltaic array, 20 kVA inverter/charger, 86 kWh battery bank, 20 kVA
diesel generator, solar regulator, control system and distribution network for an average of 200 houses.
|
a) For example, using Intergovernmental Panel on Climate Change (IPCC) classification: energy efficiency; renewable
energy; fuel switching; forest preservation, restoration or reforestation; afforestation; fugitive gas capture;
industrial processes; solvents; agriculture; waste disposal or bunker fuels.
b) Circle the appropriate option.
c) Methodological work will be required to define lifetime of activities.
d) Methodological work will be required to determine for each type of activity what the minimum data requirements
are.
A. 4) Cost (to the extent possible):
|
Item
|
Total Cost
|
|
Cost of the project in US$:
|
4.2 million (approx)
|
|
AIJ component in US$:
|
2.8 million (approx)
|
|
US$ per avoided ton of CO2 equivalent:
|
200 (20 year economic life)
|
Describe briefly how costs are determined:
The costs include the design, planning, manufacture, installation, monitoring, testing, training of installation
staff, and commissioning of the 14 hybrid energy systems in rural villages in South Sulawesi. Each system will be
comprised of photovoltaic arrays, batteries, power conditioning/control system, diesel generator set and electrical
distribution. The figures in the table are based on a conversion rate $1Aus to $0.63 US.
The estimated saving in CO2 per year is 1046 tonnes. It has been assumed that the economic lifetime of
the project is 20 years equalling a total saving of some 20,900 tonnes. Hence that cost per tonne of CO2
is therefore $200 per tonne saved. Further information on emission savings is contained in Section E of this paper.
A. 5) Mutually agreed assessment procedures:
|
Describe the procedures, including name of organizations involved):
|
|
|
Under the contractual arrangements between AES and the project financiers, AES is required to provide
project implementation and project completion reports and provide six monthly reports on the uptake and
physical installation of the hybrid energy systems. The hybrid power supply systems also will have
communication mechanisms installed which will enable remote monitoring of the systems and associated
networks. Further details of the arrangements for operating, maintaining, and assessing the performance of
the systems are contained in Section C of this Report.
With regard to monitoring emission savings arising from the project, records of diesel fuel consumption and
the number of houses provided with electricity will be retained by the organisations responsible for
project implementation (AES, BPP Teknologi) and reported to the designated national authorities for AIJ/CDM
purposes (Indonesian Ministry of Environment, International Greenhouse Partnerships Office) on a annual
basis. The International Greenhouse Partnerships (IGP) Office will determine the extent to which greenhouse
gas emissions are reduced from the use of electricity in place of kerosene for lighting. The IGP
Office will also determine the extent to which emissions are increased by using diesel fuel to
provide a portion of the overall electricity supply. By comparing the reductions in emissions arising from
kerosene displacement and the increase in emissions from diesel fuel use, the IGP Office will determine the
overall net reduction in emissions. Further information on the determination of greenhouse
gas emissions is contained in Section E of this report .
|
a) Please ensure that detailed contact information for all organizations mentioned is reported under
section A.2 above.
B. Governmental acceptance, approval or endorsement
Bearing in mind that all activities implemented jointly under this pilot phase require prior acceptance, approval
or endorsement by the Governments of the Parties participating in these activities, which shall be shown as
follows:
(a) In the case of joint reporting, the report is submitted by the designated national authority of one
participating Party with the concurrence of all other participating Parties as evidenced by attached letters issued
by the relevant national authorities;
(b) In the case of separate reporting, the reports are submitted separately by the designated national authority of
each and every participating Party. Information will only be compiled once reports have been received from all
participating Parties.
B. 1) For the activity:
- The joint reporting on this project has been endorsed by the Indonesian Ministry of Environment, the
International Greenhouse Partnerships Office, the Export Finance and Insurance Corporation, the Australian Agency
for International Development, Advanced Energy Systems, BPP Teknologi, and Pt Len Industri.
B. 2) This report is a joint report:
- The presentation of this report and its contents are considered to be submitted as a joint report from the
Indonesian Ministry of Environment, the International Greenhouse Partnerships Office, the Export Finance and
Insurance Corporation, the Australian Agency for International Development, Advanced Energy Systems, BBP
Teknologi, and Pt Len Industri.
