USIJI Uniform Reporting Document:
Activities Implemented Jointly Under the Pilot Phase
List of
Projects
A. Description of the AIJ project
1. Title of project: Zelenograd District Heating System Improvements
2. Host country: Russian Federation
3. Brief project description:
The Zelenograd District Heating System Improvements Project is an energy efficiency project in which new
equipment will be installed in the district heating system of Zelenograd, Russian Federation. New controls,
valves, pumps, and heat exchangers will be installed at 28 sub-stations and one boiler facility. These
improvements will allow better control of the space and hot water heating supplied by the district heating
system, which will reduce natural gas consumption and, hence, greenhouse gas (GHG) emissions.
Note: Although the information contained in this report is based on the USIJI project proposal and other
material provided by the project developer, the developer has not yet reviewed this document.
4. Participants:
|
Name of Organization or Individual
|
Country
|
|
City of Zelenograd
|
Russian Federation
|
|
Russia Energy Savings Fund of the Ministry of Fuels and Energy
|
Russian Federation
|
|
Consortium for Integrated Resource Planning at the University of Wisconsin
|
U.S.A.
|
|
Johnson Controls Inc.
|
U.S.A.
|
|
Leonardo Academy Inc.
|
U.S.A.
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language) or
Name of individual if unaffiliated with any organization
|
City of Zelenograd
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
None
|
|
Acronym (English)
|
None
|
|
Department
|
Enterprise of Heat Stations, Heat Power Network, and Gas Facilities of Zelenograd
|
|
Function(s) within the AIJ project activities
|
|
|
Street
|
20 Zapadny Proyezd
|
|
City
|
Zelenograd
|
|
State
|
Moscow Region
|
|
Post code
|
103482
|
|
Country
|
Russian Federation
|
|
Telephone
|
7-095-535-82-16
|
|
Fax
|
7-095-534-6811
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Podstankin
|
|
First name, middle name
|
Nikolai
|
|
Job title
|
General Director
|
|
Direct telephone
|
7-095-535-82-16
|
|
Direct fax
|
7-095-534-6811
|
|
Direct e-mail
|
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
Zernatsky
|
|
First name, middle name
|
Eduard
|
|
Job title
|
Consultant
|
|
Direct telephone
|
7-095-535-82-16
|
|
Direct fax
|
7-095-534-6811
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language) or
Name of individual if unaffiliated with any organization
|
Russia Energy Savings Fund of the Ministry of Fuels and Energy
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
None
|
|
Acronym (English)
|
None
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
|
|
Street
|
31 Giljarovsky Prospekt
|
|
City
|
Moscow
|
|
State
|
|
|
Post code
|
129832
|
|
Country
|
Russian Federation
|
|
Telephone
|
7-095-248-81-11
|
|
Fax
|
7-095-975-20-45
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Vasilliev
|
|
First name, middle name
|
Valeri
|
|
Job title
|
Director
|
|
Direct telephone
|
7-095-248-81-11
|
|
Direct fax
|
7-095-975-20-45
|
|
Direct e-mail
|
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
|
Consortium for Integrated Resource Planning at the University of Wisconsin
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
None
|
|
Acronym (English)
|
None
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
|
|
Street
|
432 North Lake Street, Rm. 805
|
|
City
|
Madison
|
|
State
|
Wisconsin
|
|
Post code
|
53706
|
|
Country
|
U.S.A.
|
|
Telephone
|
608-255-0988
|
|
Fax
|
608-255-7202
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Arny
|
|
First name, middle name
|
Michael
|
|
Job title
|
Director of Consortium
|
|
Direct telephone
|
608-255-0988
|
|
Direct fax
|
608-255-7202
|
|
Direct e-mail
|
mdarny@facstaff.wisc.edu
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language) or
Name of individual if unaffiliated with any organization
|
Johnson Controls Inc.
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
None
|
|
Acronym (English)
|
None
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
|
|
Street
|
507 East Michigan Street
|
|
City
|
Milwaukee
|
|
State
|
Wisconsin
|
|
Post code
|
53201
|
|
Country
|
U.S.A.
|
|
Telephone
|
414-274-4148
|
|
Fax
|
414-277-5053
|
|
E-mail
|
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Cronin
|
|
First name, middle name
|
Patrick
|
|
Job title
|
Director of Marketing Services
|
|
Direct telephone
|
414-274-4148
|
|
Direct fax
|
414-277-5053
|
|
Direct e-mail
|
patrick.j.cronin@jci.com
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
|
Item
|
|
|
Organization
|
|
Name of organization (original language) or
Name of individual if unaffiliated with any organization
|
Leonardo Academy Inc.
