Uniform Reporting Format:
Activities Implemented Jointly Under the Pilot Phase
List of
Projects
A. Description of project
1) Title of project: Adavere, District Heating Renovation Project
2) Participants/actors:
|
Item
|
Financier/Reporter
|
Estonian co-reporter
|
|
Name of organisation(a):
|
Statens energimyndighet
|
Eesti Vabariigi Keskkonnaministeerium
|
|
Name of organisation (English):
|
Swedish National Energy Administration(*
|
Ministry of the Environment of the Republic of Estonia
|
|
Department:
|
Secretariat for Climate Policy and International Co-operation
|
International Relations Department
|
|
Acronym:
|
STEM
|
EKM
|
|
Acronym (English):
|
STEM
|
MoE
|
|
Function within activity:
|
Assigned by the Swedish Government for implementation including financing arrangements.
|
Estonian Climate responsible Organisation
|
|
Street:
|
Kungsgatan 43
|
Toompuiestee 24
|
|
Post code:
|
BOX 310, S-631 04
|
10149
|
|
City:
|
Eskilstuna
|
Tallinn
|
|
Country:
|
Sweden
|
Estonia
|
|
Telephone:
|
+46 16 544 20 00
|
+372 62 62 800
|
|
Fax:
|
+46 16 544 22 64
|
+372 62 62 801
|
|
E-mail:
|
klas.tennberg@stem.se
|
min@ekm.envir.ee
|
|
WWW-URL:
|
http://www.stem.se
|
http://www.envir.ee
|
|
Contact person (for this activity):
|
-------------------------------------
|
-------------------------------------
|
|
Surname:
|
Knutsson
|
Kratovits
|
|
First name, middle name:
|
Gudrun
|
Andres
|
|
Job title:
|
Head of Section, Climate Investment Programme
|
Counsellor
|
|
Direct tel:
|
+46 16 544 20 72
|
+372 62 62 841
|
|
Direct fax:
|
+46 16 544 22 64
|
+372 62 62 845
|
|
Direct E-mail:
|
gudrun.knutsson@stem.se
|
andres@ekm.envir.ee
|
(* From 1 January, 1998, the new Swedish National Energy Administration has taken over the
responsibility for the Programme for an Environmentally Adapted Energy System in the Baltic region and
Eastern Europe (EAES Programme) from NUTEK (Swedish National Board for Industrial and Technical
Development).
|
Borrower
|
|
Name of organisation(a):
|
OÜ AVESOO
|
|
Name of organisation (English):
|
AVESOO Ltd
|
|
Department:
|
|
|
Acronym:
|
|
|
Acronym (English):
|
|
|
Function within activity:
|
Project owner
|
|
Street:
|
|
|
Post code:
|
48001 Adavere
|
|
City:
|
Jõgeva county
|
|
Country:
|
ESTONIA
|
|
Telephone:
|
+372 77 69 255
|
|
Fax:
|
+372 77 51 418
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Teas
|
|
First name, middle name:
|
Valdek
|
|
Job title:
|
Managing direktor
|
|
Direct tel:
|
+372 77 69 255
|
|
Direct fax:
|
|
|
Direct E-mail:
|
|
|
Item
|
Please fill in if applicable
|
Please fill in if applicable
|
|
Name of organisation(a):
|
Sihtasutus Regionaalsed Energiakeskused
|
ÅF International
|
|
Name of organisation (English):
|
Regional Energy Centres in Estonia
|
ÅF International
|
|
Department:
|
Võru office
|
AF - International
Malmö
|
|
Acronym:
|
SA REK
|
ÅFI
|
|
Acronym (English):
|
REC
|
AFI
|
|
Function within activity:
|
Local reporter
|
Technical support
|
|
Street:
|
Liiva 12C
|
Stensjögatan 3
|
|
Post code:
|
65602, Võru P.O., BOX 43
|
S-217 65
|
|
City:
|
Võru
|
MALMÖ
|
|
Country:
|
ESTONIA
|
SWEDEN
|
|
Telephone:
|
+372 78 282 30
|
+46-40-37 50 00
|
|
Fax:
|
+372 78 282 31
|
+46-40-13 03 69
|
|
E-mail:
|
|
|
|
WWW-URL:
|
http://www.af.se/ens/english/rec
|
http://www.af.se
|
|
Contact person (for this activity):
|
-------------------------------------
|
------------------------------------
|
|
Surname:
|
Potter
|
Lindgren
|
|
First name, middle name:
|
Elmu
|
Ulf
|
|
Job title:
|
Consultant
|
project leader
|
|
Direct tel:
|
+372 78 282 30
|
+46-40-37 50 97
|
|
Direct fax:
|
+372 78 282 31
|
+46-40-13 03 69
|
|
Direct E-mail:
|
elmu@regen.werro.ee
|
Ulf.lindgren@mlm.pdn.af.se
|
|
|
|
a) Organisation includes: institutions, ministries, companies, non-governmental organisations, etc.