B. 3) General short comment by the government(s) if applicable:
C. Compatibility with and supportiveness of national economic development and socioSeconomic and environment
priorities and strategies
|
Describe (to the extent possible) how the activity is compatible with and supportive of national economic
development and socioSeconomic and environment priorities and strategies
|
|
This project has a variety of non-greenhouse benefits. Principal among these is the skill and technology
transfer associated with the design, installation and operation of the hybrid energy systems to be used in
this project.
The project will cover the training of operators on-site, the training of engineers at BPP Teknologi , the
provision of supervision of on-site installation and maintenance. A test facility will also be established
at BPP Teknologi’s Energy Technology Laboratories as part of the project to provide Indonesia with
the capability to test system components. As part of the project, a social preparation stage will be
undertaken which includes clarification of procedures to be adopted to ensure the project targets
low-income households and details of the training program for the operation and maintenance of hardware in
villages.
Within the context of the country’s sector developments, this project meets the requirements of the
Indonesian Government in a number of ways. They include expansion of the electricity services in rural
eastern Indonesia using environmentally sound technologies, the alleviation of rural poverty and the supply
of infrastructure which will enhance the economic well being of the villages.
It is envisaged that an Integrated Electricity Plan (IEP) will be implemented at the village cooperative
level (KUD) with revenue being collected through rural banks. BPP Teknologi in conjunction with appropriate
planning authorities will select villages which meet the following general criteria including future access
to state electricity utility (PLN) connection, availability of other power sources, income levels and
ability to enter into management and training/service programs. The local village KUD or another authorised
KUD will manage designated locations at which electricity will be prepaid and will also be involved in
future electricity demand and supply side management options.
In Indonesia, there are some 24 million rural households without electricity. The provision of electricity
to these households is a major priority for the Indonesian Government. In recent years some 800,000
households have been provided with a new electricity supply each year, primarily by being connected into a
centralised electricity grid.
A recent World Bank-funded study into solar-based rural electrification concluded that such systems could
be an economically viable option for up to 25-40% of non-electrified households (ie. 6-10 million houses).
Renewable energy technology typically has significantly less impact on the environment, both at a local and
global level, than conventional energy sources (eg. coal, oil). By increasing the use of renewable energy
where it is economically viable, the project will contribute to the twin goals of sustainable development
and economic growth, particularly in the less economically endowed rural regions of Indonesia.
Sensible application of renewable energy systems to meet Indonesia’s economic development objectives
is important for other reasons. Indonesia’s move away from being an oil dependent economy to one
based on value-added manufacture exports has set in motion an energy-dependent growth path. Estimates
reveal that the growth in domestic energy demand averaged around 7% throughout the 1980s but will increase
3-fold in the 1990s and 14-fold by the year 2020. This economic growth will be fuelled by rapid industrial
output producing unprecedented levels of urban and industrial pollution placing a great strain on
Indonesia’s human and natural environments. The importance of renewable energy technologies is
highlighted by the Indonesian Government as an important aspect of Indonesia’s sustainable
development.
|
D. Benefits derived from the activities implemented jointly project
Whenever possible, quantitative information should be provided. Failing that, a qualitative description should be
given. If quantitative information becomes available, it could be submitted using the update(s). (If the amount of
quantitative information is too large, the source could be indicated.)
|
Item
|
Please fill in
|
|
Describe environmental benefits in detail:
|
The adoption of this program is aimed at reducing electricity consumption, consequently avoiding the
consumption of diesel fuel which is used to generate the electricity. The resultant reduction in diesel
fuel consumption will have positive global environmental benefit through a reduction in emissions of
greenhouse gases. There will also be local environmental benefits from a reduction in the use of diesel
including a reduction in local air pollution and a reduced risk of spillage of diesel fuel, which could
potentially have a major adverse impact in an environmentally sensitive environment (eg. coral reefs).
|
|
Do quantitative data exist for evaluation of environmental benefits?
|
Yes
|
|
Describe social/cultural benefits in detail:
|
The project will have positive social benefits through the increase in local employment to service hybrid
energy systems. The project will also have a positive impact on the balance of payments of Indonesia by
reducing the domestic demand for petroleum products (diesel) and enabling Indonesia to remain an exporter
of crude oil. There are good prospects for attaining a high local content from the use of hybrid energy
systems. Even in this initial project, Indonesian content will be in excess of 45%.
|
|
Do quantitative data exist for evaluation of social benefits?
|
No
|
|
Describe economic benefits in detail:
|
The hybrid energy project will reduce costs of providing a 24-hour/day electricity supply to rural areas of
Indonesia. The provision of a 24-hour/day electricity supply at relatively low marginal cost opens up the
prospects for village-based industry.