A Non-Profit Educational Foundation
|
|
Name of organization (English)
|
(Same as above)
|
|
Acronym (original language)
|
None
|
|
Acronym (English)
|
None
|
|
Department
|
|
|
Function(s) within the AIJ project activities
|
|
|
Street
|
1526 Chandler Street
|
|
City
|
Madison
|
|
State
|
Wisconsin
|
|
Post code
|
53711
|
|
Country
|
U.S.A.
|
|
Telephone
|
608-250-0400
|
|
Fax
|
608-255-7202
|
|
E-mail
|
leonardo97@aol.com
|
|
World Wide Web-URL address
|
|
|
Administrative Officer Responsible for the Project
|
|
Surname
|
Arny
|
|
First name, middle name
|
Michael
|
|
Job title
|
Executive Director
|
|
Direct telephone
|
608-250-0400
|
|
Direct fax
|
608-255-7202
|
|
Direct e-mail
|
leonardo97@aol.com
|
|
Contact Person for AIJ Activities (if different from the Administrative Officer)
|
|
Surname
|
|
|
First name, middle name
|
|
|
Job title
|
|
|
Direct telephone
|
|
|
Direct fax
|
|
|
Direct e-mail
|
|
5. Description of AIJ project activities
|
Item
|
|
|
Type of Project
|
|
Sector(s)
|
Energy
|
|
Primary activity(ies)
|
Energy efficiency improvements
|
|
Project Location
|
|
Country
|
Russian Federation
|
|
Exact location (city, state, region)
|
City of Zelenograd, 35 km north of Moscow
|
|
Key Dates and Current Stage of Project
|
|
Project starting date (month/year)
|
This information is not yet available.
|
|
Project ending date (month/year)
|
This information is not yet available.
|
|
Project lifetime (years)
|
30 years
|
|
Current stage of project
|
Mutually agreed
|
|
General Project Description and Technical Data
|
|
The project will reduce GHG emissions by increasing the efficiency of the open loop section of the
system, which will decrease natural gas consumption at the Zelenograd district heating system.
Efficiency improvements will be made at 28 sub-stations and one boiler facility, and will include
the following activities:
For space heating:
- add heat exchangers in the sub-stations between the heating distribution system and the space
heating loads;
- add pumps to circulate space heating water to buildings; and
- add control valves and control systems to regulate the flow of hot water from the district
heating system through the new heat exchangers to maintain water temperature.
For domestic hot water heating loads:
- add heat exchangers between the distribution network and the domestic hot water heating loads;
- add control valves and control systems to regulate the flow of hot water through the new
exchangers to maintain temperature; and
- increase the capacity of the cold potable water distribution system to provide adequate supply
of cold water to be heated both in the new exchangers and in the hot water heating loads.
For system operations:
- improve communications between sub-stations and the boilerhouse number 2; and
- install a central control system and a data acquisitions system in boilerhouse number 2 that
allow for remote monitoring and control of the sub-station operation.
|
6. Cost
(a) Explanation of methodology for calculating cost data
|
Methodology for Calculating Cost Data
|
|
This information is not yet available.
|
(b) Cost data–Project development
This information is not yet available.
(c) Cost data–Project implementation
This information is not yet available.
7. Monitoring and verification of AIJ project activities and results
|
Item
|
|
|
Party(ies) that will be monitoring project activities
|
This information is not yet available.
|
|
Party(ies) that will be externally verifying project results
|
This information is not yet available.
|
|
Date when the monitoring plan became (or will become) operational (month/year)
|
This information is not yet available.
|
|
Types of data that will be collected
|
Fuel consumption and energy use
|
|
Description of Monitoring and Verification Activities and Schedule for Implementation
|
|
GHG emission reductions will be monitored by measuring the fuel consumption and energy sent out
from each sub-station to the buildings, and by estimating GHG emissions from these data. In
addition, the controls system installed on the district heating system will include the capability
to measure the amount of heat delivered from each sub-station, which provides a second measure of
reductions in energy use.
