NAPAs contain a list of ranked priority adaptation activities and projects, as well as short profiles of each activity or project, designed to facilitate the development of proposals for implementation. To facilitate access to this information based on the NAPAs that have been submitted to date, below are listings of projects grouped by country and according to main sectors for which an activity falls. Some projects and activities are very cross-sectoral in nature, and difficult to classify into any one sector. Such projects have been put into a 'cross-sectoral' group. The information is given below for project titles by country, as well as downloadable as files in the Adobe portable document format (pdf).
Lists of NAPA Priority Projects by country showing the indicated project cost and a downloadable file, when available, which contains the list of projects
Afghanistan
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Improved water management and use efficiency
|
2,200,000
|
2
|
Community based watershed management
|
2,200,000
|
Angola
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Promote alternative renewable energies to avoid deforestation*
|
3,500,000
|
2
|
Promote SLM for increased agricultural yields*
|
5,000,000
|
3
|
Ensure basic access to health services and health monitoring*
|
3,000,000
|
4
|
Study the vulnerability of the fisheries sector in relation to climate change and current modifications*
|
2,000,000
|
5
|
Extend electricity grid to rural areas*
|
5,000,000
|
6
|
Revise sectoral laws for proactive adaptation
|
2,000,000
|
7
|
Create an early warning system for flooding and storms
|
3,500,000
|
8
|
National institutional mechanism for adaptation planning and mainstreaming
|
2,000,000
|
9
|
Soil erosion control through organic methods
|
4,000,000
|
10
|
Diversify crops to less climate sensitive cultures
|
3,000,000
|
11
|
Technology needs assessment
|
500,000
|
12
|
Locally available adapted seed varieties
|
5,000,000
|
13
|
Climate monitoring and data management system
|
17,500,000
|
14
|
Study the implication of climate change on disease patterns for humans and livestock
|
1,500,000
|
15
|
Increase water availability through village-level wells and boreholes
|
5,000,000
|
* Priority project for which a project profile has been developed
Bangladesh
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Reduction of Climate Change Hazards through Coastal afforestation with community participation
|
23,000,000
|
2
|
Providing drinking water to coastal communities to combat enhanced salinity due to sea level rise
|
1,525,000
|
3
|
Capacity building for integrating Climate Change in planning, designing of infrastructure, conflict management and land-water zoning for water management institutions
|
5,050,000
|
4
|
Climate change and adaptation information dissemination to vulnerable community for emergency preparedness measures and awareness raising on enhanced climatic disasters
|
7,050,000
|
5
|
Construction of flood shelter, and information and assistance centre to cope with enhanced recurrent floods in major floodplains
|
5,050,000
|
6
|
Mainstreaming adaptation to climate change into policies and programmes in different sectors (focusing on disaster management, water, agriculture, health and industry)
|
1,025,000
|
7
|
Inclusion of climate change issues in curriculum at secondary and tertiary educational institution
|
525,000
|
8
|
Enhancing resilience of urban infrastructure and industries to impacts of climate change
|
2,025,000
|
9
|
Development of eco-specific adaptive knowledge (including indigenous knowledge) on adaptation to climate variability to enhance adaptive capacity for future climate change
|
5,050,000
|
10
|
Promotion of research on drought, flood and saline tolerant varieties of crops to facilitate adaptation in future
|
5,050,000
|
11
|
Promoting adaptation to coastal crop agriculture to combat increased salinity
|
6,550,000
|
12
|
Adaptation to agriculture systems in areas prone to enhanced flash flooding-North East and Central Region
|
6,550,000
|
13
|
Adaptation to fisheries in areas prone to enhanced flooding in North East and Central Region through adaptive and diversified fish culture practices
|
4,550,000
|
14
|
Promoting adaptation to coastal fisheries through culture of salt tolerant fish special in coastal areas of Bangladesh
|
4,050,000
|
15
|
Exploring options for insurance to cope with enhanced climatic disasters
|
225,000
|
Benin - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Implementation of a forecasting system for early warning and climatic risks for food security in four (4) vulnerable agroecological regions
|
8,190,000
|
2
|
Adaptation of households to climate change through awareness-raising and capacity building on the use of renewable energy (solar energy) and energy-efficient stoves in the areas vulnerable to climate change and with highly degraded soils
|
2,106,600
|
3
|
Exploitation of surface water as a means to adapt to climate change in the most vulnerable areas in the Centre and North Provinces
|
2,875,000
|
4
|
Protection of children under five (5) and pregnant women against malaria in the areas most vulnerable to climate change
|
1,112,500
|
5
|
Protection of coastal areas against sea level rise
|
1,296,000
|
Bhutan - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Disaster Management Strategy - planning for food security and emergency medicine to vulnerable communities
|
619,110
|
2
|
Artificial Lowering of Thorthomi Lake
|
3,188,942
|
3
|
Weather Forecasting System to Serve Farmers and Agriculture
|
420,000
|
4
|
Landslide Management & Flood Prevention (Pilot Schemes in Critical Areas)
|
894,179
|
5
|
Flood Protection of Downstream Industrial and Agricultural Areas
|
453,488
|
6
|
Rainwater Harvesting
|
895,000
|
7
|
GLOF Hazard Zoning (Pilot Scheme - Chamkhar Chu Basin)
|
232,493
|
8
|
Installation of Early Warning System on Pho Chu Basin
|
400,000
|
9
|
Promote Community-based Forest Fire Management and Prevention
|
423,000
|
Burkina Faso - Project Profile (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Mitigating vulnerability to Climate Changes through the strengthening of a prevention and food crisis management system
|
400,000
|
2
|
Securing cereal production through the promotion of supplemental irrigation in the following areas: North Region (Oudalan Province) and Centre-North region (Namentenga Province)
|
408,660
|
3
|
Restoration and management of Oursi pond
|
275,000
|
4
|
Fodder production and development of fodder stocks for livestock in the Sahelian Region of Burkina Faso
|
330,000
|
5
|
Rehabilitation, sustainable management of natural vegetation, and valorisation of Non-timber Forest Products in the Eastern region of Burkina Faso
|
700,000
|
6
|
Control of sand encroachment/mud silting in the river basins of Mouhoun, Nakanbe and Comoe
|
352,000
|
7
|
Implementation of irrigated crops in Gourma, Namentenga, Tapoa and Sanmatnga regions
|
443,300
|
8
|
Protection of pastoral-suited regions in the Sahelian and Eastern regions
|
320,000
|
9
|
Securing agricultural production through the use of appropriate technological packages in the South-East and East regions
|
297,924
|
10
|
Promoting community-based fauna management in the Mouhoun region
|
810,000
|
11
|
Implementation of safety zones and backup devices to control pollution of underground and surface water catchment infrastructures (lakes, wells, boreholes) in the cotton belts of Burkina (Mouhoun, South-West, Comoe and the Easetern part of Nakanbe)
|
330,000
|
12
|
Promoting the use of energy saving equipment (improved stoves, M'Bora stew pan) and renewable energy-based technologies (pressure-cooker, water heater and solar dryers, etc.)
