Annex I
UNIFORM REPORTING FORMAT:
ACTIVITIES IMPLEMENTED JOINTLY UNDER THE PILOT PHASE
List of
Projects
A. Description of project
1) Title of project:
Türi District Heating
2) Participants/actors:
Please fill in one table for each participant/actor. For individuals fill in as from item Function
within activity".
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Närings- och Teknikutvecklingsverket
|
|
Name of organization (English):
|
Swedish National Board for Industrial and Technical Development
|
|
Department:
|
Environmental Energy System in the Baltic Region and Eastern Europe.
|
|
Acronym:
|
NUTEK
|
|
Acronym (English):
|
NUTEK
|
|
Function within activity:
|
Assigned by the Swedish Government for Implementation including financing arrangements.
|
|
Street:
|
Liljeholmsvägen 32
|
|
Post code:
|
S-117 86
|
|
City:
|
Stockholm
|
|
Country:
|
Sweden
|
|
Telephone:
|
+46-8-681 96 07
|
|
Fax:
|
+46-8-681 96 67
|
|
E-mail:
|
gudrun.knutsson@nutek.se
|
|
WWW-URL:
|
http://www.nutek.se
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
Liib
|
|
First name, middle name:
|
Aili
|
|
Job title:
|
|
|
Direct tel:
|
+46-8-681 96 72
|
|
Direct fax:
|
+46-8-681 96 67
|
|
Direct E-mail:
|
aili.liib@nutek.se
|
|
Item
|
Please fill in if applicable
|
|
Name of organization(a):
|
Estonian co-reporter
|
|
Name of organization (English):
|
|
|
Department:
|
|
|
Acronym:
|
|
|
Acronym (English):
|
|
|
Function within activity:
|
(standard classifiers to be developed)
|
|
Street:
|
|
|
Post code:
|
|
|
City:
|
|
|
Country:
|
ESTONIA
|
|
Telephone:
|
|
|
Fax:
|
|
|
E-mail:
|
|
|
WWW-URL:
|
|
|
Contact person (for this activity):
|
-------------------------------------
|
|
Surname:
|
|
|
First name, middle name:
|
|
|
Job title:
|
|
|
Direct tel:
|
|
|
Direct fax:
|
|
|
Direct E-mail:
|
|
a) Organization includes: institutions, ministries, companies, non-governmental organizations, etc.
involved in the activity, i.e. research institutes associated with the project, auditors, government agency
closely following the activity.
3) Activity:
|
Item
|
Please fill in if applicable
|
|
General description:
|
Türi, the middle-size town in Estonia has several networks and four boiler plants. One of them
has earlier been converted to biofuel firing through a danish gift. The other boiler plants use
coal or heavy oil. Total energy need in town is approx. 30000 MWh.
|
|
Type of project:a)
|
energy saving in distribution and at end-users
|
|
Location (exact, e.g. city, region,
state):
|
Türi town
Türi County
Estonia
|
|
Activity starting date:
|
17. September 1996 (Loan agreement)
|
|
Expected activity ending date:
|
31. March 2006
|
|
Stage of activity:b)
|
completed
|
|
Lifetime of activity if different from ending date:c)
|
|
|
Technical data:d)
|
Substations (4-5 units) and control equipment for heat and hot tap-water.
The project also comprises interconnection of two separate district heating networks with 700 m
long preinsulated pipeline.
One boilerhouse has been closed.
|
a) For example, using Intergovernmental Panel on Climate Change (IPCC) classification: energy efficiency;
renewable energy; fuel switching; forest preservation, restoration or reforestation; afforestation;
fugitive gas capture; industrial processes; solvents; agriculture; waste disposal or bunker fuels.
b) Circle the appropriate option.
c) Methodological work will be required to define lifetime of activities.
d) Methodological work will be required to determine for each type of activity what the minimum data
requirements are.
4) Cost (to the extent possible):
|
Item
|
Year 0
= 1996
|
Year 1
= 1997
|
Year
3 -9
|
Year 10
|
|
Cost of the project in US$:
|
185795
|
|
|
|
|
AIJ component in US$:
|
185795
|
6700
|
|
|
|
US$ per avoided ton of CO2 equivalent:
|
20,41
|
21,15
|
|
|
Describe briefly how costs are determined:
The investment proper is calculated to be 124.882 USD and technical support 60.913 USD.
The lifetime or the project is foreseen to be minimum 10 years (corresponding to the maturity period of the
loan). The following definitions are used:
Cost for the project in year 0:
Costs for investment (= loan from NUTEK) and technical assistance (= grant from NUTEK) are summarized over
the investment period (up to the time for commissioning) and stated for year 0, being the year of the date
for commissioning.
Cost for the project in consequtive years:
Costs (i e possible costs for investment and costs of AIJ component character) are shown per calender year.
Year 1 represents part of the calender year after the date of commissioning.
AIJ component in year 0:
The costs for technical assistance up to commissioning have a clear character of AIJ component. The costs
for the investment can also be maintained to have the an AIJ character, as the loan is a cost for the host
country, and as the loan represents a business risk for the financier, NUTEK.