involved in the activity, i.e. research institutes associated with the project, auditors, government agency
closely following the activity.
3) Activity:
|
Item
|
Please fill in if applicable
|
|
General description:
|
The village Adavere with around 750 inhabitants is located in the centre of Estonia. The distance
from Tallinn is 120 kilometers. Adavere is a former agricultural kolkhoz administrative centre, and
has a small district heating system with a heat output of about 2 MW to supply heat mainly to the
residential buildings. Today, the collective farm is privatised and several smaller enterprises are
established. They are now disconnected from district heating. In 1993 the investment projects
became actual and it was caused by high price of heavy fuel oil and bad availability of oil. The
World Bank has financed the conversion of the heating plant to biofuel firing. The converted boiler
is in operation from autumn 1995. Another necessary investment project was started by STEM (former
NUTEK) in 1994 with the aim to secure the heat delivery, install equipment to control both heat and
domestic hot water supply in the buildings as well as introduce commercial delivery terms by
metering.
|
|
Type of project:a)
|
energy efficiency
|
|
Location (exact, e.g. city, region,
state):
|
Adavere village
Jõgeva county
Estonia
|
|
Activity starting date:
|
14. september 1994 (Letter of Intent)
|
|
In operation from:
|
Autumn 1995
|
|
Expected activity ending date:
|
31. March 2005
|
|
Stage of activity:b)
|
Completed
|
|
Lifetime1)of activity if different from ending date:c)
|
Expected technical lifetime is 15 years which means that the plant is expected to be in operation
till 2011.
|
|
Technical data:d)
|
The corroded main pipeline, a 450 m long part, has been replaced by a pre-insulated DN125 pipeline.
Nearly all substations were rebuilt. The district heating network remained directly connected to
the radiator system, but the heat supply can now be adjusted to the actual heat demand. This is
made by installing a mixing pump with control valve, where the supply temperature is controlled as
a function of the ambient temperature. Also some substations received control equipment in order to
keep a constant domestic hot water temperature. New heat meters were installed in 14 substations.
The estimated energy saving: 0,4 GWh/hear from substations and 0,15 GWh/hyear from network.
Previous fuel (before boiler conversion): Mazut ( high-sulphur content heavy fuel oil)
|
a) For example, using Intergovernmental Panel on Climate Change (IPCC) classification: energy efficiency;
renewable energy; fuel switching; forest preservation, restoration or reforestation; afforestation;
fugitive gas capture; industrial processes; solvents; agriculture; waste disposal or bunker fuels.
b) Circle the appropriate option.
c) Methodological work will be required to define lifetime of activities.
d) Methodological work will be required to determine for each type of activity what the minimum data
requirements are.
) The lifetime criteria has been arranged in different groups depending on type of implemented
activities. This classification assumes a level of operation and maintenance which is normal in western
countries.
Lifetime of activity
Heat production plants (bio fuel)
|
25 years
|
New installation of all main equipment parts (fuel handling system, firing equipment and boiler)
and modernisation of secondary equipment.
|
|
15 years
|
Conversion of existing boiler but new installation fuel handling system and firing equipment.