|
1,230,000
|
Burundi - Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Improvement of seasonal early warning climate forecasts
|
500,000
|
2
|
Rehabilitation of degraded areas
|
500,000
|
3
|
Safeguarding of the natural environments
|
200,000.00
|
4
|
Rainwater Valorisation
|
1,000,000
|
5
|
Erosion control in the region of Mumirwa
|
600,000
|
6
|
Protection of buffer zones in Lake Tanganyika floodplain and around the lakes of Bugesera
|
200,000
|
7
|
Popularisation of short cycle and drought resistant food crops
|
294,000
|
8
|
Zero grazing technique
|
300,000
|
9
|
Capacity building to promote energy-wood saving techniques
|
700,000
|
10
|
Stabilisation of river dynamics of watercourses and torrents in Mumirwa, including the city of Bujumbura
|
2,000,000
|
11
|
Education on climate change adaptation
|
500,000
|
12
|
Increase hydropower micro stations
|
500,000
|
Cambodia - Priority Project Profiles
|
Priority Project Number
|
Prority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Rehabilitation of a Multiple Use Reservoir in Takeo Province
|
4,000,000
|
2
|
Rehabilitation of Multiple Use Dams in Takeo and Kampong Speu Provinces
|
2,500,000
|
3
|
Community and Household Water Supply in Coastal Provinces
|
1,000,000
|
4
|
Development and Rehabilitation of Flood Protection Dykes
|
5,000,000
|
5
|
Rehabilitation of Upper Mekong and Provincial Waterways
|
30,000,000
|
6
|
Rehabilitation of Multiple-Use Canals in Banteay Meas District, Kampot Province
|
1,500,000
|
7
|
Vegetation Planting for Flood and Windstorm Protection
|
4,000,000
|
8
|
Strengthening of Community Disaster Preparedness and Response Capacity
|
5,000,000
|
9
|
Water Gates and Water Culverts Construction
|
10,000,000
|
10
|
Safer Water Supply for Rural Communities
|
5,000,000
|
11
|
Development and Improvement of Small-Scale Aquaculture Ponds
|
4,000,000
|
12
|
Promotion of Household Integrated Farming
|
2,500,000
|
13
|
Rehabilitation of Coastal Protection Infrastructure
|
2,000,000
|
14
|
Development and Improvement of Community Irrigation Systems
|
45,000,000
|
15
|
Community Mangrove Restoration and Sustainable Use of Natural Resources
|
1,000,000
|
16
|
Community Based Agricultural Soil Conservation in Srae Ambel District, Koh Kong Province
|
2,000,000
|
17
|
Production of Biopesticides
|
3,000,000
|
18
|
Development of Healthcare Centres and Posts
|
750,000
|
19
|
Provision of Safe Water in High Risk Malaria Regions
|
100,000
|
20
|
Malaria Education and Mosquito Habitat Clearance Campaigns
|
500,000
|
Cape Verde - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Mobilization and integrated water resource management project
|
13,680,000
|
2
|
Modernization and diversification of agricultual production for food security improvement
|
1,500,000
|
3
|
Integrated Protection and management of coastal zones
|
1,500,000
|
Central African Republic - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Building community institutional capacities for eco-development
|
250,000
|
2
|
Promoting urban and suburban forests
|
250,000
|
3
|
Management of the native vegetation for the restoration of degraded pastoral areas in Bossemptele
|
250,000
|
4
|
Community Participation in the reforestation and forest management in Southeast of Ombella M'Poko
|
250,000
|
5
|
Implementation of climate change-resistant varieties in the Centre, North and Southeast of the country
|
250,000
|
6
|
Promotion of the carbonization of wood byproducts from forest companies
|
250,000
|
7
|
Improvement of the drinking water system in the area of Imohoro
|
250,000
|
8
|
Implementation of an early warning and prevention system/Mitigation of harmful effects of abrupt climate change in local communities in RCA
|
500,000
|
9
|
Strengthening local community/authority capacities on the risks of abrupt climate change
|
250,000
|
10
|
Prevention against water-borne diseases and other seasonal pathologies in rural areas
|
500,000
|
Chad
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Capture of surface water for agriculture and provision of food for livestock
|
1,800,000
|
2
|
Diversification of cultures in Sudanese and Sahelian areas
|
1,200,000
|
3
|
Improvement and development of outreach activities to promote cultural calendar
|
1,000,000
|
4
|
Improvement of the information, education and communication means for adaptation to climate change
|
1,100,000
|
5
|
Construction of infrastructure to protect and preserve soils for the development of agricultural activities
|
1,100,000
|
6
|
Improvement of intercommunity pasture areas
|
1,500,000
|
7
|
Improvement of the quality of seasonal forecast for rain fall and surface water flow and their integration into an overall strategy for vulnerability
|
1,700,000
|
8
|
National observatory for climate change adaptation policies
|
1,600,000
|
9
|
Food bank for livestock
|
1,000,000
|
10
|
Reduction of the climate change related vulnerability of the populations/ management of risks induced by climate change
|
2,000,000
|
Comoros - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Varieties that are more adapted to drought
|
420,000
|
2
|
Increase in water supply
|
95,000
|
3
|
Improvement of water quality
|
80,000
|
4
|
Defence and restoration of degraded soils
|
500,000
|
5
|
Fight against malaria
|
175,000
|
6
|
Reconstitution of basin slopes
|
580,000
|
7
|
Use of local non metallic construction materials
|
1,025,000
|
8
|
Early warning
|
75,000
|
9
|
Introduction of FCM
|
132,000
|
10
|
Support to eye medical and surgical care
|
122,000
|
11
|
Short conservation of fish under ice
|
308,000
|
12
|
Provender production
|
900,000
|
13
|
Fodder production for goat breeding
|
100,000
|
Democratic Republic of Congo - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Energy related projects
|
10,577,520
|
2
|
The strengthening of agricultural production capacities: Multiplication of improved seeds of Corn, Rice and Cassava
|
5,658,760
|
3
|
Biodiversity conservation and restoration of Mangroves Marine Park
|
239,374
|
Djibouti - Project Priority Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Mitigation of climate change-related risks for the production system of coastal areas through an integrated, adapted and participatory management involving grassroots organisations
|
1,000,000
|
2
|
Promoting the fencing of forest areas in Day and Mabla coupled with the introduction of improved stoves
|
294,000
|
3
|
Implementation of restoration and management actions adapted to surface water
|
1,447,000
|
4
|
Improvement of rangeland management to mitigate the risks associated with traditional extensive livestock
|
1,700,000
|
5
|
Promotion of the integrated agro-pastoral industry and the development of irrigation techniques to control the salinisation of soils
|
765,000
|
6
|
Promoting the regeneration of pastures endogenous to the areas of Doda and Grand Bara
|
882,000
|
7
|
Restoration of protected sites through the protection of coral reefs and mangrove vegetation
|
529,000
|
8
|
Promoting protection measures adapted to the water supply infrastructures of the City of Djibouti
|
820,000
|
Equatorial Guinea
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Promote the sustainable development of the water sector, taking into account climate change, to enhance the access to water, in particular in the rural areas of Equatorial Guinea
|
4,500,000
|
2
|
Promote the resilience to climate change of the water sector in Equatorial Guinea
|
15,100,000
|
3
|
Promote the sustainable development of the urban and rural infrastructure in Equatorial Guinea (with a focus on the coastal province of the Continental Region and the Island of Bioko), taking into consideration climate change
|
6,900,000
|
4
|
Sustainable management of the fishing sector of Equatorial Guinea to ensure resilience to climate change and reduce vulnerability
|
7,000,000
|
5
|
Sustainable management of the forest in Equatorial Guinea to maintain the integrity of the ecosystem and safeguard food security
|
9,000,000
|
6
|
Catalyse innovative climate finance in the mining industries towards long-term investments focusin on ecosystem-based adaptation in Equatorial Guinea
|
6,000,000
|
Eritrea - Priority Project Profiles
|
Priority Project Number
|
Priority ProjectTitle
|
Indicative Priority Project Cost (USD)
|
1
|
Introducing community based pilot rangeland improvement and management in selected agro-ecological areas in the eastern and northwestern lowlands rangelands
|
7,230,000
|
2
|
Introducing community based pilot projects to intensify existing production models, area and species specific in eastern and northwestern lowlands selecting suitable sheep and goat breeds
|
5,077,000
|
3
|
Encourage Afforestation and Agroforestry through Community Forestry Initiative
|
5,050,000
|
4
|
Groundwater recharge for irrigation wells
|
7,252,000
|
5
|
Increase agricultural production through spate irrigation and range development
|
8,540,000
|
Ethiopia - Priority project Profiles
|
Priority Project Number
|
Priority Title
|
Indicative Priority Project Cost (USD)
|
1
|
Promoting drought/crop insurance program in Ethiopia
|
8,000,000
|
2
|
Strengthening/enhancing drought and flood early warning systems in Ethiopia
|
10,000,000
|
3
|
Development of small scale irrigation and water harvesting schemes in arid, semi-arid, and dry subhumid areas of Ethiopia
|
30,000,000
|
4
|
Improving/enhancing rangeland resource management practices in the pastoral areas of Ethiopia
|
2,000,000
|
5
|
Community based sustainable utilization and management of wet lands in selected parts of Ethiopia
|
2,000,000
|
6
|
Capacity building program for climate change adaptation in Ethiopia
|
3,000,000
|
7
|
Realizing food security through multi-purpose largescale water development project in Genale-Dawa Basin
|
700,000,000
|
8
|
Community Based Carbon Sequestration Project in the Rift Valley System of Ethiopia
|
1,000,000
|
9
|
Establishment of national research and development (R&D) center for climate change
|
2,000,000
|
10
|
Strengthening malaria containment program(MCP) in selected areas of Ethiopia
|
6,000,000
|
11
|
Promotion of on farm and homestead forestry and agro-forestry practices in arid, semi-arid and dry-sub humid parts of Ethiopia
|
5,000,000
|
Gambia - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Rehabilitation of Early Warning Systems on Climate Related Natural Hazards
|
450,000
|
2
|
Improvement of Fresh Water Availability
|
910,000
|
3
|
Diversification and Intensification of Agricultural Production, Processing, and Marketing
|
2,710,000
|
4
|
Expansion of Community Participation in the Management of Forests and Protected Areas
|
1,412,000
|
5
|
Expansion and Intensification of Agro-forestry and Reforestation Activities
|
2,753,000
|
6
|
Briquetting and Carbonization of Groundnut Shells
|
230,000
|
7
|
Reduction of climate change related diseases
|
1,217,000
|
8
|
Improved livestock and rangeland management for food security and environmental sustainability
|
2,800,000
|
9
|
Restoration/Protection of coastal environments
|
2,300,000
|
10
|
Increasing fish production through aquaculture and conservation of post harvest fishery products
|
300,000
|
Guinea - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Promotion of sylviculture 1. Support to the development of community and private plantations of cashew
|
600,000
|
2
|
Promotion of sylviculture 2. Assistance for the implementation of community-based forest management plans
|
600,000
|
3
|
Valorisation of positive local knowledge and practices
|
300,000
|
4
|
Promoting adaptation-oriented technologies. 1. Training of the coastal community on environmental friendly techniques to exploit oysters from mangrove ecosystems
|
250,000
|
5
|
Promoting adaptation-oriented technologies. 2. Promotion of sea salt production based on solar energy
|
300,000
|
6
|
Promoting adaptation-oriented technologies. 3. Dissemination of soil conservation practices
|
300,000
|
7
|
Promoting adaptation-oriented technologies. 4. Intensification of bulrush millet crops in the North region of Guinea
|
600,000
|
8
|
Promoting adaptation-oriented technologies. 5. Implementation of a system of early warning climate forecasts to protect agricultural production
|
350,000
|
9
|
Promoting adaptation-oriented technologies. 6. Promoting the use of solar energy for fish drying to reduce pressure on mangroves
|
200,000
|
10
|
Promoting adaptation-oriented technologies. 7. Training on and dissemination of techniques of making compacted bricks to mitigate the environmental impacts of cooking bricks
|
350,000
|
11
|
Promoting adaptation-oriented technologies. 8. Promotion of wire fencing and hedge planting in Moyenne Guinea
|
150,000
|
12
|
Promotion of fire management techniques and fencing
|
300,000
|
13
|
Protection of cultivated areas neighboring the coast
|
350,000
|
14
|
Promotion of and sensitization on Multilateral Agreements on Environment and national legal texts related to the protection and sustainable use of natural resources
|
300,000
|
15
|
Promoting Environmental Education for coastal communities
|
200,000
|
16
|
Promoting the restoration and integrated management of small-scale hydraulic infrastructures. 1. Construction of multiple use small-scale dams
|
600,000
|
17
|
Promoting the restoration and integrated management of small-scale hydraulic infrastructures. 2. Construction of artificial lakes
|
180,000
|
18
|
Promoting the restoration and integrated management of small-scale hydraulic infrastructures. 3. Construction of improved wells
|
250,000
|
19
|
Promoting the restoration and integrated management of small-scale hydraulic infrastructures. 4. Surface water potabilisation by means of hydropur
|
320,000
|
20
|
Promoting the restoration and integrated management of small-scale hydraulic infrastructures 5. Dissemination of techniques of impluvia
|
280,000
|
21
|
Protection of spawning areas in Fatale, Konkoure and Mellacore estuaries
|
250,000
|
22
|
Rehabilitation of hydro-agricultural system of plains and lowlands 1. Implementation of irrigated rice cultivation in Moyenne and Haute Guinea
|
300,000
|
23
|
Promoting income-generating activities 1. Intensification of small ruminant breeding
|
325,000
|
24
|
Promoting income-generating activities 2. Development and promotion of vegetable growing
|
250,000
|
25
|
Promoting income-generating activities 3. Implementation of a ranch for cane rats to prevent unsustainable hunting of wildlife
|
300,000
|
Guinea Bissau - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Support to Diversification of Production and Food Diet Project
|
600,000
|
2
|
Improvement of Water Supply in Rural Zones Project
|
1,000,000
|
3
|
Capacity building in Prevention and Protection of Mangrove Bolanhas against High-Tide Invasion Project
