A. Description of project
-
Title of project:
The Model Project for Energy Conservation in Electric Furnace used for Ferro-Alloy Refining
Participants/actors:
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
New Energy and Industrial Technology Development Organization
|
|
Department:
|
International Cooperation Center
|
|
Acronym:
|
|
|
Acronym (English):
|
NEDO
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
1-1, 3-chome Higashi-Ikebukuro, Toshima-ku
|
|
Post code:
|
170-6028
|
|
City:
|
Tokyo
|
|
Country:
|
Japan
|
|
Telephone:
|
81-3-3987-9313
|
|
Fax:
|
81-3-5992-2290
|
|
E-mail:
|
|
|
WWW-URL:
|
http://www.nedo.go.jp
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Kigasawa
|
|
First name, middle name:
|
Takaji
|
|
Job title:
|
Director
|
|
Direct tel:
|
81-3-3987-9466
|
|
Direct fax:
|
81-3-3987-5103
|
|
Direct E-mail:
|
kigasawatkj@nedo.go.jp
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
NKK Corporation
|
|
Department:
|
Engineering Division
|
|
Acronym:
|
|
|
Acronym (English):
|
NKK
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
2-1, Suehiro-cho, Tsurumi-ku
|
|
Post code:
|
230-8611
|
|
City:
|
Yokohama
|
|
Country:
|
Japan
|
|
Telephone:
|
81-45-505-7810
|
|
Fax:
|
81-45-505-7617
|
|
E-mail:
|
|
|
WWW-URL:
|
http://www.tsurumi.nkk.co.jp
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Ishii
|
|
First name, middle name:
|
Akira
|
|
Job title:
|
Deputy General Manger
|
|
Direct tel:
|
81-45-505-7810
|
|
Direct fax:
|
81-45-505-7617
|
|
Direct E-mail:
|
ishiia@eng.tsurumi.nkk.co.jp
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
The Ministry of Science and Technology, People’s Republic of China
|
|
Department:
|
Department of Social Development
|
|
Acronym:
|
|
|
Acronym (English):
|
MOST
|
|
Function within activity:
|
|
|
Street:
|
15B Fuxing Road
|
|
Post code:
|
100862
|
|
City:
|
Beijing
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
|
|
Fax:
|
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Lu
|
|
First name, middle name:
|
Xuedu
|
|
Job title:
|
|
|
Direct tel:
|
86 10 68514054
|
|
Direct fax:
|
86 10 68512163
|
|
Direct E-mail:
|
lvxd@cs.sstc.gov.cn
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
The State Development Planning Commission
People’s Republic of China
|
|
Department:
|
Department of Raw and Processed Materials Industries and Resources Utilization
|
|
Acronym:
|
|
|
Acronym (English):
|
SDPC
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
38S Yuetan Street,
|
|
Post code:
|
100824
|
|
City:
|
Beijing
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
|
|
Fax:
|
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
|
|
First name, middle name:
|
|
|
Job title:
|
|
|
Direct tel:
|
|
|
Direct fax:
|
|
|
Direct E-mail:
|
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
The State Metallurgical Industry Bureau, People’s Republic of China
|
|
Department:
|
|
|
Acronym:
|
|
|
Acronym (English):
|
SMIB
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
46 Dongsi Xidajie
|
|
Post code:
|
100711
|
|
City:
|
Beijing
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
|
|
Fax:
|
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
|
|
First name, middle name:
|
|
|
Job title:
|
|
|
Direct tel:
|
|
|
Direct fax:
|
|
|
Direct E-mail:
|
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
Planning Committee of Liaoning Province, People’s Republic of China
|
|
Department:
|
|
|
Acronym:
|
|
|
Acronym (English):
|
PCLP
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
No.45 Beiling Street, Huanggu District
|
|
Post code:
|
110032
|
|
City:
|
Shenyang
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
|
|
Fax:
|
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
|
|
First name, middle name:
|
|
|
Job title:
|
|
|
Direct tel:
|
86-24-86892584
|
|
Direct fax:
|
86-24-86893853
|
|
Direct E-mail:
|
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
LIAOYANG FERROALLOY WORKS GROUP
|
|
Department:
|
