Uniform Reporting Format:
Activities Implemented Jointly Under the Pilot Phase
THE PROJECT OF JOINT IMPLEMENTATION
"Construction of the Steam-Gas Electrical Power Station "Kuban " (Novokubansky District
of Krasnodarsky region, Russian Federation) and Local Heating Systems in Krasnodarsky Region"
Krasnodar, RUSSIA 10 January 2000
List of
Projects
Customer: OOO "Yougstroyinvest Ltd." - Russia
General Director V.I. Chuiko
Investor: ANKORS Management GmbH - Germany
President Valdemar Reis
The business-plan
executor of JI Joint-Stock Company of Open Type
Project "YougORGRES" - Russia
General Director S.V.Inkov
Vice-Principal Engineer V.D.Chkira
The responsible executor O.V.Yachin
Customer: "Yougstroyinvest " Ltd. Company – Russian Federation
|
Organisation
|
|
|
The name of the organisation
|
"Yougstroyinvest" INN 8903017634
|
|
The name of the organisation (english)
|
|
|
Region
|
Yamalo-Nenezky autonomous district
Nadim, Nadimsky region
|
|
The direction of the activity
|
Building
|
|
Street
|
1. Zvereva 451
2. Krasnodarsky av. 7
|
|
Town
|
1. Nadim
2. Gulkevichi
|
|
Region
|
1. Yamalo-Nenezky
2. Krasnodarsky
|
|
Post Index
|
1. 626711
2. 352156
|
|
Country
|
Russian Federation
|
|
Phones
|
1. (34595) 67-969
2. (86160) 2-2960
|
|
Fax
|
1. (34595) 67-969
2. (86160) 2-29-60
|
|
The responsible executor
|
|
|
Surname
|
Chuiko
|
|
First name, Patronymic
|
Valery Ivanovich
|
|
Post
|
General director
|
|
Phone
|
(902) 696-28-50.
|
|
Fax
|
(86160) 2-29-60
|
|
E-mail
|
|
|
Executor
|
|
|
Surname
|
Maruchenko
|
|
First name, Patronymic
|
Natalia Nikolaevna
|
|
Post
|
Director
|
|
Phone
|
(902) 696-28-50
|
|
Fax
|
(86160) 2-29-60
|
|
E-mail
|
|
Investor: ANKORS Management GmbH - Germany
|
Organisation
|
|
|
The name of the organisation
|
ANKORS Management GmbH
|
|
The name of the organisation (english)
|
Ancors Management ¹ HRB 29242
|
|
Region
|
|
|
The direction of the activity
|
Management
|
|
Street
|
Mainhainer str. 203
|
|
Town
|
Bad Kreuznach
|
|
Region
|
Rollan Falz
|
|
Post Index
|
55543
|
|
Country
|
Germany
|
|
Phone
|
(491) 1703519588
|
|
Fax
|
(491) 6701960675
|
|
The responsible executor
|
|
|
Surname
|
Reis
|
|
First name, Patronymic
|
Valdemar
|
|
Post
|
President
|
|
Phone
|
(491) 73519588
|
|
Fax
|
|
|
E-mail
|
Ancors@gmx.de
|
|
Executor
|
|
|
Surname
|
Chelenberg
|
|
First name, Patronymic
|
Andreas
|
|
Post
|
General Director
|
|
Phone
|
(491) 1703519588
|
|
Fax
|
(491) 6701960675
|
|
E-mail
|
Ancors@gmx.de
|
1. The Brief Description of the Project
According to the classification of the Inter-Governmental Panel on Climate Change the project
"Construction of the Steam-Gas Electrical Power Station "Kuban" (Novokubansky district of
Krasnodarsky region, Russian Federation) and of the Local Heating Systems in Krasnodarsky region"
(Project) is directed to the decrease of anthropogenic impact on climate which is exhibited in reduction of
green-house gases emission as a result of the increase of the efficiency of energy resources use.
The decrease of emissions are achieved in the way of reconstruction to the present used Municipal heating
systems installing heating pumps to supply with heat houses, industrial spaces and constructions of
Krasnodarsky region foreseen by the Project.
Taking into account the deficit in supplying with electricity Krasnodarsky region and with a purpose to
provide with the electrical energy the designed local heating systems it’s planned to build up a
steam-gas electrical power station called "Kuban" in Novokubansk city of Krasnodarsky region with
the projected capacity 900 Mw in the framework of the Project realization.
The use of steam-gas cycle which has a higher rate of efficiency gives a possibility to increase the
effectiveness of use the fuel energy simultaneously reducing green-house gases emission per unit of
produced electrical energy.
Decisions stipulated by the Project allow refusing from the share of exploited municipal heating boiler
plants network and heating systems to reduce losses existing in them, and in an outcome to increase
effective use of souses of energy, and decrease green-house gases emission.
The reduction of number of staff servicing municipal heating system and boiler-houses, is compensated by
necessity of staff for periodic maintenance service of heating pumps for designing local networks.