|
600,000
|
4
|
Observatory for Mangrove Monitoring and Evaluation Project
|
800,000
|
5
|
Monitoring of Coastal Area Erosion
|
400,000
|
6
|
Assessment of Impact of Climate Changes in Producers' Sectors Project
|
350,000
|
7
|
Promotion of Small-scale Irrigation in Geba and Corubal rivers Project
|
800,000
|
8
|
Prevention of Natural Catastrophes Project
|
300,000
|
9
|
Protection, Conservation and Enhancement of Fishing and Coastal Resources Project
|
450,000
|
10
|
Integrated System of Information on Food Security Project (SISA)
|
300,000
|
11
|
Environmental Education and Communication in Coastal Areas Project
|
200,000
|
12
|
Rehabilitation of Small Perimeters of Mangrove Soils for Rice Growing in Tombali, Quinara, Bafata and Oio Project
|
500,000
|
13
|
Support to Production of Short-Cycle Animals Project
|
400,000
|
14
|
Project of Reforestion of Degraded Areas
|
500,000
|
Haiti - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Watershed restoration, soil conservation and reforestation in South and Grand-Anse Provinces
|
1,656,250
|
2
|
Watershed restoration of River Grise in West Province
|
1,176,470
|
3
|
Watershed restoration of River la Quinte (Duree Ravine) and Support to the agricultural production in Artibonite Province against negative effects of extreme climatic conditions
|
1,938,548
|
4
|
Project of flood mitigation and improvement of agricultural production through the rehabilitation of watersheds in Northwest and Northeast Provinces
|
3,564,479
|
5
|
Watershed restoration, soil conservation and reforestation in Southeast Province
|
2,813,060
|
6
|
Restoration and protection of coastal areas in Northwest and Northeast Provinces
|
3,004,466
|
7
|
Restoration and protection of coastal areas in West Province
|
2,775,960
|
8
|
Restoration and protection of coastal areas in South and Grand-Anse Provinces
|
2,123,500
|
9
|
Reforestation, preservation and protection of fruit and forest species in Southeast Province
|
892,650
|
10
|
Restoration and protection of natural sites in Northeast Province
|
2,785,000
|
11
|
Improved management of natural resources in Artibonite Province
|
266,200
|
12
|
Support to the enhancement of agricultural production capacity in Jean Rabel
|
417,353
|
13
|
Construction of reservoirs at household and community levels in Grand-Anse Province
|
828,955
|
14
|
Rehabilitation of twenty five (25) water supply infrastructures in four (4) Farwest districts
|
220,932
|
Kiribati - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (AUD)
|
1
|
Water Resource Adaptation Project
|
3,168,405
|
2
|
Simple well improvement
|
336,470
|
3
|
Coastal zone management and resilience enhancement for adaptation
|
1,937,280
|
4
|
Strengthening Environmental, Climate Change Information and Monitoring
|
317,410
|
5
|
Management of Institutional Strengthening for NAPA
|
319,440
|
6
|
Upgrading of meteorological services
|
492,310
|
7
|
Agricultural food crop development
|
1,555,230
|
8
|
Coral Reef Restoration, monitoring and stock enhancement
|
586,750
|
9
|
Upgrading, restoring, enhancing resilience of coastal defenses and causeways
|
5,670,750
|
10
|
Enabling Kiribati effective participation at regional and international forums on climate change
|
105,000
|
Lao People's Democratic Republic
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Strengthen the capacity of the National Disaster Management Committees
|
1,000,000
|
2
|
Promote secondary professions in order to improve the livelihood of farmers affected by natural disasters induced by climate change
|
820,000
|
3
|
Continue the slash and burn eradication program and permanent job creation program
|
12,600,000
|
4
|
Strengthen capacity of village forestry volunteers in forest planting, caring and management techniques as well as the use of village forests
|
900,000
|
5
|
Awareness raising on water and water resource management
|
100,000
|
6
|
Mapping of flood-prone areas
|
650,000
|
7
|
Establish an early warning system for flood prone areas, and improve and expand meteorology and hydrological networks and weather monitoring systems
|
2,200,000
|
8
|
Strengthen institutional and human resource capacities related to water and water resource management
|
200,000
|
9
|
Survey underground water sources in drought prone areas
|
2,350,000
|
10
|
Study, design and build multi-use reservoirs in drought prone areas
|
2,350,000
|
11
|
Improve systems for the sustainable use of drinking water and sanitation with community participation in flood and drought prone areas
|
440,000
|
12
|
Improve knowledge and skills of engineers who design and build water sanitation system
|
300,000
|
Lesotho - Priority Project Profiles
|
Prirority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Improve Resilience of Livestock Production Systems Under Extreme Climatic Conditions in Various Livelihood Zones in Lesotho
|
2,980,000
|
2
|
Promoting Sustainable Crop Based Livelihood Systems in Foothills, Lowlands and Senqu River Valley
|
4,235,000
|
3
|
Capacity Building and Policy Reform to Integrate Climate Change in Sectoral Development Plans
|
1,260,000
|
4
|
Improvement of an Early Warning System Against Climate Induced Disasters and Hazards
|
920,000
|
5
|
Securing Village Water Supply for Communities in the Southern Lowlands
|
1,170,000
|
6
|
Management and Reclamation of Degraded and Eroded Land in the Flood Prone Areas (Pilot Project for Western Lowlands)
|
966,000
|
7
|
Conservation and Rehabilitation of Degraded Wetlands in the Mountain Areas of Lesotho
|
690,000
|
8
|
Improvement of Community Food Security Through the Promotion of Food Processing and Preservation Technologies
|
620,000
|
9
|
Strengthening and stabilizing ecotourism based rural livelihoods
|
NA
|
10
|
Promote Wind, Solar and Biogas Energy Use as a Supplement to Hydropower Energy
|
NA
|
11
|
Stabilising Community Livelihoods which are Adversely Affected by Climate Change Through Improvement of Small Scale Industries
|
NA
|
Liberia - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Integrated Cropping/Livestock Farming: Enhancing resilience to increasing rainfall variability through the diversification of crop cultivation and small ruminants rearing
|
5,000,000
|
2
|
Improved Monitoring of Climate Change: Enhance adaptive capacity through the rebuilding of the national hydro-meteorological monitoring system and improved networking for the measurement of climatic parameters
|
3,000,000
|
3
|
Coastal Defense System for the Cities of Buchanan and Monrovia: Reducing the vulnerability of coastal urban areas (Monrovia, Buchanan) to erosion, floods, siltation and degraded landscapes
|
60,000,000
|
Madagascar - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Rehabilitation and/or construction of protective dams and dykes
|
250,000
|
2
|
Implementation and Mobilization of water management associations
|
60,000
|
3
|
Support to the intensification of crop and livestock production
|
270,000
|
4
|
Implementation of erosion control measures through soil conservation techniques and dune stabilization
|
135,000
|
5
|
Implementation of simple structure and/or capacity building plan for the decentralized Meteological service
|
113,620
|
6
|
Implementation of dams and dykes to control the gradual rise of sea level
|
150,000
|
7
|
Rehabilitation of degraded coastal areas
|
32,500
|
8
|
Reforestation of rural areas with their specific reforestation plans based on locally appropriate species
|
74,250
|
9
|
Promoting the transfer of forest management to local communities (GELOSE, GCF)
|
94,980
|
10
|
Implementation of communication infrastructure in areas of high potential production capacity to increase exchange and trade
|
199,980
|
11
|
Promoting the use of information-, education- and communication-sharing systems to reach rural communities
|
270,000
|
12
|
Promoting the use of communication system to educate and raise awareness on health issues among the population
|
135,000
|
13
|
Implementation of Capacity building to strengthen the health system
|
135,000
|
14
|
Mobilization of necessary resources to prevent and control disease vectors
|
150,000
|
15
|
Elaboration of information-sharing and awareness raising on the design and construction principles about infrastructures adapted to climate change
|
60,000
|
Malawi - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Improving community resilience to climate change through the development of sustainable rural livelihoods
|
4,500,000
|
2
|
Restoring forests in the Upper, Middle and Lower Shire Valleys catchments to reduce siltation and the associated water flow problems
|
2,000,000
|
3
|
Improving agricultural production under erratic rains and changing climatic conditions
|
3,000,000
|
4
|
Improving Malawi's preparedness to cope with droughts and floods
|
8,000,000
|
5
|
Improving climate monitoring to enhance Malawi's early warning capability and decision making and sustainable utilization of Lake Malawi and lakeshore areas resources
|
5,430,000
|
Maldives - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Integration of Future Climate Change Scenarios in the Safer Island Strategy to Adapt Sea Level Rise and Extreme Weather Risks Associated with Climate Change
|
248,820
|
2
|
Coastal Protection of Safer Islands to Reduce the Risk from Sea Induced Flooding and Predicted Sea Level Rise
|
3,055,000
|
3
|
Enhance adaptive capacity to manage climate change related risks to fresh water availability by appropriate technologies and improved storage facilities
|
9,300,000
|
4
|
Coastal Protection of Male' International Airport to Reduce the Risk from Sea Induced Flooding and Predicted Sea Level Rise
|
900,000
|
5
|
Enhance adaptive capacity to manage climate change related risks to fresh water availability by appropriate wastewater treatment technologies
|
1,500,000
|
6
|
Increase the resilience of local food production through enhancing the capacity of farmers, local communities to address food security issues caused by climate change and climate variability
|
825,000
|
7
|
Improve the health status of the population by the prevention and management of vector-borne diseases caused by changes in temperature and flooding due to extreme rainfall
|
350,000
|
8
|
Improve resilience of Island communities to climate change and variability through sustainable building designs
|
1,970,000
|
9
|
Investigating alternative live bait management, catch, culture and holding techniques in the Maldives to reduce vulnerability of the tuna fishery sector to the predicted climate change and variability
|
1,027,000
|
10
|
Improve the design and construction of access infrastructure in Maldives to increase the resilience of access infrastructure and island beaches to climate change
|
3,800,000
|
11
|
Increase resilience of coral reefs to reduce the vulnerability of islands, communities and reef dependant economic activities to predicted climate change
|
1,062,000
|
Mali - Priority Project Profiles
|
Project Number
|
Priority Title
|
Indicative Project Cost (USD)
|
1
|
Agricultural extension of improved food crop varieties adapted to climate change
|
300,000
|
2
|
Agricultural extension of animal and plant species with the highest adaptation potential to climate change
|
350,000
|
3
|
Promotion of income-generating activities and development of mutual assistance
|
350,000
|
4
|
Rehabilitation of aquaculture sites in Mali
|
25,760,000
|
5
|
Promoting cereal stocks
|
500,000
|
6
|
Promoting the use of meteorological information to improve agricultural production and contribute to food security
|
2,000,000
|
7
|
Low land Improvement
|
2,000,000
|
8
|
Implementation of drilling equipped with solar- or wind-driven systems
|
1,500,000
|
9
|
Energy Valorisation from Typha australis
|
2,000,000
|
10
|
Contribution to barrier removal for the promotion of the use of solar energy in Mali
|
1,500,000
|
11
|
Implementation of a runoff water harvesting system and restoration of water points (backwater, ponds and lakes)
|
280,000
|
12
|
Sensitization and organization of the population for the preservation of natural resources (elaboration of local conventions on reforestation and agroforestry)
|
2,000,000
|
13
|
Management of brush fire in Mali
|
3,000,000
|
14
|
Intensification of soil conservation actions and composting
|
1,500,000
|
15
|
Intensification of fodder crop
|
500,000
|
16
|
Elaboration of a technological package of training for the population with simple adaptation practices to climate change
|
500,000
|
17
|
Promotion of fodder stock for livestock
|
220,000
|
18
|
Promotion of Jatropha oil
|
5,000,000
|
19
|
Implementation of an information system on climate change risk-related diseases
|
500,000
|
Mauritania - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Contribution to a better knowledge of the surface water regimes in twenty (20) catchment areas
|
423,990
|
2
|
Contribution to increased value of surface water by construction of twelve (12) flooding deceleration gates: pluvial zones (Guidimakha) and especially oasis zones (Adrar)
|
604,170
|
3
|
Promotion of water-saving techniques in oasis zones
|
1,200,000
|
4
|
Introduction of 50 electric Moto-Pumps in the valley
|
1,050,630
|
5
|
Support to the dissemination of the drip technique in the river valley and the oasis zones for the development of 300 hectares
|
433,990
|
6
|
Promotion of livestock mobility
|
300,000
|
7
|
Reorganisation of the communities adversely affected by climate change
|
600,000
|
8
|
Promotion and development of domestic poultry-farming
|
300,000
|
9
|
Improvement of cultivation methods in pluvial zones
|
1,270,000
|
10
|
Substitution of ligneous fuel
|
700,000
|
11
|
Participatory reforestation for energy and agro-forestry in agricultural zones
|
1,000,000
|
12
|
Genetic improvement of locale bovine breeds
|
500,000
|
13
|
Improvement of the management of underground water in Aftout
|
250,000
|
14
|
Protection of the diversity of the fish population and prevention of over-fishing with a view to sustainable development
|
1,337,000
|
15
|
Introduction of new fodder species in the natural routes
|
600,000
|
16
|
Protection and reinforcement of the dune bar
|
1,018,000
|
17
|
Training and informing of SPOs and CEs
|
1,180,000
|
18
|
Treatment of unrefined fodder and manufacture and use of multi-nutritional blocks
|
300,000
|
19
|
Restoration and integrated management of the lowlands and wetlands
|
NA
|
20
|
Development of fodder crops
|
600,000
|
21
|
The study and monitoring of water quality in Magta Lahjar, Tintane and Wompou
|
1,000,000
|
22
|
Establishment of production unit for livestock fodder
|
NA
|
23
|
Support for the experimental use dissemination of the drip method in the oasis zones
|
400,000
|
24
|
The implementation of a safeguard plan for the town of Nouakchott and its infrastructures
|
2,091,000
|
25
|
Improvement of knowledge about, and sustainable management of, the forest resources
|
300,000
|
26
|
Fixation of shifting dunes threatening the country's socio-economic infrastructures
|
1,500,000
|
27
|
Support for better monitoring of the piezometric networks of the Aioun sandstones and of the Hodhs Pelites
|
800,000
|
28
|
Institutional reinforcement of the structure responsible for nature conservation
|
400,000
|
Mozambique - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Strengthening of early warning system
|
2,700,000
|
2
|
Strengthening of capacities of agricultural producers to deal with climate change
|
2,500,000
|
3
|
Reduction of the impact of climate change in coastal zones
|
2,000,000
|
4
|
Management of Water resources under the framework of climate change
|
2,000,000
|
Myanmar *
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Reduced climate change vulnerability of rural and subistance farmers through locally relevant technologies, climate-resilient rice varieties, and ex/in-situ conservation of plant genetic resources
|
1,500,000
|
2
|
Improving weather observation capacity through a mobile/deployable weather radar/system for providing early warning systems against extreme weather events
|
3,000,000
|
3
|
Building the resilience of degraded/sensitive forest areas to climate change impacts through reforestation
|
3,500,000
|
4
|
Increased climate change resilience of rural and subsistence farmers in the Dry and Hilly Zones through legume crop diversification and climate-resilient varieties
|
1,500,000
|
5
|
Developing a flood early warning system for reducing the vulnerability of local communities to climate change impacts
|
1,000,000
|
6
|
Community-based reforestation for climate-resilient ecosystems and rural livelihoods in degraded watershed areas of the Central Dry Zone
|
2,500,000
|
7
|
Increasing the climate change resilience of Dry Zone communities by diversifying and intensifying home-gardens through solar power technology, high-income fruit crops and climate-smart agriculture approaches
|
1,500,000
|
8
|
Assessing the hydrological impact of climate change on river systems
|
1,500,000
|
9
|
Community-based mangrove restoration for climate-resilient ecosystems and rural livelihoods in vulnerable and degraded coastal regions
|
2,500,000
|
10
|
Reducing the vulnerability of livelihoods in agro-ecological zones to climate change through the transfer of a wide range of high-yielding and climate-resilient rice varieties
|
1,500,000
|
11
|
Developing a drought early warning system for reducing the vulnerability of local communities to climate change impacts
|
1,500,000
|
12
|
Enhancing the climate change resilience of rural livelihoods through community-based restoration at the Indwagyi and Inle Lake watershed areas in the Norther Hilly Region
|
2,500,000
|
* 20 additional priority projects of second, third and fourth levels of importance are also listed in Myanmar NAPA
Nepal
|
Priority (Combined) Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Promoting community-based adaptation through integrated management of agriculture, water, forest and biodversity sector
|
50,000,000
|
2
|
Building and enhancing adaptive capacity of vulnerable communities through improved system and access to services related to agricultural development
|
44,000,000
|
3
|
Community-based disaster management for faciilitating climate adaptation
|
60,000,000
|
4
|
GLOF monitoring and disaster risk reduction
|
55,000,000
|
5
|
Forest and ecosystem management for supporting climate led adaptation innovations
|
25,000,000
|
6
|
Adapting to climate challenges in public health
|
15,000,000
|
7
|
Ecosystem management for climate adaptation
|
31,000,000
|
8
|
Empowering vulnerable communities through sustainable management of water resources and clean energy supply
|
40,000,000
|
9
|
Promoting climate smart urban settlement
|
30,000,000
|
Niger - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Introducing fodder crop species in pastoral areas
|
NA
|
2
|
Creating Livestock Food Banks
|
NA
|
3
|
Restoring basins for crop irrigation
|
NA
|
4
|
Diversifying and Intensifying crop irrigation
|
NA
|
5
|
Promoting peri-urban market gardening and livestock farming
|
NA
|
6
|
Promoting income-generating activities and developing mutual benefit societies
|
NA
|
7
|
Exploitation of surface and ground water
|
NA
|
8
|
Producing and disseminating meteorological data
|
NA
|
9
|
Creating Food Banks
|
NA
|
10
|
Contributing to fight against climate-related diseases
|
NA
|
11
|
Improving erosion control actions (CES/DRS) for agricultural, forestry and pastoral purposes
|
NA
|
12
|
Improving erosion control actions (CES/DRS) for agricultural, forestry and pastoral purposes
|
NA
|
13
|
Disseminating animal and crop species that are most adapted to climatic conditions
|
NA
|
14
|
Watershed protection and rehabilitation of dump-off ponds
|
NA
|
15
|
Building of material, technical and organizational capacities of rural producers
|
NA
|
Rwanda - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Lands conservation and protection against erosion and floods at districts level of vulnerable regions to climate change
|
1,450,000
|
2
|
Mastering hydro meteo-rological information and early warning systems to control extreme phenomena due to climate change: - Installation and rehabilitation of hydrological and meteorological stations
|
1,900,000
|
3
|
Development of irrigated areas by gravity water systems from perennial streams and rivers in often vulnerable zones to prolonged droughts
|
750,000
|
4
|
Support to Districts of vulnerable regions to climate change in planning and implementing measures and techniques related to land conservation, water harvesting and intensive agriculture, and promoting existing and new resistant varieties of crops adapted to different bioclimatic soil
|
560,000
|
5
|
Increase adaptive capacity of grouped settlement "Imidugudu" located in vulnerable regions to climate change by the improvement of potable water, sanitation and alternative energy services, and the promotion of non agricultural jobs
|
1,650,000
|
6
|
Increase food and medicine modes of distribution to respond to extreme climate change and sensitize to stocking and conservation of agriculture products
|
850,000
|
7
|
Preparation and implementation of woody combustible substitution national strategy to combat deforestation and erosion as well
|
950,000
|
Samoa - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Securing Community Water Resource Project
|
505,000
|
2
|
Reforestation, Rehabilitation & Community Forestry Fire Prevention Project
|
417,500
|
3
|
Climate Health Cooperation Program Project
|
620,000
|
4
|
Climate Early Warning System Project
|
4,500,000
|
5
|
Agriculture & Food Security Sustainability Project
|
320,000
|
6
|
Zoning & Strategic Management Planning Project
|
400,000
|
7
|
Implement Coastal Infrastructure Management Plans for Highly Vulnerable District Project
|
450,000
|
8
|
Establishing Conservation Programs in Highly Vulnerable Marine & Terrestrial Areas of Communities Project
|
350,000
|
9
|
Sustainable Tourism Adaptation Project
|
250,000
|
Sao Tome and Principe - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Training and readapt project of the new navigation technologies and fishing equipment for fishermen