|
|
Acronym:
|
|
|
Acronym (English):
|
LFG
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
No.21 Zhenxing Road
|
|
Post code:
|
111004
|
|
City:
|
Liaoyang, Liaoning Province
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
86-419-3306858
|
|
Fax:
|
86-419-3303264
|
|
E-mail:
|
lythj@public2.lyptt.ln.cn
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
CHEN
|
|
First name, middle name:
|
TIE GANG
|
|
Job title:
|
Director
|
|
Direct tel:
|
86-419-3306858
|
|
Direct fax:
|
86-419-3303264
|
|
Direct E-mail:
|
|
|
Item
|
Please fill in if applicable
|
|
Name of organization:
|
|
|
Name of organization (English):
|
Tsinghua University
|
|
Department:
|
Institute of Nuclear Energy Technology / Institute for Techno-Economics & Energy Systems
Analysis
|
|
Acronym:
|
|
|
Acronym (English):
|
INET/ITEESA
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
Tsinghua Yuan Street, Haidian District
|
|
Post code:
|
100084
|
|
City:
|
Beijing
|
|
Country:
|
The People’s Republic of China
|
|
Telephone:
|
86-10-6277-2752 or 86-10-6278-3655
|
|
Fax:
|
86-10-6277-1150
|
|
E-mail:
|
Liuds@tsinghua.edu.cn
|
|
WWW-URL:
|
http://www.inet.tsinghua.edu.cn
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Liu
|
|
First name, middle name:
|
Deshun
|
|
Job title:
|
Professor
|
|
Direct tel:
|
86-10-6277-2752 or 86-10-6278-3655
|
|
Direct fax:
|
86-10-6277-1150
|
|
Direct E-mail:
|
Liuds@tsinghua.edu.cn
|
3) Activity:
|
Item
|
Please fill in if applicable
|
|
General description :
|
The objective of the Project is to contribute to efficient use of energy and consequently
protection of the local environment in People’s Republic of China as well as the reduction of
CO2 emission by installing furnace cover, CO gas recovery system, and a pelletizing
plant into existing electric furnaces at Liaoyang Ferroalloy Works and disseminating the technology
in People’s Republic of China.
|
|
Type of project :
|
Energy efficiency
|
|
Location (exact, e.g. city, region,
State):
|
No.21 Zhenxing Road Liaoyang
Liaoning, 111004, The People’s Republic of China
|
|
Activity starting date:
|
September, 1998
|
|
Expected activity ending date:
|
March, 2001
|
|
Stage of activity:
|
Mutually agreed
|
|
Lifetime of activity if different from ending date:
|
20 years
|
|
Technical data:
|
Annual production of ferro-chromium at Liaoyang Ferroalloy Works is around 38,300 ton/year. After
implementing the project:
- Unit electricity consumption of the furnace is expected to be reduced by 132 kWh/ton-FeCr
- Unit coke consumption is expected to be reduced by 49 kg/ton-FeCr.
- 471 Nm3-CO/ton-FeCr is expected to be recovered as fuel, however, of which 24 Nm3 shall be
consumed as equipment heating energy.
Therefore, 447 Nm3-CO/ton-FeCr will replace boiler fuel equivalent to 5,859
ton-coal/year.
- Calorific value of the gas will be 2700kcal/Nm3.
- CO2 emission is then expected to be reduced by29,200 ton/year.
|
4) Cost (to the extent possible): (1US$=8.27RMB=120JP)
|
Item
|
1998
|
1999
|
2000
|
|
Cost of the project in US$:
|
3,750,000
|
9,525,000
|
8,623,000*
|
|
AIJ component in US$:
|
3,750,000
|
9,525,000
|
7,290,000*
|
|
US$ per avoided ton of CO2 equivalent**:
|
|
|
|
Cost of the project given above is based on the budget.
*: of which cost invested by Chinese side is 7,290,000 US$.
**: Detail analysis is given in attached sheet, CO2 Reduction Cost Analysis.
5) Mutually agreed assessment procedures:
|
Describe the procedures, including name of organizations involved :
|
|
Basic Agreement concerning the execution of this project was concluded among NEDO, SDPC, SMIB and
PCLP on September 3, 1998.
NEDO concluded with NKK CO. to trust to execute Japanese scope of this project in September 4,
1998.
NKK CO. and LFG concluded the Execution Document (ED) in which concrete specification, detail work
assignment, etc. concerning this project was clearly specified in September 16, 1998 and started
the design and engineering work of the project.
