Activities Implemented Jointly Under the Pilot Phase
A. Description of the AIJ project
1. Title of project: Doña Julia Hydroelectric Project
2. Host country: Costa Rica
3. Brief project description:
The Doña Julia Hydroelectric Project involves the construction and operation of a privately-owned and operated
16 megawatt (MW) hydroelectric plant that is expected to produce an estimated 83 gigawatthours (GWh) to 87.8 GWh of
electricity per year, using the waters from the Puerto Viejo River and Quebradon Creek. The project will displace
electricity and greenhouse gas (GHG) emissions currently produced by thermal fossil fuel-burning facilities. The
project facility became operational in October of 1996. Electricity generated by the project facility is being sold
to the Costa Rican Institute of Electricity (ICE).
Note: Although the information contained in this report is based on the USIJI project proposal and other material
provided by the project developer, the developer has not yet reviewed this document.
4. Participants:
Name of Organization or Individual
Country
Compañía Hidroeléctrica Doña Julia
Costa Rica
The New World Power Corporation
U.S.A.
Item
Please Complete If Applicable
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
Compañía Hidroeléctrica Doña Julia
Name of organization (English)
Acronym (original language)
Acronym (English)
Department
Function(s) within the AIJ project activities
Project administration, owner and operator of facility
Street
P.O. Box 1420-3000
City
Heredia
State
Post code
Country
Costa Rica
Telephone
Fax
E-mail
World Wide Web-URL address
Administrative Officer Responsible for the Project
Surname
Corrales
First name, middle name
Carlos
Job title
Executive Director
Direct telephone
506-260-2433
Direct fax
506-237-4583
Direct e-mail
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
Item
Please Complete If Applicable
Organization
Name of organization (original language)
or
Name of individual if unaffiliated with any organization
The New World Power Corporation
Name of organization (English)
(Same as above)
Acronym (original language)
Acronym (English)
Department
Function(s) within the AIJ project activities
Project development, financing
Street
558 Lime Rock Road
City
Lime Rock
State
Connecticut
Post code
06039
Country
U.S.A.
Telephone
Fax
E-mail
World Wide Web-URL address
Administrative Officer Responsible for the Project
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
Contact Person for AIJ Activities (if different from the Administrative Officer)
Surname
First name, middle name
Job title
Direct telephone
Direct fax
Direct e-mail
5. Description of AIJ project activities
Item
Type of Project
Sector(s)
Energy
Primary activity(ies)
Alternative energy generation (hydroelectric)
Project Location
Country
Costa Rica
Exact location (city, state, region)
Colonia Cubujuquí, Horquetas District, Sarapiquí Cantón, Province of Heredia, Republic of
Costa Rica
Key Dates and Current Stage of Project
Project starting date (month/year)
October 1996
Project ending date (month/year)
September 2011
Project lifetime (years)
15 (with possible 5 year extensions)
Current stage of project
In progress
General Project Description and Technical Data
The Doña Julia Hydroelectric project involves the construction and operation of a 16 megawatt (MW)
hydroelectric plant that is expected to produce an estimated 83 GWh to 87.8 GWh of electricity per year,
using the waters from the Puerto Viejo River and Quebradon Creek. This hydro-generated power will displace
electricity that would have been generated using thermal units that burn primarily high-sulfur diesel fuel,
fuel oil, and IFO 180 fuel. Historically, Costa Rica has used fossil fuels as a marginal source of power
during peak periods, but because of increased demand, fossil fuel generating plants are operating almost
continuously. The project facility became operational in October 1996. Electricity generated by the
facility is being sold to the Costa Rican Institute of Electricity (ICE).
6. Cost
(a) Explanation of methodology for calculating cost data
Methodology for Calculating Cost Data
The estimated total project cost is $28 million. The full capitalized costs of the project have been
financed with a combination of debt (70%) and equity (30%).
(b) Cost data-Project development
This information is not yet available.
(c) Cost data-Project implementation
This information is not yet available.
7. Monitoring and verification of AIJ project activities and results
Item
Party(ies) that will be monitoring project activities
Compañía Hidroeléctrica Doña Julia
Party(ies) that will be externally verifying project results
This information is not yet available.