AIJ component in consequtive years:
Consist a o of the following parts:
1. Costs for follow-up after the date of commissioning (information exchange to secure a high utilisation
of the investment + costs for measuring and reporting to FCCC). The cost for follow-up for the years up to
and including 1996 is calculated by dividing NUTEKs total costs for follow-up by the total years of
operation of all NUTEK-financed projects.
2. Difference between a market interest rate and the favourable interest rate (STIBOR) which NUTEK applies.
This can be settled between the co-reporting parties annually.
3. Business risk.
US $ per avoided ton of CO2 equivalent equals:
- at year 0 the cost of the project/AIJ component cost divided by the projected decrease in CO2
emission over the 10 year lifetime of the project
- for consequtive years the cost of the project/AIJ component divided by actual figure for decrease of
CO2 emission for each of the years 1 - 10.
Note: Possible costs for organisations in the host country may be suggested by the co-reporter in the host
country.
5) Mutually agreed assessment procedures:
|
Describe the procedures, including name of organizations involveda):
|
|
It is intended that upon agreement with a central Estonian authority on reporting of JI-projects,
this authority will assign a local organisation, which will be involved in the evaluation of the
climate effects of this project. After an initial work in cooperation with NUTEKís assigned
consultant, this local organisation will take the main responsibility the continued measuring for
JI-reporting.
|
a) Please ensure that detailed contact information for all organizations mentioned is reported under
section A.2 above.
B. Governmental acceptance, approval or endorsement
Bearing in mind that all activities implemented jointly under this pilot phase require prior acceptance,
approval or endorsement by the Governments of the Parties participating in these activities, which shall be
shown as follows:
(a) In the case of joint reporting, the report is submitted by the designated national authority of one
participating Party with the concurrence of all other participating Parties as evidenced by attached
letters issued by the relevant national authorities;
(b) In the case of separate reporting, the reports are submitted separately by the designated national
authority of each and every participating Party. Information will only be compiled once reports have been
received from all participating Parties.
1) For the activity:
* First report and joint reporting: Agreement with designated national authority is planned to be
signed summer or autumn 1997.
* Subsequent reports:
Activity was: suspended
terminated earlier
Describe:
2) This report is a joint report:
Yes, Agreement with designated national authority is planned to be signed summer or autumn 1997.
No
3) General short comment by the government(s) if applicable:
Comment by the Swedish government
The Swedish Parliament decided already in 1993 to establish a program for what was later to be known as AIJ
projects.
The decision stemmed from the perception that Swedish mitigation costs were relativeliy high when compared
to most countries especially some of our neighbouring countries Acccordingly, Swedish policy against
climate change should include promotion of activities in these countries.
The relatively high mitigation costs in Sweden are caused by a high share of non-fossil energy in the
energy balance, efficient use of energy due to high carbon dioxide taxes and programmes for the
introduction of renewables as well as for increased energy efficiency. (The background is more fully
described in the Swedish national report to the FCCC)
In the bill leading to the establishment of the programme now reported the minister of energy in 1993
declared that Sweden immediatelly should take action to assist the Baltic countries to make their energy
system more efficient. Such actions were seen to be in accordance with the notion of JI as conveyed in the
FCCC. They should also contribute to the cost-effectiveness of Swedish measures against climate change .
The minister also underlined in his message to the Parliament that Sweden should have a pragmatic approach
in her climate change policy
That the criteria for JI were not yet determined when the programme was launched was not to be considered
as any obstacle for the promotion and introduction of Swedish climate change policy initiatives in the
Baltic countries, Poland and other East European countries. Such measures should be seen as an initial step
towards an efficient, sustainable and equitable international climate strategy.
In the Swedish energy agreement of 1997 it was concluded that "Sweden shall, as a member of the
European Union, work towards a common climate policy and should actively promote international cooperation
in the climatic field. In particular, Sweden shall engage in the development of efficient policy means
within the framework of the climate policy of EU and the Framework Convention on Climatic Change. Sweden
should also cooperate with other countries in the way envisaged by the Climate Comvention, through so
called joint implementation."
C. Compatibility with and supportiveness of national economic development and socio economic and
environment priorities and strategies
|
Describe (to the extent possible) how the activity is compatible with and supportive of national
economic development and socio economic and environment priorities and strategies
|
|
The project meets the following objectives in the Estonian Energy Law:
- efficient use of energy resources;
- creation and usage of energy efficient technologies, fuel/energy consuming and diagnostic
equipment, construction and insulation materials; energy flow metering and control devices,
automated energy consumption control systems;
|
D. Benefits derived from the activities implemented jointly project
Whenever possible, quantitative information should be provided. Failing that, a qualitative description
should be given. If quantitative information becomes available, it could be submitted using the update(s).