As determined in ED, LFG shall have responsibility to record data, which will be necessary for the
subsequent report such as unit electricity consumption, unit coke consumption, total amount of
recovery furnace gas , etc., for the reporting period.
LFG shall submit the report on the data listed above to MOST and NEDO through NKK after completion
of the test run for review.
After examining the data and reaching an agreement between governments, each of them submit the
subsequent report to UNFCCC, respectively.
|
B. Governmental acceptance, approval or endorsement
1) For the activity:
This report is the first report and copies of letters of endorsement by each designated national authority
of Parties are attached.
Describe:
|
The Ministry of International Trade and Industry of Japan (MITI) approved NEDO to implement this
project as Activity Implemented Jointly - Japan Program in June 17, 1998.
MOST and NEDO concluded the "Memorandum of Understanding on Cooperation in the Model Project
for Energy Conservation in Electric Furnace Used for Ferro-Alloy Refining as a project of AIJ under
the pilot phase" on September 25, 1998.
The Japanese government confirmed this project as Activity Implemented Jointly (AIJ) under pilot
phase on June 23,1999.
The Ministry of Science and Technology, People’s Republic of China (MOST) confirmed this
project as Activity Implemented Jointly (AIJ) under pilot phase on July 9, 1999.
|
2) This report is a joint report:
Yes, forward copy of agreement/endorsement by the designated national authorities involved
-
No.
3) General short comment by the government(s) if applicable:
C. Compatibility with and supportiveness of national economic development and socio-economic and
environment priorities and strategies
|
Describe (to the extent possible) how the activity is compatible with and supportive of national
economic development and socio-economic and environment priorities and strategies
|
|
As energy supply and demand issues and protection of the global environment have become the focus
of worldwide interest, NEDO has been promoting energy conservation model projects in Asian
countries including China, to contribute to the effective use of energy and improvement of
environmental pollution in the Asian countries.
In China, strong national policy for energy conservation and environmental protection has been set,
and relating laws have come into effect.
The objective of the Project is to contribute to efficient use of energy and consequently
protection of the environment in China, therefore, the activity is compatible with and supportive
of national economic development and socio-economic environment priorities and strategies.
|
D. Benefits derived from the activities implemented jointly project
|
Item
|
Please fill in
|
|
Describe environmental benefits in detail:
|
Electric power and consumption of cokes and electrode consumption will be reduced by implementing
the project. Accordingly,
- CO2 emission associated with power generation and coke combustion will be reduced.
- SO2 emission associated with power generation and reduction of cokes consumption
will be reduced. Gas recovery system equipped with series of venturi scrubbers will be installed to
remove most of the dust contained in the gas, therefore,
- Dust emission will be dramatically reduced.
|
|
Do quantitative data exist for evaluation of environmental benefits?
|
Yes, CO2 emission is evaluated to be reduced by 29,200 ton-CO2 / year.
|
|
Describe social/cultural benefits in detail:
|
Technical transferring effect to the People’s Republic of China.
- Project management method
- Management of pelletizing plant operation including pellet size control
- Management and operation of CO gas recovery system
|
|
Do quantitative data exist for evaluation of social benefits?
|
No
|
|
Describe economic benefits in detail:
|
- Electric power consumption will be reduced.
- Unit coke consumption will be reduced.
- CO gas will be recovered from the electric furnace as fuel, and can replace the fuel used for
boiler which generate steam used for TiO2production process and heating in winter.
- Raw material cost can be reduced by utilizing pellets made of fine chromium ore.
- Increase in employment for erection work is expected.
Increase in employment for operation and maintenance of the pelletizing equipment is expected.
|
|
Do quantitative data exist for evaluation of economic benefits?
|
Quantitative data exist for evaluation of economic benefits for 1, 2, 3, and 4 above.
|
E. Calculation of the contribution of activities implemented jointly projects that bring about real,
measurable and long-term environmental benefits related to the mitigation of climate change that would not
have occurred in the absence of such activities
1) Estimated emissions without the activity (project baseline):
|
Description of the baseline or reference scenario, including methodologies applied:
|
|
(Baseline)
Baseline CO2 emission can be estimated using current operation parameters, such as unit
consumption of electricity and cokes, i.e., unit consumption before the execution of the Project.
Each of current unit consumption was obtained when Japanese mission visited at Liaoyang Ferroalloy
Works in 1997 and in April 1998.
- Premise 1: The production capacity of furnaces does not change before and after the
Project.