Date when the monitoring plan became (or will become) operational (month/year)
First half of 1997
Types of data that will be collected
Total fossil fuel use for the generation of electricity
Description of Monitoring and Verification Activities and Schedule for Implementation
The Costa Rican Ministry of Environment and Energy (MINAE), through its Office of Energy Policy (DSE), will
make available on an annual basis data Costa Rica's total fossil fuel use for the generation of
electricity in the previous year. This information will be published within the first six months of the
year following the year indicated within the fossil fuel consumption data. Compañía
Hidroeléctrica Doña Julia, using conversion tables supplied by MINAE, or any other source they
prefer, will convert the DSE-supplied information to develop a total and accurate GHG displacement profile
for the project lifetime.
Monitoring will take place on a regular and constant basis in accordance with the Project Power Purchasing
Agreement between the Doña Julia Hydroelectric Project and ICE. The development of offset information
by the project will be completed by the month of September, with technical assistance and data provided by
MINAE and ICE.
The participants in this project agree to independent, external verification of the information presented
in the proposal, excluding confidential business information. The participants welcome inspection by
members of the Panel or their designees to verify the accuracy of all data related to emission reductions
and the appropriateness of any procedures or methodologies utilized to determine such reductions. In
addition, the developer has expressed willingness to arrange a cooperative agreement with an
internationally recognized environmental advocacy organization to verify the procedures and methodologies
used. A verification schedule has not yet been developed.
B. Governmental approval
Item
Please check one of the following.
This report is a first report.
or
This report is an intermediate
report.
or
This report is a final report.
Please check one of the following:
This report is a joint report.
Letter(s) of approval of this report from the designated national authority of the other Party(ies)
involved in the activity is(are) attached in Section J, Annex.
or
This report is a separate report.
Additional comments (if any):
C. Compatibility with, and supportiveness of, national economic development and socioeconomic and environmental
priorities and strategies
Compatibility with Economic Development and Socioeconomic and Environmental Priorities
In a letter dated July 26, 1995, René Castro S., Minister of MIRENEM, indicated that the project would
"undoubtedly meet Costa Rica's sustainable development goals by allowing for the diversification
of [Costa Rica's] energy resources and by bringing [Costa Rica] closer to its goal of satisfying
current and future energy needs with a diverse portfolio of clean, renewable, and environmentally-sound
energy sources." The project also helps to achieve Costa Rica's goal of 100% renewable electricity
generation by 2001. This goal is intended to fulfill the country's commitments under the Framework
Convention on Climate Change (FCCC), the Biodiversity Convention, and Agenda 21.
D. Environmental, social/cultural, and economic impacts of the AIJ project
Non-Greenhouse-Gas Environmental Impacts of the Project
Hydroelectric projects involve major modifications of natural environments that generally have important
side effects, both positive and negative. The negative effects include obstacles to fish migration,
disruption of natural ecosystems by changing river regimes, changes in land use via construction of roads
and transmission lines, sedimentation upstream of the dam, and river bed erosion downstream. Positive
effects include mitigation of floods, creation on new habitats for some animal species, recreation, and the
improvement of transport in rural areas by new roads.
Social/Cultural Impacts of the Project
This information is not yet available.
Economic Impacts of the Project
The project will provide employment during both the construction and operational phases. According to the
developer, the project also will attract foreign capital investment while providing protection from rising
fuel prices, and will help ICE diversify its electricity generation portfolio.
E. Greenhouse gas impacts of the AIJ project
1. Scenario description
Item
Site Designation
Site number (order of presentation in this report)
1 of 1
Site name/designation
Doña Julia Hydroelectric Project
Project sector
Energy
Reference Scenario
Primary activity(ies)
Electricity generation from fossil fuels
Has the reference scenario changed since the last report? (If yes, explain any changes below.)
Yes
No
This is the first project report.
Description:
Without the project, the percentage of total electricity demand-and associated greenhouse gas (GHG)
emissions-provided by fossil fuels will not be displaced by the additional hydroelectric resource.