Modernisation of secondary equipment.
|
|
10 years
|
Limited installation of new equipment (only one part of the three main parts, normally the firing
equipment). Modernisation of other equipment.
|
Heat distribution systems and sub-stations
|
25 years
|
Pre-fabricated pipes and installations using certified contractors and supervisor according to EN
norms and applicable district heating practise
|
|
15 years
|
Pre-fabricated pipes and installations without using certified contractors and supervisor
|
|
10 years
|
Modernisation of existing pipes.
|
Energy efficiency in buildings
|
25 years
|
Additional insulation roofs walls etc. with Scandinavian technology.
New installed heating systems.
|
|
15 years
|
Renovation and balancing of heating systems including thermostat valves.
|
|
10 years
|
Weather stripping windows, doors etc.
|
* if a combination of measures is done a reasonable lifetime for the project have to be calculated.
4) Cost (to the extent possible):
To the investment costs are referred the cost of the investment proper and the accumulated interest during
the grace period, generally 2 years.
The AIJ/JI cost items are the costs for:
- Technical assistance, a technical and administrative support from consultants, during the period from
definition of the project till commissioning. These costs are paid by STEM.
- Follow-up, an annual technical and economic follow-up by consultants, hired by STEM, of the operating
results of the plant with the objective to improve on its techno-economic sustainability and its climate
effect. The cost indicated is an average cost per project.
- Administration –Costs for seminars, handbooks, education (capacity building) and average costs of
STEM staff per project.
- Difference in interest rates. STEM applies for its loans generally an interest rate corresponding to
6-month STIBOR (Stockholm InterBank Rate, in April 1999 3,0 %). Assuming a normal lending rate of 7 % means
that this loan is associated with a cost of 4 % in relation to normal lending rate.
Investment/instalment = the borrower’s possible own financing of the investment, followed by the
borrower’s repayment of the loan.
All costs in USD
|
Country
|
|
Adavere (DH)
|
1995
|
1996
|
1997
|
1998
|
1999
|
|
|
|
0
|
1
|
2
|
3
|
4
|
|
Investment
|
1. Loan/debt to STEM
|
133625
|
144953
|
138953
|
120453
|
101918
|
|
|
2. Added costs
|
828
|
10500
|
3250
|
0
|
0
|
|
|
3.Technical assistance
|
67500
|
0
|
0
|
0
|
0
|
|
AIJ/JI
|
4. Follow up
|
0
|
10250
|
10625
|
2750
|
2834
|
|
A. Sweden
|
costs
|
5. Reporting costs
|
0
|
0
|
1063
|
0
|
930
|
|
|
6. Administration
|
66250
|
0
|
0
|
0
|
0
|
|
|
7. Difference in interest
|
4%
|
5798
|
5558
|
4818
|
4077
|
|
|
8.Accum. costs for AIJ/JI
|
133750
|
149798
|
167044
|
174612
|
182452
|
|
|
9.Total costs
|
268203
|
294751
|
305997
|
295065
|
284371
|
|
Investment
|
1. Investment/Instalment
|
0
|
0
|
9250
|
18500
|
18535
|
|
2. Estonia
|
AIJ/JI
|
2. Reporting costs
|
0
|
0
|
0
|
0
|
0
|
|
costs
|
3. Other costs
|
0
|
0
|
0
|
0
|
0
|
|
|
4. Accum. costs for AIJ/JI
|
0
|
0
|
0
|
0
|
0
|
|
|
5. Total costs
|
0
|
0
|
9250
|
27750
|
46285
|
|
1 USD=
|
8
|
SEK
|
|
|
|
|
|
5) Mutually agreed assessment procedures:
|
Describe the procedures, including name of organisations involveda):
|
|
The Ministry of the Environment of Estonia is a central Estonian authority responsible on reporting
of JI projects. This authority assigns a local institution, which is involved into the evaluation
of the climate effects of this project and takes the main responsibility to continue measuring,
results collecting for JI-reporting.
|
a) Please ensure that detailed contact information for all organisations mentioned is reported under
section A.2 above.