Production capacity: 38,300 ton-FeCr / year
- Premise 2: The following unit consumption is everlasting before and after the Project. Unit
electricity consumption : 3888 kWh / ton-FeCr Unit consumption of coke: 526kg / ton-FeCr
- Premise 3: The use of coal as a fuel for the steam boiler, which generates steam for
the TiO2 production process and heating, is everlasting. And coal which is equivalent to
a calorie of recovered CO gas, is consumed as the fuel.
Recovered CO gas used for steam boiler : 471 Nm3 / ton-FeCr
Calorific figure of CO gas : 2700 kcal / Nm3
- Premise 4: Grid Electricity
Coefficient of energy conversion between electricity and primary fuel, coal, does not change for
the period of the project (20 years).
Energy intensity for electricity supply by the grid: 400 gce/kWh
?Dynamic analysis using a firm plan for grid electricity could be employed if applicable data are
given by Chinese side.
- Premise 5: Coke Production
Effect for coke production shall not be considered in this project, and shall be out of the project
boundary until the process to be made clear and defined.
Because it is necessary more energy of 600,000kcal/t-coal in coke production.
|
|
Methodology:
- Production capacity of Liaoyang Ferro-alloy Works is assumed to be 38,300 ton-FeCr per year,
and current unit consumption of electricity and cokes are estimated from the data obtained from
Liaoyang Ferroalloy Works.
- Current unit electricity consumption expressed in unit consumption is converted into equivalent
amount of coal, and cokes unit consumption is converted into equivalent amount of fixed carbon in
it.
(kWh/ton-Fe-Cr ’ ton-coal/ton-Fe-Cr, kg/ton-Fe-Cr ’ kg-carbon/ton-Fe-Cr)
- CO2 emission is calculated according to basic calculation designated by IPCC (Intergovernmental
Panel on Climate Change) Guidelines for National Greenhouse Gas Inventories : Reference
Manual/1.4.1 "Approaches For Estimating CO2 emitted."
- 4. As for fuel consumption of the existing boiler, boiler fuel which will be replaced by the
recovered CO gas after the completion of the Project, shall be counted in this baseline so that
energy saving by the recovered gas can be estimated. (Recovery gas is expected to produce steam of
seven tons per hour in spite of the existing boiler’s capacity of 10 tons per hour.)
|
|
(Calculation)
- Estimate electricity consumption, and cokes by fuel product type.
- Convert the fuel data into equivalent amount of coal.
- Select carbon emission factors for each fuel product type and estimate the total carbon content
of the fuels.
- Converting emissions as carbon to full molecular weight of CO2.
Namely,
i. Annual consumption of fossil fuel (coal basis) "a" is derived by using actual average
data on unit electricity consumption, cokes unit consumption of the furnace, and estimation of
utilizing recovery CO gas for a boiler.
- "a" × Carbon Emission Factor (CEF) = "b"
- "b" × Fraction of Carbon Oxidized = "c"
- The amount of carbon stored in products for long period of time is estimated to be 2834 ton per
year as fixed carbon, i.e. unit consumption of 74.0 kg/t .
- "c" × Ratio of Molecular Weight of CO2 and C = "c" ×
44/12
- The result obtained above gives annual CO2 emission from the furnace
|
|
(Results)
1) Conversion from electricity to coal:
a1 = 38,300 ton-FeCr/y x 3888 kWh/ton-FeCr x 400 gce/kWh / 1,000,000
= 59,564 ton-coal/year
Accordingly, annual CO2 emission is estimated as follows:
CO2 emission (ton/year)= £a (Energy Conservation ,ton-coal/year)
x Carbon Emission Factor (0.726kg-carbon/kg-coal)
x Fraction of Carbon Oxidized (0.98 IPCC Table I-6)
x 44 / 12 (CO2 /C ratio)
=59,564× 0.726 × 0.98 × 44/12 = 155,400 ton/year
Conversion from cokes to CO2 :
a2 = 38,300 ton-FeCr/y x 526 kg-Coke/t-FeCr /1,000
= 20,146 ton-coke/year
Where, fixed carbon rate in coke = 83%; therefore,
a2(CO2 )= CO2 emission (ton/year)= 20,146 ton-coke/year x 0.83 x 44/12
= 61,300 ton/year
3) Conversion fuel gas for boiler:
Amount shall be equivalent to recovery CO gas for the use of boiler.