|
350,000
|
2
|
Establishing a system of climate alert
|
500,000
|
3
|
Communication action for behavior change
|
152,500
|
4
|
Construction and installation of Device for Fish Concentration (DFC) on costal zone
|
250,000
|
5
|
Construction of two drinking water supply systems in the rural zone
|
1,000,000
|
6
|
Reinforcement and diversification of agricultural production
|
1,650,000
|
7
|
Integrated project of development (cow and sheep) in the north part of S. Tome island
|
900,000
|
8
|
Sustainable management of forestall resources
|
2,915,000
|
9
|
Relocation of local community (Malanza, Sta Catarina and Sundy) at risk of floods and landfalls
|
500,000
|
10
|
Construction of Infrastructure for protection of vulnerable communities
|
300,000
|
11
|
Introduction of the new technology for use firewood and to make charcoal
|
500,000
|
12
|
Establishing agricultural tourism at Monte Cafe e Porto Real
|
600,000
|
13
|
Make an epidemic data base about potential diseases related to CC
|
21,250
|
14
|
Elaboration of strategic and emergency plans emphasizing the health sector
|
36,250
|
15
|
Reinforcement of Human Technical Capacity of National Civil Protection and Firework
|
200,000
|
16
|
Training and study visits (doctors, nurses, volunteers, students, etc..) for emergency needs
|
215,000
|
17
|
Sustainable management of water and energy
|
300,000
|
18
|
Correlate data diseases of vector origin, focus on malaria, through system GIS with MARA/OMS initiative foreseeing the spatial risk of the problem (epidemic malaria)
|
200,000
|
19
|
Introduction of renewable energy
|
500,000
|
20
|
Construction of two hydro power-stations, at Claudino Faro and Bernardo Faro
|
500,000
|
21
|
Evaluation and planning the water resources
|
400,000
|
22
|
Strengthening the car parking of the National Civil Protection and Firework
|
350,000
|
Senegal - Priority Project Profiles (French)
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Implementation of agroforestry in: A) North Region, B) Bassin Arachidier Region, C) South Region: Tambacounda, Kolda, Ziguinchor, D) Niayve Region
|
11,746,000
|
2
|
Sustainable use of water. 1. Revitalization of lowland water system, temporary ponds and artificial lakes in support to the retention basin program. 2. Promoting drip irrigation
|
6,652,000
|
3
|
Protection of the coastal region. 1. Reforestation of coastal sites. 2. Implementation of technical infrastructures. 3. Restoration of mangrove vegetation. 4. Implemention of alternative measures to the exploitation of coastal sand. 5. Implemention of institutional measures
|
40,624,000
|
4
|
Awareness raising and Education
|
160,000
|
Sierra Leone - Priority project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Develop an Early Warning System in Sierre Leone
|
751,950
|
2
|
Rehabilitation & Reconstruction of meteorological/climate monitoring stations throughout the country
|
1,231,651
|
3
|
Capacity building of the Meteorological Department through training of personnel for the country's adaptation to climate change
|
152,800
|
4
|
Sensitization and awareness raising campaigns on climate change impacts on women relating to the three conventions of biodiversity, desertification and climate change
|
132,000
|
5
|
Development of Inland Valley Swamps for Rice Production in the Moyamba District
|
1,075,000
|
6
|
Development of an Integrated Natural Resources and Environmental Management programme for Sierra Leone
|
1,265,000
|
7
|
Development of Irrigation and drainage systems for agricultural production in the Bombali District
|
1,055,000
|
8
|
Promotion of the use of renewable energy (Solar Energy) in Sierra Leone and improvement of energy efficiency and conservation of energy resources
|
1,500,000
|
9
|
Establishment of new Forest Reserves, Protected Areas and National Parks in Sierra Leone
|
2,500,000
|
10
|
Management and Protection of Forest Reserves and Catchment areas including Wetlands
|
5,000,000
|
11
|
Institutional Strengthening of the Water Resources Sector in Sierra Leone
|
2,250,000
|
12
|
Improvement of The Efficiency of Existing Water Supply Systems in both Urban And Rural Areas of Sierra Leone
|
2,950,000
|
13
|
Promotion of Rain Water Harvesting and Development of an Integrated Management System for Fresh Water Bodies
|
2,800,000
|
14
|
Establishment of a Permanent Study Programme of the Multi Species Fisheries in Sierra Leone
|
395,000
|
15
|
Delineation and Restoration of Vulnerable Habitats And Ecosystems in The Western Area of Sierra Leone
|
420,000
|
16
|
Improve on the Quality on Fisheries Related Data and Research
|
455,000
|
17
|
Development of an Integrated Coastal Zone Management Plan for Sierra Leone
|
90,000
|
18
|
Rehabilitation of degraded coastal habitats in the Northern Region of Sierra Leone
|
317,000
|
19
|
Develop and enact appropriate policies and regulations relevant to the development of coastal communities, urban growth planning, and critical coastal ecosystems preservation
|
60,000
|
20
|
Establishment of a National Sea-Level Observing System for Sierra Leone
|
180,000
|
21
|
Monitoring and control of malaria in the Moyamba district of Sierra Leone
|
520,000
|
22
|
Monitoring and control of water and sanitation activities in the Koinadugu District of Sierra Leone
|
1,680,000
|
23
|
Monitoring and control of HIV/AIDS prevention activities in the Koinadugu district of Sierra Leone
|
1,200,000
|
24
|
Monitoring, evaluation and control of water and sanitation activities in slum areas of Freetown, the capital city of Sierra Leone
|
2,070,000
|
Solomon Islands - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Managing the impact of, and enhancing resilience to, climate change and sea-level rise, on agriculture and food security, water supply and sanitation, human settlement, human health and education, awareness and information
|
6,500,000
|
2
|
Climate change adaptation on low-lying and artificially built-up islands in Malaita and Temotu
|
3,500,000
|
3
|
Waste management
|
1,500,000
|
4
|
Coastal protection
|
1,750,000
|
5
|
Fisheries and marine resources
|
1,500,000
|
6
|
Infrastructure development
|
2,000,000
|
7
|
Tourism
|
500,000
|
Somalia
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Sustainable land management to build resilient rural livelihoods and enable national food security
|
6,450,000
|
2
|
Integrated water resources management to ensure water access and supply to vulnerable populations and sectors
|
8,100,000
|
3
|
Reducing risks among vulnerable populations from natural disasters
|
4,100,000
|
Sudan - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Enhancing resilience to increasing rainfall variability through rangeland rehabilitation and water harvesting in the Butana area of Gedarif State
|
2,800,000
|
2
|
Reducing the vulnerability of communities in drought-prone areas of southern Darfur State through improved water harvesting practices
|
2,500,000
|
3
|
Improving sustainable agricultural practices under increasing heatstress in the River Nile State
|
2,350,000
|
4
|
Environmental conservation and biodiversity restoration in northern Kordofan State as a coping mechanism for rangeland protection under conditions of increasing climate variability
|
2,400,000
|
5
|
Adapting to Strategies to adapt to drought-induced water shortages in highly vulnerable areas in Central Equatorial State
|