B. Governmental acceptance, approval or endorsement
Bearing in mind that all activities implemented jointly under this pilot phase require prior acceptance,
approval or endorsement by the Governments of the Parties participating in these activities, which shall be
shown as follows:
(a) In the case of joint reporting, the report is submitted by the designated national authority of one
participating Party with the concurrence of all other participating Parties as evidenced by attached
letters issued by the relevant national authorities;
(b) In the case of separate reporting, the reports are submitted separately by the designated national
authority of each and every participating Party. Information will only be compiled once reports have been
received from all participating Parties.
1) For the activity:
Third report. First report was submitted 1997.
2) This report is a joint report:
3) General short comment by the government(s) if applicable:
cf. Annex II, section B
C. Compatibility with and supportiveness of national economic development and socio economic and
environment priorities and strategies
|
Describe (to the extent possible) how the activity is compatible with and supportive of national
economic development and socio economic and environment priorities and strategies
|
|
The project meets the following objectives in the Estonian Energy Law, Estonian National
Environmental Strategy, Estonian National Environmental Action Plan, Act on Sustainable Development
and the Long-term Development Plan for the Estonian Fuel and Energy Sector:
- efficient and sustainable use of energy resources;
- to increase the share of renewable energy sources in the primary energy demand from present 8% to
13% to the year 2010;
- to reduce the environmental damage arising from fuel and energy production, transport, conversion
and distribution;
- to create the reliable energy conservation system stimulating the implementation of energy
conservation measures by consumers;
- creation and usage of energy efficient technologies, fuel/energy consuming and diagnostic
equipment;
- stimulation of environmental awareness and environmentally friendly consumption patterns;
- to attract foreign investments for projects which ensure better use natural resources as well as
environmental improvement;
- to develop co-operation between Baltic, Nordic and Central European countries
|
D. Benefits derived from the activities implemented jointly project
Whenever possible, quantitative information should be provided. Failing that, a qualitative description
should be given. If quantitative information becomes available, it could be submitted using the update(s).
(If the amount of quantitative information is too large, the source could be indicated.)
|
Item
|
Please fill in
|
|
Describe environmental benefits in detail:
|
Annual emissions reduction:
Projected: 1999
258 ton CO2 466 ton CO2
4,2 ton SO2 7,5 ton SO2
0,7 ton NOx 1,2 ton NOx
|
|
Do quantitative data exist for evaluation of environmental benefits?
|
Yes. Some measurements have been carried out.
|
|
Describe social/cultural benefits in detail:
|
More stable heat supply to customers
Possibilities to regulate heat in apartments (no more overheated houses and high energy bills)
Domestic hot water at a sufficient and stable temperature (+55°C)
Increased motivation to pay energy bills
|
|
Do quantitative data exist for evaluation of social benefits?
|
Yes . Some reports have been produced.
PHARE programme Estonia. Energy Sector: Post Implementation Performance Analysis for Energy
Investments, 1998.
|
|
Describe economic benefits in detail:
|
Decreased energy consumption
Reinvestment in boiler has been avoided
Energy use can now be charged by measured figures
|
|
Do quantitative data exist for evaluation of economic benefits?
|
Yes. Some reports have been produced.
PHARE programme Estonia. Energy Sector: Post Implementation Performance Analysis for Energy
Investments, 1998.
|
E. Calculation of the contribution of activities implemented jointly projects that bring about real,
measurable and long-term environmental benefits related to the mitigation of climate change that would not
have occurred in the absence of such activities
1) Estimated emissions without the activity (project baseline):
Description of the baseline or reference scenario, including methodologies applied:
Present data reflect emission reductions using status quo (emissions in the period before the conversion to
renewable fuel) for the baseline case. Calculations, according to the top-down method, for emissions from
different types of projects in the baseline case are being made. The changed calculation method will result
in a change in emission reduction.