(If the amount of quantative information is too large, the source could be indicated.)
|
Item
|
Please fill in
|
|
Describe environmental benefits in detail:
|
Annual emissions reduction
910 ton CO2
3.5 ton SO2
1.2 ton NOx
Decrease of local pollution (one coalfired boilerplant has been closed down, the energy is supplied
from biofuel fired boilerplant)
|
|
Do quantitative data exist for evaluation of environmental benefits?
|
No
|
|
Describe social/cultural benefits in detail:
|
More stable heat supply to customers
|
|
Do quantitative data exist for evaluation of social benefits?
|
No
|
|
Describe economic benefits in detail:
|
Decreased energy consumption
Energy use can now be billed, based upon measured figures
|
|
Do quantitative data exist for evaluation of economic benefits?
|
No
|
E. Calculation of the contribution of activities implemented jointly projects that bring about real,
measurable and long-term environmental benefits related to the mitigation of climate change that would not
have occurred in the absence of such activities
1) Estimated emissions without the activity (project baseline):
Description of the baseline or reference scenario, including methodologies applied:
The reference scenario represents at status quo situation. The decrease in energy consumption that followed
after 1990 is assumed to have reached full impact, meaning a stable heat consumption over the life-time of
the project. Loan from NUTEK is so far one of the very few sources to finance this type of investments for
municipalities in Estonia. As this would imply that an alternative investment would not have taken place,
neither the consequence of another investment, nor the consequence of an alternative technical solutions
are considered.î
2) Estimated emissions with the activity:
Description of the scenario, including methodologies applied:
Cf. E.1. above.
Fill in the following tables as applicable:
Summary table: Projected emission reductions:
|
GHG
|
Year 1
|
Year 2
|
...
|
Year 10
|
|
A) Project baseline scenario
|
CO2
|
910
|
910
|
|
910
|
|
CH4
|
-
|
|
|
|
|
N2O
|
-
|
|
|
|
|
other
|
-
|
|
|
|
|
B) Project activity scenarioa)
|
CO2
|
0
|
0
|
|
0
|
|
CH4
|
-
|
|
|
|
|
N2O
|
-
|
|
|
|
|
other
|
-
|
|
|
|
|
C) Effect ( B-A )
|
CO2
|
-910
|
-910
|
|
-910
|
|
CH4
|
-
|
|
|
|
|
N2O
|
-
|
|
|
|
|
Other
|
-
|
|
|
|
|
D) Cumulative effect
|
CO2
|
-910
|
-1820
|
|
-9100
|
|
CH4
|
-
|
|
|
|
|
N2O
|
-
|
|
|
|
|
Other
|
-
|
|
|
|
a) Includes indirect GHG leakages.
Summary table: Actual emission reductions:
|
GHG
|
Year 1
= 1997
|
Year 2
|
...
|
Year X
|
|
A) Project baseline scenario
|
CO2
|
|
|
|
|
|
CH4
|
|
|
|
|
|
N2O
|
|
|
|
|
|
other
|
|
|
|
|
|
B) Project activity scenarioa)
|
CO2
|
|
|
|
|
|
CH4
|
|
|
|
|
|
N2O
|
|
|
|
|
|
other
|
|
|
|
|
|
C) Effect ( B-A )
|
CO2
|
|
|
|
|
|
CH4
|
|
|
|
|
|
N2O
|
|
|
|
|
|
Other
|
|
|
|
|
|
D) Cumulative effect
|
CO2
|
|
|
|
|
|
CH4
|
|
|
|
|
|
N2O
|
|
|
|
|
|
Other
|
|
|
|
|
a) Includes indirect GHG leakages.
F. Additionality to financial obligations of Parties included in Annex II to the Convention within the
framework of the financial mechanism as well as to current official development assistance flows
Please indicate all sources of project funding.
|
Category of funding
(For each source one line)
|
Amount
(US dollars)
|
|
Loan from NUTEK
|
124882 USD
|
|
Grant from NUTEK for technical assistans
|
60913 USD
|
1 USD = 7.50 SEK
G. Contribution to capacity building, transfer of environmentally sound technologies and know-how to
other Parties, particularly developing country Parties, to enable them to implement the provisions of the
Convention. In this process, the developed country Parties shall support the development and enhancement of
endogenous capacities and technologies of developing country Parties
|
Transfer of environmentally sound technologies and know-how
|
Describe briefly
|
|
Schematically, the transfer of knowledge involves the following activities over time:
i) Technology transfer through NUTEKs technical specialist during the implementation of the
project.
ii) Technology transfer through cooperation between foreign supplier and local partner
iii) Conferences, seminars, documentation and training.
iv) Stimulate înet-workingî for the exchange of experience between plant owners with
similar problems, e g îbio-clubsî
|
technology transfer has taken place through
i) NUTEKs technical specialist support to the local project leader and municipality.
iii) personal from boilerplant has been invited to different seminars and work-shops, documentation
for training has been handed ower
|
Endogenous capacity supported or enhanced:
|
Endogenous capacity
(Name of organization1)
|
Development (DEV) /
enhancement (ENH)
|
Describe briefly
|
|
(DEV or ENH)
|
|
1) Please ensure that detailed contact information for all organizations listed is reported under section
A.2 above.
H. Additional comments, if any, including any practical experience gained or technical difficulties,
effects, impacts or other obstacles encountered
Fill in as appropriate:
1) Any practical experience gained:
2) Technical difficulties:
3) Effects encountered:
4) Impacts encountered:
5) Other obstacles encountered:
6) Other: