1. Title of project: Bio-Gen Biomass Power Generation Project, Phase I
2. Host country: Honduras
3. Brief project description:
The Bio-Gen Biomass Power Generation Project (Phase I) involves construction and operation of a privately
owned and operated 15 megawatt (MW) biomass waste-to-energy plant in Guaimaca, Honduras. The plant will
utilize wood wastes generated from forest products processing in the region. The wastes, which include
sawmill and logging residues, are currently burned under uncontrolled conditions or disposed of in rivers
or other low-lying areas. Power produced by the plant will be sold to the national utility, Empresa
Nacional de Energia Electrica (ENEE), and will displace electricity and associated greenhouse gas (GHG)
emissions that would have been produced by fossil-fuel burning facilities.
4. Participants:
Name of Organization or Individual
Country
Biomasa-Generacion, S. de R. L.
Honduras
Nations Energy Corporation
U.S.A.
Add-On Energy 1 (AOE1)
U.S.A.
International Utility Efficiency Partnerships (IUEP)
U.S.A.
Item
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
Biomasa-Generacion, S. de R. L.
Name of organization (English)
Acronym (original language)
None
Acronym (English)
None
Department
Biomasa-Generacion (Bio-Gen)
Function(s) within the AIJ project activities
Project development, project administration
Street
2811 Boulevard C.C.E.E.
City
Tegucigalpa
State
Post code
Country
Honduras
Telephone
504-337288
Fax
504-337598
E-mail
World Wide Web-URL address
Administrative Officer Responsible for the Project
Surname
Lima M.
First name, middle name
Ricardo
Job title
President
Direct telephone
504-337288
Direct fax
504-337598
Direct e-mail
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
Item
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
Nations Energy Corporation
Name of organization (English)
(Same as above)
Acronym (original language)
None
Acronym (English)
None
Department
Function(s) within the AIJ project activities
Project development, financing
Street
422 West Fairbanks Avenue, Suite 300
City
Winter Park
State
Florida
Post code
32789
Country
U.S.A.
Telephone
407-647-7747
Fax
407-647-7751
E-mail
World Wide Web-URL address
Administrative Officer Responsible for the Project
Surname
Bower
First name, middle name
Mark
Job title
Director of Projects
Direct telephone
407-647-7747
Direct fax
407-647-7751
Direct e-mail
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
Item
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
Add-On Energy 1
Name of organization (English)
(Same as above)
Acronym (original language)
AOE1
Acronym (English)
(Same as above)
Department
Function(s) within the AIJ project activities
Financing
Street
3002-A Kingston Court
City
Marietta
State
Georgia
Post code
30067
Country
U.S.A.
Telephone
404-955-8284
Fax
404-955-8194
E-mail
World Wide Web-URL address
Administrative Officer Responsible for the Project
Surname
Elliot
First name, middle name
Gerald R.
Job title
President
Direct telephone
404-955-8284
Direct fax
404-955-8194
Direct e-mail
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
Item
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
5. Description of AIJ project activities
Item
Type of Project
Sector(s)
Energy, waste
Primary activity(ies)
Alternative energy generation (wood waste)
Project Location
Country
Honduras
Exact location (city, state, region)
10 km SW of the city of Guaimaca, in the Department of Francisco Morazan
Key Dates and Current Stage of Project
Project starting date (month/year)
January 1997
Project ending date (month/year)
December 2017
Project lifetime (years)
21
Current stage of project
In progress
General Project Description and Technical Data
The Bio-Gen Biomass Power Generation Project establishes a 15 MW biomass waste-to-energy plant that
will be privately owned and operated by Biomasa-Generacion (Bio-Gen) in Guaimaca, Honduras.
Electricity generated by the plant will be sold to the national utility, Empresa Nacional de
Energia Electrica (ENEE), to meet a portion of Honduras's energy demand. The plant will utilize
sawmill and logging residues for fuel, and is expected to operate at least 7,500 hr/year for 20
years.
