USIJI Uniform Reporting Document:
Activities Implemented Jointly Under the Pilot Phase
List of
Projects
A. Description of the AIJ project
1. Title of project: Wind Energy in Northern Chile
2. Host country: Chile
3. Brief project description:
- The Wind Energy Project in northern Chile involves a 37.5 MW wind energy installation. The project
expects to include the installation of 50 wind turbines each capable of generating 750 kilowatts of energy.
The facility will be constructed near the city of Calama in the desert region of Antofagasta. The
preliminary project estimate indicates that the project would off-set approx. 3,000,000 metric tons of
CO2 over a 20 year period by displacing coal-fired power generation within the Great Northern
Interconnected System (SING). The International Institute for Energy Conservation (IIEC) and the
CorporaciÌn Nacional del Cobre de Chile (CODELCO) are jointly developing the project to demonstrate
a renewable energy resource and to realize reductions in greenhouse gas emissions.
4. Participants:
|
Name of Organization or Individual
|
Country
|
|
International Institute for Energy Conservation (IIEC)
|
U.S.A.
|
|
CorporaciÌn Nacional del Cobre de Chile (CODELCO)
|
Chile
|
|
Item
|
Please Complete If Applicable
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
International Institute for Energy Conservation (IIEC)
|
|
Name of organization (English)
|
|
|
Acronym (original language)
|
|
|
Acronym (English)
|
IIEC
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
Project coordination and reporting
|
|
Street
|
1015 15th Street, N.W. #600
|
|
City
|
Washington
|
|
State
|
District of Columbia
|
|
Post code
|
20005-2650
|
|
Country
|
U.S.A.
|
|
Telephone
|
202-326-5170
|
|
Fax
|
202-326-5172
|
|
E-mail
|
kgordon@iiec.cerf.org
|
|
World Wide Web-URL address
|
www.cerf.org/iiec/
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Gordon
|
|
First name, middle name
|
Ms. Kelly
|
|
Job title
|
Director of Programs
|
|
Direct telephone
|
202-326-5170
|
|
Direct fax
|
202-326-5172
|
|
Direct e-mail
|
kgordon@iiec.cerf.org
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
|
Item
|
Please Complete If Applicable
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
CorporaciÌn Nacional del Cobre de Chile (CODELCO)
|
|
Name of organization (English)
|
|
|
Acronym (original language)
|
CODELCO
|
|
Acronym (English)
|
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
Project implementation
|
|
Street
|
Huerfanos 1270 piso 9
|
|
City
|
Santiago
|
|
State
|
|
|
Post code
|
|
|
Country
|
Chile
|
|
Telephone
|
56 (2) 6903950
|
|
Fax
|
56 (2) 6903917
|
|
E-mail
|
Ftoledo@STGO.CODELCO.CL
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Toledo
|
|
First name, middle name
|
Fernando
|
|
Job title
|
Environmental Affairs
|
|
Direct telephone
|
56 (2) 6903950
|
|
Direct fax
|
56 (2) 6903917
|
|
Direct e-mail
|
Ftoledo@STGO.CODELCO.CL
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
-
5. Description of AIJ project activities
|
Item
|
|
|
Type of Project
|
|
Sector(s)
|
Energy
|
|
Primary activity(ies)
|
Alternative Energy Generation
|
|
Project Location
|
|
Country
|
Chile
|
|
Exact location (city, state, region)
|
Chile’s region II, in the desert of Chile about 250 km NE of the city of Antofagasta.
|
|
Key Dates and Current Stage of Project
|
|
Project starting date (month/year)
|
2002
|
|
Project ending date (month/year)
|
2022
|
|
Project lifetime (years)
|
21
|
|
Current stage of project
|
Mutually agreed
|
|
General Project Description and Technical Data
|
|
The project will construct a 37.5 MW wind farm to be located in the Antofagasta region of northern
Chile. The facility will consist of 50 turbines of 750kW each. CODELCO will either use the
electricity generated by the wind farm to power operations at the Chuquicamata copper mine or sell
it to the Great Northern Interconnected System (SING). The IIEC and CODELCO are jointly developing
this project to realize reductions in greenhouse gas emissions and demonstrate a renewable energy
resource. It has been estimated that the project will offset approx. 3,000,000 metric tons of CO2
over the life of the project (20 years). This will be accomplished by displacing coal-fired power
generation within the SING.
|
|
Methodology for Calculating Cost Data
|
|
Total project implementation costs have been estimated at $37.5 million ($1,000 per kilowatt of
wind capacity installed). The costs have been estimated by comparing the cost of implementation for
this type of a project to the cost of a similar project in other parts of the world. IIEC and
CODELCO have estimated a 20-project life (equipment typically has a 20-30 years of useful life).