|
|
Do quantitative data exist for evaluation of economic benefits?
|
Information gathered from this project will enable an assessment to be made of the costs and benefits of
hybrid energy systems.
|
E. Calculation of the contribution of activities implemented jointly projects that bring about real, measurable
and long-term environmental benefits related to the mitigation of climate change that would not have occurred in
the absence of such activities
E. 1) Estimated emissions without the activity (project baseline):
Description of the baseline or reference scenario, including methodologies applied:
In rural villages in Indonesia, there is extensive use of kerosene for lighting. World Bank reports indicate that
daily kerosene use for lighting averages approximately 0.5 litre/household. This assumption is adopted in the AIJ
rural electrification project in Indonesia being funded by electricity utilities from G-7 countries.
Based on this assumption, the total amount of kerosene which will be saved annually by each household is 182.5
litres. The combined savings of all the 2,800 houses will be approximately 511,000 litres each year.
Based on the IPCC report entitled "Revised 1996 IPCC Guidelines for National Greenhouse Gas Inventories",
there are some 2.63 kilograms of carbon dioxide produced through the combustion of 1 litre of kerosene. On this
basis, it is estimated that savings in kerosene will reduce annual carbon dioxide emissions by approximately 1,344
tonnes.
E. 2) Estimated emissions with the activity:
Description of the scenario, including methodologies applied:
The hybrid energy systems will partially rely on diesel fuel to generate electricity for the villages, particularly
during days when there is little sunshine. Based on simulations using the RAPSIM computer model developed by the
Murdoch University Energy Research Institute (MUERI), Advanced Energy Systems estimates that the systems will each
consume approximately 7,856 litres of diesel annually. On this basis, the total amount of diesel consumed by the 14
hybrid systems annually will be approximately 110,000 litres.
Based on the above IPCC report, the combustion of 1 litre of diesel produces approximately 2.71 kilograms of carbon
dioxide. On these figures, the diesel fuel related emissions from the 14 hybrid systems will be approximately 298
tonnes per year.
In summary, the net annual savings in carbon dioxide emissions are estimated to be approximately 1046 tonnes. To
validate and/or refine these estimates, the diesel fuel consumption of the hybrid energy systems will be monitored.
Further information on the monitoring procedure is contained in Section A5 of this report.
E.2.1) Summary table: Projected emission reductions:
|
GHG
|
Over Project Year
|
|
A) Project baseline scenario
|
CO2
|
1344 tonnes
|
|
B) Project activity scenarioa)
|
CO2
|
298 tonnes
|
|
C) Effect ( B-A )
|
CO2
|
1046 tonnes
|
|
D) Cumulative effect
|
CO2
|
|
a) Includes indirect GHG leakages.
F. Bearing in mind that the financing of activities implemented jointly shall be additional to financial
obligations of Parties included in Annex II to the Convention within the framework of the financial mechanism as
well as to current official development assistance flows, please indicate
|
Source of project funding
(For each source one line)
|
Amount
(US dollars)
|
|
Export Finance and Insurance Corporation
|
$2.8 million
|
|
Australian Agency for International Development
|
$1.4 million
|
G. Contribution to capacity building, transfer of environmentally sound technologies and know-how to other
Parties, particularly developing country Parties, to enable them to implement the provisions of the Convention. In
this process, the developed country Parties shall support the development and enhancement of endogenous capacities
and technologies of developing country Parties
As noted under Sections C and D of this report, the project will contribute significantly to capacity building and
in the transfer of environmentally sound technologies and know-how to the developing country Parties involved in
the project.