From 1993 to 1994, Honduras, like many Latin American countries, suffered from significant electric
supply interruptions due to an over-dependence on variable energy supplies. Currently, 60% of the
total grid or 433 MW is hydroelectric, and 40%, or 297 MW, is thermal. The electric supply
interruptions have cost Honduras millions of dollar in terms of GDP. Furthermore, energy demand in
Honduras is anticipated to increase at a rate of 6 percent per year until 2000. In order to meet
this increasing energy demand under current conditions, ENEE has plans to expand its fossil fuel
capacity by 100 MW by 1999. President Reina and Minister Sandoval have shown leadership in
promoting changes to Le Marca to promote renewable energy development in Honduras.
Electricity from the Bio-Gen plant will displace electricity that would have otherwise been
generated by new fossil fuel capacity, and thus will offset GHG emissions from fossil fuel use.
6. Cost
(a) Explanation of methodology for calculating cost data
This information is considered confidential by the developer and is therefore not available.
(b) Cost data-Project development
This information is considered confidential by the developer and is therefore not available.
(c) Cost data-Project implementation
This information is considered confidential by the developer and is therefore not available.
7. Monitoring and verification of AIJ project activities and results
Item
Party(ies) that will be monitoring project activities
Bio-Gen and subcontracted independent testing firms.
Party(ies) that will be externally verifying project results
The external verifier has not been selected at this time. The qualifications and affiliation of the
external verifier will be provided upon selection of an acceptable candidate.
Date when the monitoring plan became (or will become) operational (month/year)
Monitoring was to begin prior to the commencement of construction in the first quarter of 1997.
Types of data that will be collected
Stack gas emissions and feedstock sources will be monitored.
Description of Monitoring and Verification Activities and Schedule for Implementation
Independent testing firms will monitor the project, using U.S. Environmental Protection Agency
(EPA) emission test protocols and quality assurance procedures for stack gas emissions. The
participants also have agreed to monitor the sources of all feedstocks.
Pre-construction monitoring tasks include the establishment of baseline data for selected sites and
representative installations. Post-construction tasks include monitoring emissions from the
proposed waste biomass facility. Site visits will be conducted annually to determine any changes in
the greenhouse gas emission measurements and estimates.
B. Governmental approval
Item
Please check one of the following.
This report is a first report.
or
This report is an
intermediate report.
or
This report is a final report.
Please check one of the following:
This report is a joint
report. Letter(s) of approval of this report from the designated national authority of the other
Party(ies) involved in the activity is(are) attached in Section J, Annex.
or
This report is a separate report.
Additional comments (if any):
C. Compatibility with, and supportiveness of, national economic development and socioeconomic and
environmental priorities and strategies
Compatibility with Economic Development and Socioeconomic and Environmental Priorities
The Government of Honduras views the Bio-Gen Biomass Project as a key part of its plan to integrate
a portfolio of private sector renewable energy projects into the country's electricity grid to
help the country meet its current and future energy needs in a fiscally and environmentally
sustainable manner.
D. Environmental, social/cultural, and economic impacts of the AIJ project
Non-Greenhouse-Gas Environmental Impacts of the Project
Air Pollution: Particulate matter, the primary air pollutant to be emitted by the plant,
will be in compliance with World Bank lending standards. The remaining particulate emissions are
expected to be considerably less than those that currently result from open burning of logging and
processing waste.
Water Pollution: River sedimentation from road construction and site preparation will be
controlled using stormwater management techniques. Longer term impacts to the river will result
from water used in cooling and processing, and from process effluent discharge. If distributed
evenly, the effluent may increase the river temperature above ambient levels. If not evenly
distributed, a thermal plume may be created, potentially increasing growth of organisms near the
plant. Because of health hazards associated with such organisms, water quality conditions will be
monitored. The chemical composition of the effluent will be below accepted standards in the United
States. Wood ash produces no known inorganic materials that would be considered toxic.
Soil and Forest Resources: Erosion following construction of roads and alteration of site
topography may be minimized by the low slopes and thin, coarse-textured soils of the region.