The new data will be introduced as soon as available.
2) Estimated emissions with the activity:
Description of the scenario, including methodologies applied:
Emission reductions are calculated using the IPCC Guidelines, using the Carbon Emission Factor (CEF) for
different types of fuel, using actual system efficiency. For boiler conversion, the decrease in emissions
is calculated in relation to the amount of fossil fuel replaced (status quo).
For an energy efficiency project the decrease in emissions reflects the amount of fuel that is saved
through the project. In the case that the system uses renewable fuels, the reduction is calculated
comparing the amount of fossil fuels that was used before the conversion to renewable fuels.
Below comparison is based upon that the base-line scenario represents a status quo solution.
Fill in the following tables as applicable:
Summary table: Projected emission reductions:
|
GHG
|
Year 1
=1996
|
Year 2
=1997
|
Year 3
=1998
|
Year 4
=1999
|
...
|
Year 15
=2010
|
|
Planned energy saving from installation substations, MWh/year
|
|
400
|
400
|
400
|
400
|
|
400
|
|
Planned energy saving from network rehabilitation, MWh/year
|
|
150
|
150
|
150
|
150
|
|
150
|
|
A) Project baseline scenario
|
CO2
|
258
|
258
|
258
|
258
|
|
258
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
other
|
|
|
|
|
|
|
|
B) Project activity scenarioa)
|
CO2
|
0
|
0
|
0
|
0
|
|
0
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
other
|
|
|
|
|
|
|
|
C) Effect ( B-A )
|
CO2
|
-258
|
-258
|
-258
|
-258
|
|
-258
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
D) Cumulative effect
|
CO2
|
-258
|
-517
|
-775
|
-1033
|
|
-3874
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
a) Includes indirect GHG leakages.
Summary table: Actual emission reductions:
|
GHG
|
Year 1
= 1996
|
Year 2
= 1997
|
Year 3
=1998
|
Year 4
=1999
|
...
|
Year 15
=2010
|
|
Factual energy saving from installation substations, MWh/year
|
|
330
|
368
|
754
|
809
|
|
809
|
|
Factual energy saving from network rehabilitation, MWh/year
|
|
150
|
150
|
150
|
150
|
|
150
|
|
A) Project baseline scenario
|
CO2
|
223
|
242
|
438
|
466
|
|
466
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
other
|
|
|
|
|
|
|
|
B) Project activity scenarioa)
|
CO2
|
0
|
0
|
0
|
0
|
|
0
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
other
|
|
|
|
|
|
|
|
C) Effect ( B-A )
|
CO2
|
-223
|
-242
|
-438
|
-466
|
|
-466
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
D) Cumulative effect
|
CO2
|
-223
|
-465
|
-903
|
-1368
|
|
-6490
|
|
CH4
|
|
|
|
|
|
|
|
N2O
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
a) Includes indirect GHG leakages.
F. Additionality to financial obligations of Parties included in Annex II to the Convention within the
framework of the financial mechanism as well as to current official development assistance flows
Please indicate all sources of project funding.
|
Category of funding
(For each source one line)
|
Amount
(US dollars)
|
|
Loan from NUTEK
|
133.679
|
|
Grant from NUTEK for technical assistance
|
67.500
|
1 USD = 8,00 SEK
G. Contribution to capacity building, transfer of environmentally sound technologies and know-how to
other Parties, particularly developing country Parties, to enable them to implement the provisions of the
Convention. In this process, the developed country Parties shall support the development and enhancement of
endogenous capacities and technologies of developing country Parties
|
Transfer of environmentally sound technologies and know-how
|
Describe briefly
|
|
Schematically, the transfer of knowledge involves the following activities over time:
i) Technology transfer through STEM technical specialist during the implementation of the project.
ii) Technology transfer through cooperation between foreign supplier and local partner
iii) Conferences, seminars, documentation and training.
iv) Stimulate "net-working" for the exchange of experience between plant owners with
similar problems, e g "bio-clubs"
|
Technology transfer has taken place through:
- STEM technical specialist support to the local project leader and municipality;
Knowledge in negotiations to foreign companies;
Knowledge in managing and planning of projects;
Transferring of environmental issues to the local parties;
Transferring of knowledge in operation and maintenance issue.