Thermal units in Costa Rica were originally designed to meet only peak demand, while hydroelectric systems
were intended to meet base load demand (hydroelectric is preferred because it is half the cost of thermal
generation). However, decreased reliability of hydroelectric plants resulting from El Niño drought
conditions has forced ICE to rely more heavily on thermal units to meet base load demand. At the same time,
energy demand in Costa Rica is growing at a rate of 7 to 9 percent annually. This rapid growth has put
pressure on ICE to continue to expand its current capacity. In September 1994, the Minister of MIRENEM
announced the goal to meet all electricity needs in Costa Rica with renewable energy sources by 2001. While
this goal is intended to fulfill commitments under the Framework Convention on Climate Change (FCCC), the
Biodiversity Convention, and Agenda 21, current energy demand and supply conditions suggest that such a
phase-out may be delayed.
In light of ambiguities created by drought and potential conflicts between policy goals and actual utility
expansion plans, the proposal provides a broad picture of future GHG emissions in Costa Rica by presenting
two sets of reference case projections: one developed by ICE and USAID in 1992, and an
"alternative" projection incorporating 1994 fossil fuel consumption data and the September 1994
Costa Rican government policy goals to phase-out fossil fuels. The "alternative" reference
scenario is presented in this report simply because it leads to a lower estimate of net project benefits
and, hence, is more conservative. The "alternative" reference scenario is based on the assumption
that consumption of diesel and fuel oil for the electricity generation in Costa Rica will remain at 1994
levels through 1997 and then decline to zero by 2001.
Predicted Project Scenario
Primary activity(ies)
Alternative energy generation (hydroelectric)
Description:
The project will annually displace an estimated 83 to 87.8 GWh of electricity currently produced by the
burning of fossil fuel. (Total output from thermal plants in 1994 was 829.8 GWh.)
The site location is in the northern zone of Costa Rica, a highly precipitous region with annual rainfall
of up to 8000 mm/year. The river flow variation during the course of the year is minimal, so the plant will
be able to effectively manage the water resource year round. During periods when other hydroelectric
facilities are experiencing low water supplies, the Doña Julia Project will be operational and will
effectively displace CO2 emissions that otherwise would have been generated from burning fossil
fuels. However, emissions in the project scenario occur only until 2001 because all fossil fuel-based
generation is expected to be replaced by renewable energy resources by that year.
Description of Calculation Methodology for the Reference Scenario
The reference case is based on historic and projected emissions from consumption of diesel and fuel oil
used to power Costa Rica's generating plants. The developer assumes that the consumption of diesel and
fuel oil will remain at 1994 levels through 1997. This is fully consistent with the MIRENEM Minister's
announced goal to phase out fossil fuel by 2001, according to which fossil fuel consumption is expected to
decline beginning in 1998 until it is totally eliminated by 2001. Based on Costa Rica's fossil fuel
phase-out plan, emissions from fossil fuel consumption are expected to be reduced by approximately 33
percent by 1998, 66 percent by 1999, 99 percent by 2000, and 100 percent by 2001, relative to 1994
levels.
Estimated 1994 fossil fuel emissions were based on the quantities of diesel and fuel oil consumed in Costa
Rica in 1994: 71,430,126 and 9,636,099 gallons, respectively. Emissions from diesel fuel were derived by
multiplying the amount of fuel consumed by the heat content of diesel fuel and by a diesel fuel
CO2 emissions factor. For diesel fuel, emissions are therefore estimated as 751,696 t
CO2 (= 71,430,126 gal * 0.145x106 Btu/gal * 0.0726 t CO2/106
Btu). Emissions from fuel oil were calculated using the same method, but with a heat content of
0.150x106 Btu/gal and a CO2 emissions factor of 0.0762 t
CO2/106 Btu. Thus, for fuel oil, emissions equal 110,147 t CO2 (=
9,636,099 gal * 0.150x106 Btu/gal * 0.0762 t CO2/106 Btu). The emissions
from both fuels were summed to obtain total 1994 emissions of 861,843 t CO2 (= 751,696 t
CO2 + 110,147 t CO2).