H. Additional comments, if any, including any practical experience gained or technical difficulties, effects,
impacts or other obstacles encountered
Annex I
EXTRACT FROM:
FCCC/CP/1995/7/Add.1:
REPORT OF THE CONFERENCE OF THE PARTIES
ON ITS FIRST SESSION, HELD AT BERLIN FROM 28 MARCH TO 7 APRIL 1995
Addendum
PART TWO: ACTION TAKEN BY THE CONFERENCE OF THE PARTIES
AT ITS FIRST SESSION
Decision 5/CP.1
Activities implemented jointly under the pilot phase
The Conference of the Parties,
Recalling that, in accordance with Article 4.2(d) of the United Nations Framework Convention on Climate Change, the
Conference is required to take decisions regarding criteria for joint implementation as indicated in Article
4.2(a),
Noting that the largest share of historical and current global emissions of greenhouse gases has originated in
developed countries, that per capita emissions in developing countries are still relatively low and that the share
of global emissions originating in developing countries will grow to meet their social and development needs,
Acknowledging that the global nature of climate change calls for the widest possible co-operation by all countries
and their participation in an effective and appropriate international response, in accordance with their common but
differentiated responsibilities and respective capabilities and their social and economic conditions,
Recognizing that,
(a) According to the provisions of the Convention, the commitments under
Article 4.2(a) to adopt national policies and to take corresponding measures on the mitigation of climate change
apply only to Parties included in Annex I to the Convention (Annex I Parties), and that Parties not included in
Annex I to the Convention (non-Annex I Parties) have no such commitments,
(b) Activities implemented jointly between Annex I Parties and non-Annex I Parties will not be seen as fulfilment
of current commitments of Annex I Parties under Article 4.2(b) of the Convention; but they could contribute to the
achievement of the objective of the Convention and to the fulfilment of commitments of Annex II Parties under
Article 4.5 of the Convention,
(c) Activities implemented jointly under the Convention are supplemental, and should only be treated as a
subsidiary means of achieving the objective of the Convention,
(d) Activities implemented jointly in no way modify the commitments of each Party under the Convention,
1. Decides:
(a) To establish a pilot phase for activities implemented jointly among Annex I Parties and, on a voluntary basis,
with non-Annex I Parties that so request;
(b) That activities implemented jointly should be compatible with and supportive
of national environment and development priorities and strategies, contribute to
cost-effectiveness in achieving global benefits and could be conducted in a comprehensive manner covering all
relevant sources, sinks and reservoirs of greenhouse gases;
(c) That all activities implemented jointly under this pilot phase require prior acceptance, approval or
endorsement by the Governments of the Parties participating in these activities;
(d) That activities implemented jointly should bring about real, measurable and long-term environmental benefits
related to the mitigation of climate change that would not have occurred in the absence of such activities;
(e) That the financing of activities implemented jointly shall be additional to the financial obligations of
Parties included in Annex II to the Convention within the framework of the financial mechanism as well as to
current official development assistance (ODA) flows;
(f) That no credits shall accrue to any Party as a result of greenhouse gas emissions reduced or sequestered during
the pilot phase from activities implemented jointly;
2. Further decides that during the pilot phase:
(a) The Subsidiary Body for Scientific and Technological Advice will, in coordination with the Subsidiary Body for
Implementation, establish a framework for reporting, in a transparent, well-defined and credible fashion, on the
possible global benefits and the national economic, social and environmental impacts as well as any practical
experience gained or technical difficulties encountered in activities implemented jointly under the pilot phase;
(b) The Parties involved are encouraged to report to the Conference of the Parties through the secretariat using
the framework thus established. This reporting shall be distinct from the national communications of Parties;
(c) The Subsidiary Body for Scientific and Technological Advice and the Subsidiary Body for Implementation, with
the assistance of the secretariat are requested to prepare a synthesis report for consideration by the Conference
of the Parties,
3. Further decides:
(a) That the Conference of the Parties shall, at its annual session, review the progress of the pilot phase on the
basis of the synthesis report with a view to taking appropriate decisions on the continuation of the pilot phase;
(b) In so doing, the Conference of the Parties shall take into consideration the need for a comprehensive review of
the pilot phase in order to take a conclusive decision on the pilot phase and the progression beyond that, no later
than the end of the present decade.
10th plenary meeting
7 April 1995
Annex II
EXTRACT FROM:
FCCC/CP/1996/15/Add.1:
Report of the Conference of the Parties on its second session, held at Geneva from 8 to 19 July 1996, Part two:
Action taken by the Conference of the Parties at its second session
Decision 8/CP.2
Activities implemented jointly under the pilot phase
The Conference of the Parties,
Reaffirming its decision 5/CP.1 on activities implemented jointly, whereby the Conference of the Parties is to
review the progress of the pilot phase with a view to taking appropriate decisions on its continuation,
1. Takes note of the progress report on activities implemented jointly (FCCC/CP/1996/14 and Add.1);
2. Decides to continue the pilot phase;
3. Invites Parties to report in accordance with the initial reporting framework adopted by the Subsidiary Body for
Scientific and Technological Advice at its second session (FCCC/SBSTA/1996/8, annex IV);
4. Requests the secretariat to support the work on issues relating to activities implemented jointly as agreed by
the Subsidiary Body for Implementation and the Subsidiary Body for Scientific and Technological Advice.
8th plenary meeting
19 July 1996
|