Management of forest resources in connection with this project will be in accordance with current
COHDEFOR regulations.
Human Health: Air quality and therefore human health is expected to improve in the region
surrounding the plant due to decreased open burning of wood wastes by nearby mills.
Biodiversity: Because of controls imposed by the Honduran government, deforestation and
other habitat loss is not expected to significantly increase as a result of this project. Land that
will be cleared to construct the plant and to grow long-term energy plantations is considered to be
low in biodiversity and not critical to threatened or endangered species.
Transportation: Transportation of wood waste to the generating site will increase traffic,
road degradation, and noise and air pollution in the immediate vicinity. These effects will be
mitigated by increased road maintenance efforts and reductions in transport of wood wastes from
other mills to disposal sites.
Solid wastes: Solid wastes generated by the project facility (e.g., ash and trash) will be
disposed of locally and managed so as to minimize stormwater runoff and wind transport, and to
prevent fugitive dust from reaching workers at the project facility.
Social/Cultural Impacts of the Project
Solid wood waste from pine sawmills is utilized by local residents to produce salable secondary
wood products including bricks, building materials, and fences. Because volumes of waste and
incomes associated with the sale of secondary products are difficult to establish, no quantitative
or qualitative estimates of the degree of potential impacts are possible without more detailed
study.
Wood waste is also sold as firewood. In some areas, this is a common use of solid wood waste.
However, because of the high resin content of pine, other types of wood are preferred. Although
alternative sources of fuel are available, including kerosene, propane, and butane, these are
considerably more expensive than wood and necessitate purchase of a special stove.
Economic Impacts of the Project
The project will contribute to the economic development of Honduras by supplying renewable and more
reliable power to a local sawmill and the national utility. The present energy shortage in Honduras
requires ENEE to initiate selective power cuts per day, preventing sawmill owners from operating in
an efficient manner. Since lumber and secondary wood products are a major export commodity for
Honduras, the power shortages have a negative effect across the Honduran economy.
This project may also act as a catalyst to the formation of similar projects at other mills and
within other industries, allowing more industrial facilities to become increasingly self-sufficient
in their power supply. Conversely, the use of biomass to generate electricity may divert biomass
from local people who use it to produce salable items and generate income.
E. Greenhouse gas impacts of the AIJ project
1. Scenario description
Item
Site Designation
Site number (order of presentation in this report)
1 of 1
Site name/designation
Guaimaca
Project sector(s)
Energy, waste
Reference Scenario
Primary activity(ies)
Fossil fuel capacity expansion, uncontrolled burning and dumping of wood waste
Has the reference scenario changed since the last report? (If yes, explain any changes below.)
Yes
No
This is the first project report.
Description:
In the absence of the project, the project developers assume that ENEE would be required to meet
the increasing energy demand in Honduras by expanding its fossil fuel capacity. In addition,
sawmill and logging wastewood would continue to be disposed of through uncontrolled burning, or
dumped into rivers and low-lying areas where it would eventually decompose.
Predicted Project Scenario
Primary activity(ies)
Alternative energy generation (wood waste)
Description:
The Bio-Gen project will generate electricity by burning sawmill and logging wastewood through a
controlled combustion process. Electricity from the project facility will displace electricity that
would have otherwise been generated by new fossil fuel capacity. The project will also reduce
emissions from uncontrolled burning and decomposition of waste-wood.
Description of Calculation Methodology for the Reference Scenario
Reference case emission estimates are based on emissions from a fuel oil-fired plant that would
likely be constructed in the absence of the 15 MW Bio-Gen facility. Only CO2, the major
GHG that would be emitted, is estimated. Because data are currently not available on GHG emissions
from uncontrolled burning and decomposition of wastewood in Honduras, these emissions are not
included in the reference case either.