5,000,000
|
Tanzania - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Priority Project Cost (USD)
|
1
|
Improving food security in drought-prone areas by promoting drought-prone tolerant crops
|
8,500,000
|
2
|
Improving water availability to drought-stricken communities in the central part of the country
|
800,000
|
3
|
Shifting of shallow water wells affected by inundation on the coastal regions of Tanzania mainland and Zanzibar
|
3,300,000
|
4
|
Climate change adaptation through participatory reforestation in Kilimanjaro mountain
|
3,300,000
|
5
|
Community-based mini-hydro for economic diversification as a result of climate change in same district
|
620,000
|
6
|
Combating malaria epidemic in newly mosquito-infested areas
|
650,000
|
Timor-Leste
|
Priority Project Number
|
Priority Project Title
|
Priority Project Cost (USD)
|
1
|
Building resilience of rural livelihoods to secure national food security
|
3,600,000
|
2
|
Promotion of integrated water resource management (IWRM) to guarantee water access to people in the context of increasing climate risks
|
3,700,000
|
3
|
Enhancing capacity of the health sector to anticipate and respond to changes and reduce vulnerability of the population at risk from expansion of climate-related disease
|
1,700,000
|
4
|
Improving institutional, human resource capacity and information management in the disaster sector in relation to climate change induced risks at national, district and community levels
|
2,600,000
|
5
|
Restoration and conservation of mangrove ecosystems and awareness raising to protect coastal ecosystems exposed to sea level rise
|
3,000,000
|
6
|
Improved strategic planning, institutional frameworks and methodologies to promote sustainable, integrated livestock production under climate change conditions
|
2,300,000
|
7
|
Review and revise legislation, regulations and standards to enhance climate change resilient infrastructure
|
2,000,000
|
8
|
Support to the ambitious national poverty reduction target (cf. draft Timor-Leste strategic development plan 2011-2030) in relation to the expected increased storm intensity at sea by improving capacity to forecast and adapt offshore oil and gas infrastructure to withstand strong storms and waves
|
1,100,000
|
9
|
National institutional capacity development to build and enhance Timor-Leste's capacity to coordinate/integrate climate change into strategic planning in moving towards sustainable development and poverty reduction
|
1,300,000
|
Togo
|
Priority Project Number
|
Priority Project Title
|
Priority Project Cost (USD)
|
1
|
Adaptation of the agricultural production systems in three regions through the development of techniques that integrate climate change and improve agro-meteorological information
|
3,500,000
|
2
|
Development of an early warning system for real time information on floods in the Maritime and Savanes regions
|
6,250,000
|
3
|
Reinforcing the coastal protection system against coastal erosion in the East part of Lomé
|
3,000,000
|
4
|
Support and assistance to the rural communities of the regions of Savanes and Plateaux to prevent and fight vector borne diseases
|
2,000,000
|
5
|
Developing the irrigation zones of the low-lands for the market gardener communities in the Centrale, Kara and Savanes regions as a mean to stop rural exodus
|
2,150,000
|
6
|
Enhancing the livelihood of market gardener communities and fishermen in the coastal zone to increase capacity to adapt to the adverse effects of climate change
|
2,150,000
|
7
|
Assisting the collection of surface water in Savanes and Kara regions through watersheds with multiple goals
|
4,250,000
|
Tuvalu - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Priority Project Cost (USD)
|
1
|
Increasing resilience of Coastal Areas and Settlement to climate change
|
1,906,500
|
2
|
Increasing subsistence pit grown pulaka productivity through introduction of a salt-tolerant pulaka species
|
2,220,000
|
3
|
Adaptation to frequent water shortages through increasing household water capacity, water collection accessories, and water conservation techniques
|
2,675,300
|
4
|
Strengthening of Community health through control of vector borne/climate sensitive diseases and promotion access to quality potable water
|
381,500
|
5
|
Strengthening of Community Based Conservation Programmes on Highly Vulnerable near-shore Marine Ecosystems
|
636,500
|
6
|
Strengthening Community Disaster Preparedness and Response Potential
|
388,000
|
7
|
Adaptation to Near-Shore Coastal Shellfish Fisheries Resources and Coral Reef Ecosystem Productivity
|
462,000
|
Vanuatu
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Enhance food security and hence resilience of the economy to the adverse effects of climate change
|
2,000,000
|
2
|
Enhance adaptation to climate change in the tourism sector for Vanuatu
|
1,000,000
|
3
|
Enhance adaptive capacity and resilience of vulnerable communities to the impacts of climate change
|
1,000,000
|
4
|
Mainstream climate change issues in the country's sustainable forrest management policies and practices
|
1,000,000
|
5
|
Enhance resilience of watershed through integrated water resource management
|
1,000,000
|
Yemen
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Develop and implement integrated coastal zone management
|
3,200,000
|
2
|
Water construction through reuse of treated waste water and grey water from mosques, and irrigation saving techniques
|
3,200,000
|
3
|
Awareness raising on adaptation to climate changes
|
650,000
|
4
|
Establishment and maintaining of climate change database
|
350,000
|
5
|
Planting and re-planting of mangroves and palms for adaptation to sea level rise
|
2,450,000
|
6
|
Develop and implement programs to improve Yemen's preparedness to cope with extreme weather events
|
5,000,000
|
7
|
Rainwater harvesting through various techniques including traditional methods
|
2,810,000
|
8
|
Rehabilitation and maintenance of mountainous terraces
|
4,780,000
|
9
|
Promotion of research on drought, heat and salinity tolerant varieties
|
3,150,000
|
10
|
Sustainable land management to combat desertification and land degradation
|
2,330,000
|
11
|
Sustainable management of fisheries resources
|
1,180,000
|
12
|
Incorporation of climate chnage and adaptation into school education
|
820,000
|
Zambia - Priority Project Profiles
|
Priority Project Number
|
Priority Project Title
|
Indicative Priority Project Cost (USD)
|
1
|
Strengthening of early warning systems to improve services to preparedness and adaptation to climate change
|
1,800,000
|
2
|
Promotion of alternatives sources of livelihoods to reduce vulnerability to climate change/variability to communities living around GMAs
|
175,000
|
3
|
Adaptation to the Effects of Drought in the context of Climate Change in Agro-Ecological Region I of Zambia
|
3,000,000
|
4
|
Management of critical habitats
|
1,400,000
|
5
|
Promote natural regeneration of indigenous forests
|
1,000,000
|
6
|
Adaptation of land use practices (crops, fish, and livestock) in light of climate change
|
1,200,000
|
7
|
Maintenance and provision of water Infrastructure to communities to reduce Human-Wildlife Conflict
|
75,000
|
8
|
Eradication of Invasive Alien Species
|
1,000,000
|
9
|
Capacity building for improved environmental health in rural areas
|
3,000,000
|
10
|
Climate proofing sanitation in urban areas
|
2,000,000
|