All participants have agreed to allow for external verification of GHG emission reductions by a
panel approved party.
|
B. Governmental approval
|
Item
|
|
|
Please check one of the following.
|
This report is a first report or
This report is an intermediate report or
This report is a final report.
|
|
Please check one of the following:
|
This report is a joint report. Letter(s) of approval of this report from the designated national
authority of the other Party(ies) involved in the activity is(are) attached in Section J, Annex or
This report is a separate report.
|
|
Additional comments (if any):
|
|
C. Compatibility with, and supportiveness of, national economic development and socioeconomic and
environmental priorities and strategies
|
Compatibility with Economic Development and Socioeconomic and Environmental Priorities
|
|
The project will complement the work proposed under the Environmental Technology Initiative of the
Russian government. Zelenograd is one of 10 energy efficiency demonstration zones supported by the
government. These demonstration zones are under development within the framework of the United
Nations ECE "Energy Efficiency 2000." In the short-term, the Environmental Technology
Initiative aims to reduce emissions of GHGs and acid rain precursors on a limited scale in order to
demonstrate how this can be achieved on a national scale. In the long-term, it intends to provide
widespread dissemination of local experience in market economy energy efficiency measures,
including the promotion of trade in commercially available energy efficient and environmentally
safe technologies.
|
D. Environmental, social/cultural, and economic impacts of the AIJ project
|
Non-Greenhouse-Gas Environmental Impacts of the Project
|
|
In reducing emissions, the project will help improve air quality in the surrounding area.
|
|
Social/Cultural Impacts of the Project
|
|
The project provides a more comfortable indoor environment for the residents of the buildings
serviced by the district heating sub-stations included in the project.
|
|
Economic Impacts of the Project
|
|
The project will help the city of Moscow save money by reducing its district heating subsidy
allocation.
|
E. Greenhouse gas impacts of the AIJ project
1. Scenario description
|
Item
|
|
|
Site Designation
|
|
Site number (order of presentation in this report)
|
1 of 1
|
|
Site name/designation
|
Zelenograd District Heating System
|
|
Project sector
|
Energy
|
|
Reference Scenario
|
|
Primary activity(ies)
|
Conventional operation, including manual controls, infrequent adjustments to valves
|
|
Has the reference scenario changed since the last report? (If yes, explain any changes below.)
|
Yes
No
This is the first project report.
|
|
Description:
The city of Zelenograd is located 35 kilometers northwest of Moscow. The city covers approximately
35 square kilometers and as of 1992, had a population of 185,000.
The Zelenograd district heating system consists of three boiler house facilities and 47 heat
exchange sub-stations fueled by natural gas. The reference scenario focuses on the open loop
section of the system where existing boilerhouse number 2 serves 28 open loop heating sub-stations.
These sub-stations were built without heat exchangers so that the flow from the heating
distribution system directly meets the space heating and the domestic water heating loads for the
buildings serviced by this section.
The prevailing standards for the district heating system are manual controls for sub-stations and
infrequent adjustments to the valve settings. Valve setting adjustments are commonly made only two
times a year and the valves are often in poor condition. Without the project, these prevailing
standards for system operation are expected to continue indefinitely.
|
|
Predicted Project Scenario
|
|
Primary activity(ies)
|
Energy efficiency improvements
|
|
Description:
The project will reduce GHG emissions by increasing the efficiency of the open loop section of the
system, which will decrease natural gas consumption at the Zelenograd district heating system.
Project efficiency improvements include the installation of heat exchangers, new automated control
equipment, pumps, and valves at one boiler facility and 28 sub-stations. These measures will
decrease losses of energy used for space heating and hot water.
|
|
Actual Project
|
|
Primary activity(ies)
|
This information is not yet available.
|
|
Description:
This information is not yet available.
|
2. GHG emission/sequestration calculation methodology
|
GHG Emission/Sequestration Calculation Methodology
|
|
Site number
|
1 of 1
|
|
Project sector
|
Energy
|
|
Description of Calculation Methodology for the Reference Scenario
|
|
The reference scenario annual emissions were calculated by multiplying the annual natural gas
consumption for the 28 sub-stations (165 * 106 m3) by an emission factor of
1.876 kg CO2 /m3 natural gas. The CO2 emission factor is based on
a natural gas heat content of 39,305.5 BTU/m3 and a carbon content of approximately
0.013 g C/Btu. Reference scenario annual emissions are therefore estimated as 309,540 t
CO2 (= 165,000,000 m3 natural gas * 1.876 kg CO2/m3 *
10-3 t/kg).