Investment costs for this type of project in other parts of the world are around $1200 per
installed kW. In this project, the per kW cost is estimated at $1000 per installed kW due to the
low cost of land, availability of roads, a short distance to grid and urban areas, and available
labor.
|
-
(b) Cost data–Project development
This information is not yet available.
(c) Cost data–Project implementation
This information is not yet available.
-
7. Monitoring and verification of AIJ project activities and results
|
Item
|
|
|
Party(ies) that will be monitoring project activities
|
Not yet determined
|
|
Party(ies) that will be externally verifying project results
|
Not yet determined
|
|
Date when the monitoring plan became (or will become) operational (month/year)
|
To be determined
|
|
Types of data that will be collected
|
To be determined
|
|
Description of Monitoring and Verification Activities and Schedule for Implementation
|
|
Monitoring procedures have not been developed. When developed they will integrate an assessment of
the contribution of the wind farm in the total energy generation of the system. The valuation of
the emissions avoided will be developed through the account of electricity supply coming from the
wind farm and the operation of the system. Emission reduction estimates will be estimated annually.
IIEC and CODELCO will work together to determine an appropriate verification organization for this
project. An annual reporting schedule consistent with the USIJI program will be designed.
|
|
Item
|
|
|
Please check one of the following.
|
This report is a first report.
or
This report is an intermediate report.
or
This report is a final report.
|
|
Please check one of the following:
|
This report is a joint report. Letter(s) of approval of this report from the designated national
authority of the other Party(ies) involved in the activity is(are) attached in Section J, Annex.
or
This report is a separate report.
|
|
Additional comments (if any):
|
|
|
Compatibility with Economic Development and Socioeconomic and Environmental Priorities
|
|
The project will demonstrate the use of wind energy technology, reduce GHG emissions and promote
technology transfer to Chile. Electricity generated using this renewable resource will help meet
the rising energy needs of the northern region of Chile in a less polluting manner. A cleaner
source of energy will support the continued economic development of northern Chile and could offset
some of the need for new fossil fired plants.
|
-
D. Environmental, social/cultural, and economic impacts of the AIJ project
|
Non-Greenhouse-Gas Environmental Impacts of the Project
|
|
The impact of the project on sulfur dioxide emissions has not been estimated. The project team will
assess the impact once the configuration of the wind system is fully described. There is a
potential of visual and noise impacts of the wind farm, however, the project team does not feel
that this will be a problem due to the fact that the proposed location is sparsely populated and
not located in a protected natural area.
|
|
Social/Cultural Impacts of the Project
|
|
This information is not yet available.
|
|
Economic Impacts of the Project
|
|
This project will allow Chilean companies to develop local technology for installation of the
turbines and of the system required by the operation of the plant. The operation and maintenance
can be performed by local companies thus benefiting the economy.
|
|
Item
|
|
|
Site Designation
|
|
Site number (order of presentation in this report)
|
1 of 1
|
|
Site name/designation
|
Chile’s region II, 22 degrees south latitude, in the desert of Chile, about 250 km northeast
of the city of Antofagasta.
|
|
Project sector
|
Energy
|
|
Reference Scenario
|
|
Primary activity(ies)
|
Alternative Energy Generation
|
|
Has the reference scenario changed since the last report? (If yes, explain any changes below.)
|
Yes
No
This is the first project report.
|
|
Description:
The proposed project site is currently under state ownership and has no other planned uses. The
nearest population to the plant site is approx. 20km. Due to the close proximity of mining activity
to the project site, there are roads capable of supporting heavy equipment and trucks.