The climatic efficiency of the Project can be reached in combination of two modern technological decisions
on this Project. It permits to reduce considerably green-house gases emissions under the condition of
provision the customers in Krasnodarsky region with heat and electrical energy.
The volume of finance of the Project is $ 1 620 000 000:
|
The schedule of financing (2000 - 2003 years)
|
|
2000 year
|
$ 162.0 million
|
|
2001 year
|
$ 618.0 million
|
|
2002 year
|
$ 470.0 million
|
|
2003 year
|
$ 370.0 million
|
|
The schedule of introduction of potencies
|
|
First turn (300 Mw)
|
2002 year
|
|
Second turn (300 Mw)
|
2003 year
|
|
Third turn (300 Mw)
|
2004 year
|
2. The calculation of green-house gases emission of boiler-houses of Krasnodar region before realization
of the Project (in ÑÎ2 equivalent)
|
Characteristics of sources
|
Factual
index
|
Expenditure of equivalent fuel,
thousand/year
|
Volume of green-house gases emission (in ÑÎ2 equivalent), million
tons/year
|
|
Municipal boiler-houses and independent (autonomous) heating systems incinerated organic fuel of
Krasnodarsky region.
|
1878
|
5 100 000
|
12.240
|
|
Total
|
1878
|
5 100 000
|
12.240
|
3. The calculation of green-house gases emission of the Project "Construction of the Steam-Gas
Electrical Power Station “Kuban” (Novokubansky District of Krasnodarsky region, Russian
Federation) and Local Heating Systems in Krasnodarsky Region” (in ÑÎ2
equivalent)
|
Characteristics of sources
|
Real indexes
in Mw
|
Expenditure of standard fuel in
thousand tons per year
|
Volume of greenhouse gases emission (in ÑÎ2 equivalent ) in million tons per
year
|
|
Municipal boiler-houses and independent (autonomous) heating systems incinerated organic fuel of
Krasnodarsky region.
|
1008
|
2 700 000
|
6.570
|
|
The Steam-Gas Electrical Power Station "Kuban "
|
900 Ìw
|
940 000
|
2.256
|
|
Total:
|
|
3 968 000
|
9.540
|
4. The reduction of greenhouse gases emission in result of realization of the Joint Implementation
Project "Construction of the Steam-Gas Electrical Power Station “Kuban ” (Novokubansky
District of Krasnodarsky region, Russian Federation) and Local Heating Systems in Krasnodarsky
Region” (in ÑÎ2 equivalent)
(in ÑÎ2 equivalent)
|
Greenhouse gases emission
|
2003.
|
2004
|
,,,,,,,,,,,,,,,,,,
|
2011
|
2012
|
|
Before the realization of the Project
Municipal boiler-houses and independent (autonomous) heating systems incinerated organic fuel of
Krasnodarsky region
|
12.24
|
12.24
|
12.24
|
12.24
|
12.24
|
|
After the realization of the Project
Municipal boiler-houses and independent (autonomous) heating systems incinerated organic fuel of
Krasnodarsky region
The Steam-Gas Electrical Power Station "Kuban"
|
6.570
2.970
|
6.570
2.970
|
6.570
2.970
|
6.570
2.970
|
6.570
2.970
|
|
Effect of reduction of greenhouse gases according to the Project
|
-2.700
|
-2.700
|
-2.700
|
-2.700
|
-2.700
|
5. Conclusion
The positive effect of the Project is concluded in the reduction of greenhouse gases emission resulting
from the exploitation at the territory of Krasnodarsky region of municipal boiler-houses and independent
(autonomous) heating systems incinerated organic fuel.
Under the conditions of putting into action of solutions proposed in the Project climatic effect in general
over Krasnodarsky region predicted according to the calculations over the Project will reach reduction of
greenhouse gases emission not less than 2 700 000.0 (two millions seven hundreds thousand tons) tons per
year (in ÑÎ2equivalent).
In the time of elaboration of the Project documentation in according the content of the Project and its
realization the climatic efficiency is going to increase, and finally it will be assessed under the
procedure of Project certification.
6. Location of Steam-Gas Electrical Power Station "Kuban"
THE PROJECT OF JOINT IMPLEMENTATION ENERGY SAVING TECHNOLOGY INTRODUCTION
IN KRASNODAR REGION
TOPHEAT GAS EMISSION REDUCTION
IN KRASNODAR REGION
STEAM-TO-GAS POWER GENERATING PLANT "KUBAN" FIXED CAPACITY 900 Ìw and
LOCAL HEAT SUPPLY STATIONS IN KRASNODAR REGION PROJECT COSTS 1.620 bln. USD
THE BEGINNING OF THE DESIGNING
AND CONSTRUCTION II QUARTER 2000
PUTTING INTO OPERATION 1 TURN – 2002
2 TURN – 2003
3 TURN – 2004