Description of Calculation Methodology for the Project Scenario
Because there are no emissions associated with hydroelectric power, emissions in the project scenario
represent Costa Rican fossil fuel electricity generation that is not displaced by the project's
generation. The estimation methodology calculates the displaced generation (i.e., net project benefits),
not the remaining generation.
Net project benefits are the avoided emissions from displaced fossil fuel. Beginning in 1996, net project
benefits in a given year are estimated as the ratio of the plant's projected annual electricity
generation (90 GWh) to total Costa Rican fossil fuel electricity generation in 1994 (829.8 GWh), multiplied
by reference case emissions in that year. Because of the anticipated phase-out of fossil fuel plants,
emission reductions decline annually until they reach zero in 2001. By calculating an annual reduction in
net project carbon benefits based on the phase-out of fossil fuels, the project attempts to avoid
double-counting emission reductions that may be claimed by other hydroelectric and wind projects in Costa
Rica. (Reductions in the first year are multiplied by 3/12 to account for the fact that the plant came
on-line in October of that year.) Net project benefits (emission reductions) are calculated as
follows:
YearCalculation for Net Project Benefits
1 (1996) (90 GWh/ 829.8 GWh)(861,843 t CO2) * 3/12
2 (1997) (90 GWh/ 829.8 GWh)(861,843 t CO2)
3 (1998) (90 GWh/ 829.8 GWh)(574,942 t CO2)
4 (1999) (90 GWh/ 829.8 GWh)(288,041 t CO2)
5 (2000) (90 GWh/ 829.8 GWh)(1,138 t CO2)
6 (2001) (90 GWh/ 829.8 GWh)(0 t CO2)
Note that emission reductions for Year 1 (1996) have been estimated at 3/12 of 1997 levels to reflect the
date at which the facility came on-line (October 1996). Annual project scenario emissions are calculated by
subtracting annual net project benefits from annual reference scenario emissions.
Description of Calculation Methodology for the Actual Project
This information is not yet available.
3. GHG emission/sequestration data
(a) Reporting of GHG emissions/sequestration
(b) Additional information on GHG emissions/sequestration
Indirect or Secondary GHG Impacts (Positive and Negative)
The major secondary GHG impact has resulted from clearing approximately two hectares of forest land at the
project site to prepare for construction. However, the effect of such cutting in the overall carbon
accounting is minimal.
Factors That Could Cause the Future Loss or Reversal of GHG Benefits
Given the nature of this project-substitution of fossil fuel generated power with hydroelectric power-loss
or reversal of benefits that have been achieved is not possible. Factors that may cause a loss of projected
emission reductions include natural disasters such as earthquakes, hurricanes, etc.
Strategy for Reducing the Risk of Future Loss or Reversal of GHG Benefits
The project developers will undertake several steps to minimize potential losses of project benefits. These
include obtaining insurance, assuring regular maintenance, and developing and implementing inspection
protocols.
F. Funding of the AIJ project
1. Identification of funding sources
(a) Funding sources for project development
This information is not yet available.
(b) Funding sources for project implementation
Funding Source
Country ofFunding Source
Amount
($US)
Percentof TotalFunding(%)
Is This Funding Assured? (Y/N)
Total
28,000,000
100
2. Assessment of additional funding needs
Current or Planned Activities to Obtain Additional Funding
This information is not yet available.
G. Contribution to capacity building and technology transfer
Contribution to Capacity Building and Technology Transfer
The project contributes to capacity building by expanding the application of renewable energy technologies
in Costa Rica, and thereby reducing reliance on fossil fuels.
H. Recent developments, technical difficulties, and obstacles encountered
Recent Project Developments
This information is not yet available.
Technical Difficulties and Other Obstacles Encountered
This information is not yet available.
I. Additional information
Additional Information
None.
J. Annex
1. Host country acceptance of the AIJ project
Country/Project Title
Name, Title, and Government Agency of the DesignatedNational Authority
Date of Approval(day/month/year)
Costa Rica/Doña Julia Hydroelectric Project
René Castro S., Minister, Ministry of Natural Resources, Energy and Mines (MIRENEM - now MINAE)