The project needs to consider the impact of the wind turbines or the generating system on the
navigation system used by the airport located about 15 km from the proposed site.
|
|
Predicted Project Scenario
|
|
Primary activity(ies)
|
Alternative Energy Generation
|
|
Description:
The specific measure to reduce greenhouse gas emissions is the installation of turbines and
auxiliary equipment to generate electricity-using wind. Electricity generated by the wind farm
would be sold to the regional grid or directly used to power operations of the Chuquicamata copper
mine. Current electricity consumption at CODELCO’s Chuquicamata mine is 2,233 GWh per year.
It is estimated that roughly 97.2% of the electricity consumed is provided by the Tocopilla power
plant. Tocopilla is a private coal-fired power generator. Future demand for electricity is expected
to be met through Tocopilla’s production or through purchases from the grid Sistema
Interconectado del Norte Grande (SING). Ninety-five percent of the SING’s electricity
generating capacity (1120MW) is coal fired, while the remainder is diesel-fired. Generators in the
SING have committed to construct an additional 300 MW of coal-fired capacity and 700 MW of natural
gas combined cycle plant in the next 3-5 years. Consumption rates are expected to increase due to a
sharp increase in energy consumption that is being driven by growth in the in the mining and
industrial sectors in the region. The delivered price of a new natural gas supply from Argentina is
expected to be lower than coal-fired power. Therefore, coal plants would become the marginal
plants. This project plans to introduce wind energy as an alternative to coal. Additional wind
capacity is expected to offset coal-fired power at the margin. The effectiveness of the wind farm
to avoid GHG emissions depends on the amount of electricity delivered to the grid.
Current CO2 emissions related to Chuquicamata’s electricity consumption are
estimated by CODELCO to be 2.937 million metric tons per year. By introducing alternative
technology, there is a high potential for renewable energy to reduce GHG.
|
|
Actual Project
|
|
Primary activity(ies)
|
This information is not yet available.
|
|
Description:
This information is not yet available.
|
|
GHG Emission/Sequestration Calculation Methodology
|
|
Site number
|
1 of 1
|
|
Project sector
|
Energy
|
|
Description of Calculation Methodology for the Reference Scenario
|
|
The baseline estimate refers to the 37.5 MW and 111.47 Gwh of electricity that would be provided by
the proposed wind energy project (the proposed project assumes the wind facility will displace
111.47 GWh of coal-generated electricity per year and applies an emission factor of 1,300 g
CO2/kWh to calculate annual, CO2 emissions).
|
|
Description of Calculation Methodology for the Project Scenario
|
|
Using wind statistics gathered over several years near the project site, an anticipated annual
power production of 111.47 GWh per year was estimated. Within the timeframe of this project, coal
is anticipated to be the marginal fuel. Since natural gas from Argentina to fuel the new turbine
capacity will be less expensive these units will be dispatched first. The windfarm will displace
coal and the offset will be approx. 145,000 tons per year of CO2.
|
|
Description of Calculation Methodology for the Actual Project
|
|
This information is not yet available.
|
|
Indirect or Secondary GHG Impacts (Positive and Negative)
|
|
Factors that could prevent the magnitude of benefits anticipated include failure of the wind
turbines, changes in wind patterns over time, and changes in competing power sources over time.
|
|
Factors That Could Cause the Future Loss or Reversal of GHG Benefits
|
|
The loss or reversal of project benefits is not a significant issue. Each kWh of power generated by
the wind facility and dispatched to the grid or mine will produce a permanent benefit in the form
of avoided emissions from the fossil fuel combustion.
|
|
Strategy for Reducing the Risk of Future Loss or Reversal of GHG Benefits
|
F. Funding of the AIJ project
|
Current or Planned Activities to Obtain Additional Funding
|
|
This information is not yet available.
|
-
G. Contribution to capacity building and technology transfer
|
Contribution to Capacity Building and Technology Transfer
|
|
This information is not yet available.
|
|
Recent Project Developments
|
|
This information is not yet available.
|
|
Technical Difficulties and Other Obstacles Encountered
|
|
This information is not yet available.
|
|
Additional Information
|
|
None.
|
|
Country/Project Title
|
Name, Title, and Government Agency of the Designated National Authority
|
Date of Approval (day/month/year)
|
|
Chile/Wind Energy in Northern Chile
|
Ambassador Stein of Chile; State Department
|
18 December 1998
|
|
|