It is assumed that natural gas consumption at the 28 sub-stations remains constant throughout the
life of the project.
|
|
Description of Calculation Methodology for the Project Scenario
|
|
The project scenario emission estimates are based on the assumption that the controls improvements
installed under the project will reduce fuel use by 17 percent at each of the 28 sub-stations. The
projected reduction was developed via the TRNSYS-based model, using empirical data from district
heating networks in Prague, Czech Republic, which closely represent the heating network design
found in Zelenograd.
The project scenario annual emissions were calculated in the same way as in the reference scenario,
i.e., by multiplying annual natural gas consumption for the 28 sub-stations (83% of reference
scenario consumption, or 137 * 106 m3) by an emission factor of 1.876 kg
CO2 /m3 natural gas. Therefore, project scenario annual emissions are
estimated as 257,012 t CO2 (= 137,000,000 m3 natural gas * 1.876 kg
CO2/m3 * 10-3 t/kg).
It is assumed that natural gas consumption at the 28 sub-stations remains constant throughout the
life of the project.
|
|
Description of Calculation Methodology for the Actual Project
|
|
This information is not yet available.
|
3. GHG emission/sequestration data
(a) Reporting of GHG emissions/sequestration
(b) Additional information on GHG emissions/sequestration
|
Indirect or Secondary GHG Impacts (Positive and Negative)
|
|
This information is not yet available.
|
|
Factors That Could Cause the Future Loss or Reversal of GHG Benefits
|
|
Given the nature of this project, once GHG benefits are achieved they cannot subsequently be lost.
However, there is some risk that inadequate maintenance or equipment failure could diminish the
effectiveness of the energy efficiency improvements of the project over time, which would reduce
the GHG emission reductions anticipated with the project.
|
|
Strategy for Reducing the Risk of Future Loss or Reversal of GHG Benefits
|
|
The Consortium for Integrated Resource Planning will train the district heating system managers in
operations and maintenance, which should help ensure that projected emission reductions are not
lost due to poor maintenance or problems associated with equipment failure.
|
F. Funding of the AIJ project
1. Identification of funding sources
(a) Funding sources for project development
This information is not yet available.
(b) Funding sources for project implementation
This information is not yet available.
2. Assessment of additional funding needs
|
Current or Planned Activities to Obtain Additional Funding
|
|
Currently, efforts are under way to identify additional funding sources. Within the context of what
is acceptable under the pilot phase of JI, the CO2 emission reduction credits
anticipated to accrue over the life of the project will be emphasized as part of the project value.
Funding is being sought through the Edison Electric Institute’s International Utility
Efficiency Partnerships (IUEP) program.
|
G. Contribution to capacity building and technology transfer
|
Contribution to Capacity Building and Technology Transfer
|
|
If adequate funds are available, a training center will be built in Zelenograd to facilitate
technology transfer. The training center will expand the education of district heating system
operators in the development and implementation of district heating system improvements, and the
development of JI projects. In addition, since many of the heating networks throughout the Russian
Federation are of a similar design, the possibility of implementing comparable projects in other
cities is likely.
|
H. Recent developments, technical difficulties, and obstacles encountered
|
Recent Project Developments
|
|
This information is not yet available.
|
|
Technical Difficulties and Other Obstacles Encountered
|
|
This information is not yet available.
|
I. Additional information
|
Additional Information
|
|
None.
|
J. Annex
1. Host country acceptance of the AIJ project
|
Country/Project Title
|
Name, Title, and Government Agency of the Designated National Authority
|
Date of Approval (day/month/year)
|
|
Russian Federation/Zelenograd District Heating System Improvements
|
Interagency Commission of the Russian Federation on Climate Change Problems
|
27 November 1996
|
2. Letters of approval of this AIJ project report
See attached concurrence form.