To estimated annual CO2 emissions from the displaced fossil fuel capacity, the
developers have assumed that approximately 260,423 lbs/hr of dry gas is emitted from a 15 MW fuel
oil-fired plant and that 13.4 percent of the dry gas emitted is CO2. This yields a
CO2 emission factor of 34,897 lbs/hr. Because the Bio-Gen plant will operate a minimum
of 7,500 hr/year, the reference case assumes the same number of hours of operation for the fossil
fuel plant.
Average annual reference case emissions are calculated by multiplying 34,897 lbs CO2/hr
by 7,500 hr/year. The result is then converted from pounds to metric tons by dividing by a
conversion factor of 2205 lbs/t. Using this methodology, it is estimated that 118,697 t
CO2/year are emitted due to fuel oil consumption in the reference case.
Description of Calculation Methodology for the Project Scenario
Under the project scenario, annual emissions result from burning sawmill and logging wastewood at
the Bio-Gen plant, but estimates of these emissions have not been derived. However, these emissions
are not expected to be greater than the reference scenario emissions from uncontrolled burning and
decomposition, which also have not been estimated. Therefore, annual project scenario emissions are
estimated as zero over the lifetime of the project.
Description of Calculation Methodology for the Actual Project
This information is not yet available.
3. GHG emission/sequestration data
(a) Reporting of GHG emissions/sequestration
(b) Additional information on GHG emissions/sequestration
Indirect or Secondary GHG Impacts (Positive and Negative)
The most significant secondary GHG impact will result from clearing trees and scrub to prepare the
project site for construction. The effect of such cutting in the overall carbon accounting is
minimal.
Factors That Could Cause the Future Loss or Reversal of GHG Benefits
Given the nature of this project-substitution of fossil fuel generated power with biomass
power-loss or reversal of benefits accrued will not be possible. Factors that may cause the loss of
projected emission reductions include natural disasters such as forest fires, hurricanes, etc.
Strategy for Reducing the Risk of Future Loss or Reversal of GHG Benefits
The project developer will take steps to minimize potential losses of future project benefits,
including obtaining insurance, assuring regular maintenance, and developing and implementing
inspection protocols.
F. Funding of the AIJ project
1. Identification of funding sources
Funding Source
Country ofFunding Source
Amount
($US)
Percentof TotalFunding(%)
Is This Funding Assured? (Y/N)
Nations Energy Corporation
U.S.A.
N
Maderas de Oriente
Honduras
N
Add-On Energy I
U.S.A.
N
Overseas Private Investment Corporation (OPIC)
U.S.A.
N
Export Import Bank of the United States (Ex-Im Bank)
U.S.A.
N
Inter-American Development Bank (IDB)
U.S.A.
N
International Finance Corporation (IFC)
U.S.A.
N
Total
2. Assessment of additional funding needs
Current or Planned Activities to Obtain Additional Funding
General project financing discussions involving the principals were held in Washington, D.C. with
the Overseas Private Investment Corporation (OPIC), the Export Import Bank of the United States
(Ex-Im Bank), the Inter-American Development Bank (IDB), and the International Finance Corporation
(IFC) on August 29 and August 30, 1995. Further discussions with regional and local banks have been
initiated. No information is available to determine whether any of the above organizations have or
plan to extend debt, equity, or insurance assistance to the project.
G. Contribution to capacity building and technology transfer
Contribution to Capacity Building and Technology Transfer
The project will transfer U.S. biofuel technology and give momentum to other biofuel projects, both
in Honduras and to the Central American region. The project will also transfer emission control
technology and showcase environmentally sound construction techniques.
H. Recent developments, technical difficulties, and obstacles encountered
Recent Project Developments
This information is not yet available.
Technical Difficulties and Other Obstacles Encountered
This information is not yet available.
I. Additional information
Additional Information
None.
J. Annex
1. Host country acceptance of the AIJ project
Country/Project Title
Name, Title, and Government Agencyof the DesignatedNational Authority
Date of Approval(day/month/year)
Honduras/Bio-Gen Biomass Power Generation Project
Dr. Carlos Medina, Minister of the Environment, Secretary of State, Department of the Environment