Unit gas production of 635 Nm3-CO/ton-FeCr is expected by closed furnace, on the other hand 164
Nm3-CO/ton-FeCr to be consumed for pellet hardening, and 24 Nm3-CO/t-FeCr for equipment warming by
using generated steam.
Therefore, the balance shall be saved as coal;
a3= 38,300 ton-FeCr/y x (635 - 164- 24) Nm3-CO/ton-FeCr x 0.385kgce/CO-Nm3
/1,000 x 80%/75% = 7,030 ton-coal/year
Where, 80%/75% means heat efficiency, 80% is for Liaoyang Ferro-Alloy Group’s boiler and 75%
is for Liaoyang City Heat Shop’s boiler.
Accordingly, annual CO2 emission is estimated as follows:
CO2 emission (ton/year)=7,030 ton-coal/year x 0.726 x 0.98 x 44/12 = 18,300
Total £a (CO2)= 155,400 + 61,300 + 18,300 = 235,000 ton/ year
|
2) Estimated emissions with the activity:
|
Description of the scenario, including methodologies applied:
|
|
(Concept)
By installing furnace cover, CO gas recovery system and a pelletizing plant, unit electricity
consumption of the furnace is expected to be reduced from 3,888 kWh/ton-FeCr to 3,596 kWh/ton-FeCr,
however, additional equipment, mainly palletizing equipment and utility supply facilities, consumes
about 160 kWh/ton-FeCr. Therefore, 132 kWh/ton-FeCr of electricity unit consumption is expected to
be reduced for every ton of ferro-chromium production.
With CO gas recovery system, 635 Nm3 of CO gas will be recovered for every ton of
ferro-chromium production. Out of 635 Nm3 of CO gas, 164 Nm3 will be used for
Annular Kiln and 471 Nm3 can be used for the boiler. Then, steam of 0.9 ton/t-FeCr out
of generated steam is consumed for equipment heating during five (5) months in winter season, which
is converted into CO gas of 24 Nm3/t-FeCr.
Those reduction in electricity consumption, recovery of CO gas, and reduction of cokes consumption
lead to reduction of CO2 .
|
:
|
|
(Calculation)
Methodology: the same as baseline CO2 emission calculation.
|
|
|
(Results)
1) Conversion from electricity to coal:
a1 = 38,300 ton-FeCr/y x 3756/ton-FeCr x 400 gce/kWh / 1,000,000
= 57,540 ton-coal/year
Accordingly, annual CO2 emission is estimated as follows:
a1(CO2) =a1 (Energy Conservation ,ton-coal/year)
x Carbon Emission Factor (0.726kg-carbon/kg-coal)
x Fraction of Carbon Oxidized (0.99 IPCC Table I-6)
x 44 / 12 (CO2/C ratio)
= 57,540 x 0.726 x 0.98 x 44/12 = 150,100 ton-CO2 /year
- Conversion from cokes to CO2:
a2 = 38,300 ton-FeCr/y x 477 kg-Coke/t-FeCr /1,000
= 18,300 ton-coke/year
Where, fixed carbon rate in coke = 83%; therefore,
a2(CO2)= CO2 emission (ton/year)= 18,300 ton-coke/year x 0.83 x 44/12
= 55,700 ton/year
3)Conversion fuel gas for boiler: a3= 0
Accordingly, the total of annual CO2 emission is estimated as follows:
Total £a (CO2) = 150,100+ 55,700 + 0 = 205,800 ton-CO2/year
|
|
Summary table: Projected emission reductions (unit: 1,000ton/year):
|
GHG
|
1998
|
1999
|
2000
|
2001
|
2002
|
2010
|
|
A) Project baseline scenario
|
CO2
|
235.0
|
235.0
|
235.0
|
235.0
|
235.0
|
235.0
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
B) Project activity scenario
|
CO2
|
235.0
|
235.0
|
235.0
|
213.1
|
205.8
|
205.8
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
C) Effect ( B-A )
|
CO2
|
0
|
0
|
0
|
-21.9
|
-29.2
|
-29.2
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
D) Cumulative effect
|
CO2
|
0
|
0
|
0
|
-21.9
|
-51.1
|
-284.7
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
Note: The calculations above are based on the schedule as follow:
Completion of construction: October 2000
Starting-up operation: November 2000
F. Additionally to financial obligations of Parties included in Annex II to the Convention within the
framework of the financial mechanism as well as to current official development assistance flows
|
Category of funding
(For each source one line)
|
Amount
(US dollars)
|
|
Subsidy for improving international energy use (Japanese national budget which is undertaken byMITI
)
|
US$ 13,275,000 (1998FY-1999FY) (N/A for the budget on and after 2000FY)
|
|
Own Capital (prepared by Chinese side)
|
|
1US$ = 120 Japanese Yen
G. Contribution to capacity building, transfer of environmentally sound technologies and know-how to other
Parties, particularly developing country Parties, to enable them to implement the provisions of the
Convention. In this process, the developed country Parties shall support the development and enhancement of
endogenous capacities and technologies of developing country Parties
|
Transfer of environmentally sound technologies and know-how
|
Describe briefly
|
|
Transfer of energy saving technology and clean gas recovery technology in Electric Furnace used in
Ferro-alloy refining.