- Personal involved in the project has been invited to different seminars and workshops
and, documentation for training has been handed over.
There were arranged seminars through close cooperation between STEM and Estonian partners:
- Environmentally Adapted Energy Systems in the Baltic Region and Eastern Europe - seminar in
Tallinn , 14-15 April, 1994;
- Environmentally Adapted Energy Systems in the Baltic Region and Eastern Europe - seminar and
workshops in Tartu , 25 November, 1994 (prepared information by topics in Estonian more than 150
pages);
- EAES Programme District Heating Day in Vändra, 27 July, 1995;
- Environmentally Adapted Local Energy Systems - seminar and presentation of translated into
Estonian booklet "Environmentally Adapted Local Energy Planning" in Rakvere, 11 November,
1998 and in Tartu, 12 November, 1998;
- Energy efficiency projects in Mustamäe residential buildings - seminar in Tallinn, 16
September, 1996.
iv) Activities have been supported by STEM to stimulate cooperation with local experts,
consultants, project owners to achieve two-way communication and to find respect for chosen
solutions from both sides.
The Project has been visited by specialist of other areas for exchange of experience.
|
Endogenous capacity supported or enhanced:
|
Endogenous capacity
(Name of organisation1)
|
Development (DEV) /
enhancement (ENH)
|
Describe briefly
|
|
OÜ AVESOO
|
(DEV)
|
The staff of the boiler plant has got experience in installation and exploitation of modern western
technology.
|
1) Please ensure that detailed contact information for all organisations listed is reported under section
A.2 above.
H. Additional comments, if any, including any practical experience gained or technical difficulties,
effects, impacts or other obstacles encountered
Fill in as appropriate:
-
Any practical experience gained:
The training of the local staff is necessary for operation and maintenance of the heat substations. The
motivation of the staff to learn is very important to get good results.
0ne of the lessons learnt is that it is important to have persons responsible for the adjustment of the
equipment for each building and that they have good understanding of the consequences of their actions.
Maintenance service of heat substations is necessary to develop.
2) Technical difficulties:
The high rate of change of the district heating supply temperature and week correlation between the supply
temperature and outdoor air temperature. The service life of the district heating network is longer and the
need for maintenance is lower if the rate of change of the temperature in the district heating network is
slow.
In the substation units there are lack of pipe insulation and temperature meters.
The domestic hot water has been too hot. This is not necessary a consequence of the investment because the
control of hot water has remained unchanged in most of the buildings. In some buildings there are installed
a self-operated control valve with a setpoint not correct.
3) Effects encountered:
In the school the control unit of radiator network was out of use and the heating was manually controlled.
The reason for this was to cut the heating costs!
At the end of year 1999 there was installed in the Pargi str. project building local boiler and the
inhabitants will not use more district heating service.
4) Impacts encountered:
Better indoor climate in the most of the buildings and improved domestic hot water supply .
5) Other obstacles encountered:
The problems with the converted boiler (World Bank financing) and probably caused a "stripped
down" version due to low budget will decrease the positive effect of the present district heating
rehabilitation project. The pre-furnace needs some repairing and at the same time OÜ Avesoo has to
keep its expenditures on minimum level, as the clients are in difficulties to pay their heat bills ( low
income in the agricultural sector). There is risk that the clients will start disconnecting from district
heating with a rising heat price.
6) Other:
The district heating plant in Adavere is down outside the heating season. This means corrosion problems for
the boilers and the pipeline. The heating season is started too late and ended too early.
Calculations of the volume of emissions of sulphur dioxide and nitrogen oxide in the section D are revised
and new emissions values are calculated according to the Regulation No. 33 of 17. March 1999 of the
Ministry of the Environment "The procedure and methods of determination of the volume of pollutants
from combustion plants to the air".