|
By installing pelletizing plant, CO gas recovery system, and furnace cover at Liaoyang Ferroalloy
Works, this project demonstrates:
- Reduction in electric power consumption
- Reduction in coke consumption
- Recovery of CO gas as fuel
- Reduction in dust emission
|
|
Capacity Building
|
By implementing the project, following capacity building can be attained.
- Project management
- Operation of the pelletizing plant
- Management and operation of CO gas recovery system
|
H. Additional comments, if any, including any practical experience gained or technical difficulties,
effects, impacts or other obstacles encountered
1) Any practical experience gained:
2)Technical difficulties:
- 1. Since the technology has been successfully applied at NKK Toyama Works for more than twenty
years, enough practical and commercial experience has been already compiled, therefore, the
technology is highly reliable. Thus, no technical difficulty exists.
2. In the course of the second design meeting (99.01.26 - 99.02.04) in Japan, it was pointed
out that the on-load tap changer equipped for the existing furnace might fail to cause adverse
effect to the performance of the project. It was clearly understood that the Chinese side shall
take necessary measures to avoid this unwanted failure of on-load tap changer.
|
3) Negative impacts and/or effects encountered:
|
Item
|
Please fill in
|
|
Describe environmental negative impacts/effects in detail:
|
No environmental negative impacts/effects are expected so far.
|
|
Do quantitative data exist for evaluation of environmental negative impacts/effects?
|
No.
|
|
Describe social/cultural negative impacts/effects in detail :
|
No social/cultural negative impacts/effects are expected so far.
|
|
Do quantitative data exist for evaluation of social negative impacts/effects?
|
No, so far.
|
|
Describe economic negative impacts/effects in detail :
|
No economic negative impacts/effects are expected so far.
|
|
Do quantitative data exist for evaluation of economic negative impacts/effects?
|
No, so far.
|
4) Other obstacles encountered:
None, so far.
Other:
None, so far.
< Attachment -1 >
CO 2 Reduction Cost Analysis
|
1USD =
|
8.27
|
RMB
|
|
|
Item
|
Unit
|
|
USD
|
|
Discount rate
|
%
|
10
|
|
|
|
The capital investment for the plant
|
RMB x 104
|
18,107
|
21,895
|
x 103USD
|
|
Equipment Life
|
year
|
20
|
|
|
|
The return investment per year (A)
|
RMB x 104
|
2,127
|
2,572
|
x 103USD
|
|
Operating cost per year after Modification (B)
|
RMB x 104
|
13,825
|
16,717
|
x 103USD
|
|
Total cost (A+B)
|
RMB x 104
|
15,952
|
19,289
|
x 103USD
|
|
Cost for Baseline Case ( C )
|
RMB x 104
|
15,735
|
19,027
|
x 103USD
|
|
Net incremental cost ( A+B-C)
|
RMB x 104
|
217
|
262
|
x 103USD
|
|
Production amount of FeCr
|
t/y
|
38,300
|
|
|
|
Production amount of Pellet
|
t/y
|
70,000
|
|
|
|
Reduction of CO2 *1)
|
t/y
|
29,504
|
|
|
|
Cost increase by CO2 Reduction
|
US$/ton-CO2
|
9
|
|
|
*1 Reduction of CO2 emission given above is based on the calculation method employed by Chinese
side. Reduction of CO2 emission calculated by Japanese side is slightly different, i.e., 29,200
t/y. The difference is small and caused by detail calculation method employed. No significant difference
exists between two methods and results.
|
|